EXHIBIT_E_-_Sheet_metal_Flashing_and_Trim.pdf

PDF 124 KB Posted

Attached to
224 W. Winton Building Roof Replacement
Solicitation number
902811
Issued by
Alameda County, Hayward City, California

About this file

This document is Section 07 6100 of the specifications for the County of Alameda's 224 W. Winton Building Roof Replacement project in Hayward, California, detailing requirements for sheet metal flashing and trim work. The specification encompasses fabricated sheet metal items including flashings, counterflashings, metal edge systems with continuous cleats, surface-mounted counterflashing, skirt flashing at curbs, step flashing, ladders, hatches, and coping. Materials required include aluminum conforming to ASTM B209 alloy 3105-H14 at 0.040-inch nominal thickness, with work performed in accordance with SMACNA Architectural Sheet Metal Manual standards and Factory Mutual 1-90 windstorm resistance requirements. The specification mandates comprehensive shop drawings indicating material profile, jointing patterns, fastening methods, and installation details, along with manufacturer's specification data sheets, color samples (8x10 and 12x12 inch formats), and certifications regarding roof manufacturer compatibility and wind uplift approval testing.

Quality assurance requirements include a manufacturer's 20-year non-prorated warranty covering fade, chalking, and film integrity with color variance limited to 5 NBS units and chalking not exceeding 8 units per ASTM standards, and a contractor-provided five-year notarized warranty ensuring all sheet metal work remains watertight and secure. Installation specifications require work performed without waves, warps, buckles, or distortion; fasteners spaced at 3-inch maximum intervals; joints formed at 10-foot maximum spacing; and flexible flashings installed in maximum feasible lengths to minimize lap joints. All sheet metal must be solvent-cleaned with concealed surfaces coated with asphaltic paint to 0.015-inch minimum thickness, and dissimilar metals must be isolated using asphaltic paint, sealer tape, or approved coatings with stainless steel fasteners. The specification references related sections for roof insulation, metal roof panels, and modified bituminous membrane roofing, ensuring coordination of all roofing system components.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07 6100 – Sheet Metal Flashing and Trim

SECTION 07 6100

SHEET METAL FLASHING AND TRIM

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Fabricated sheet metal items, including flashings, counterflashings, and other items indicated on drawings and as follows:

1. Metal edge system with continuous cleats.

2. Surface mounted counterflashing.

3. Skirt flashing at curbs.

4. “L” flashing and step flashing.

5. Ladders.

6. Hatches.

7. Coping.

8. Etc.

1.02 RELATED REQUIREMENTS

A. Section 07 22 16 – Roof Insulation

B. Section 07 41 13 – Metal Roof Panels

C. Section 07 55 00 – Modified Bituminous Membrane Roofing

1.03 REFERENCE STANDARDS

A. ASTM A 653/A 653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

B. ASTM A 666 - Standard Specification for Annealed or Cold-Worked Austenitic Stainless Steel Sheet, Strip, Plate, and Flat Bar.

C. ASTM A792 Steel Sheet, Aluminum-Zinc Alloy-Coated, by the Hot-Dip Process

D. ASTM B 32 - Standard Specification for Solder Metal.

E. ASTM B486 Paste Solder

F. ASTM B 749 - Standard Specification for Lead and Lead Alloy Strip, Sheet, and Plate Products.

G. ASTM D 226 - Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing.

H. ASTM D 2178 - Standard Specification for Asphalt Glass Felt Used in Roofing and Waterproofing.

I. ASTM D 4586 - Standard Specification for Asphalt Roof Cement, Asbestos-Free.

J. FS QQ-L-201 Specification for Lead Sheet

K. SMACNA (ASMM) - Architectural Sheet Metal Manual; Sheet Metal and Air Conditioning Contractors' National Association.

1.04 SUBMITTALS

A. Shop Drawings: Indicate material profile, jointing pattern, jointing details, fastening methods, flashings, terminations, and installation details.

1. For manufactured and shop fabricated gravel stops, fascia, scuppers, and all other sheet metal fabrications.

2. Indicate type, gauge and finish of metal.

B. Product data: Provide manufacturer's specification data sheets for each product :

1. Metal material characteristics and installation recommendations.

2. Submit color chart prior to material ordering and/or fabrication so that equivalent colors to those specific can be approved.

C. Manufacturer’s installation instructions for reglets.

D Samples: Submit two samples 8x10 inch in size illustrating metal finish color.

1. Submit two samples, 12 x 12 inch in size illustrating typical external corner, internal corner, and valley, junction to vertical dissimilar surface, material and finish.

E. Certification:

1. Submit roof manufacturer's certifications that metal fasteners furnished are acceptable to roof manufacturer.

2. Submit roof manufacturer's certification that metal furnished is acceptable to roofing manufacturer as a component of roofing system and is eligible for roof manufacturer's system warranty.

3. Submit certification that metal and fastening system furnished is Tested and Approved by Factory Mutual for 1-90 Wind Up-Lift Requirements.

F. Provide approval letters from metal manufacturer for use of their metal within this particular roofing system type.

G. Proof of fabricator and installer qualifications.

H. ANSI-SPRI ES-1 test results for all coping and edge metal.

1.05 QUALITY ASSURANCE

A. Perform work in accordance with SMACNA Architectural Sheet Metal Manual requirements, except as otherwise indicated.

1. Factory Mutual Loss Prevention Data Sheet 1-49 windstorm resistance: 1-90.

B. Manufacturer's Warranty: Pre-finished metal material shall require a written 20-year non-prorated warranty covering fade, chalking and film integrity. The material shall not show a color change greater than 5 NBS color units per ASTM D-2244 or chalking excess of 8 units per ASTM D-659. If either occurs material shall be replaced per warranty, at no cost to the Owner.

C. Contractor's Warranty: The Contractor shall provide the Owner with a notarized written warranty assuring that all sheet metal work including caulking and fasteners to be water-tight and secure for a period of five years from the date of final acceptance of the building. Warranty shall include all materials and workmanship required to repair any leaks that develop, and make good any damage to other work or equipment caused by such leaks or the repairs thereof.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in manufacturer's original, unopened containers or packages with labels intact and legible.

B. Stack material to prevent twisting, bending, and abrasion, and to provide ventilation.

Slope metal sheets to ensure drainage.

C. Prevent contact with materials that could cause discoloration or staining.

PART 2 PRODUCTS

2.01 SHEET MATERIALS

A. Aluminum, ASTM B209, alloy 3105-H14, in thickness.040” nom.

2.02 ACCESSORIES

A. Fasteners:

1. Corrosion resistant screw fastener as recommended by metal manufacturer.

Finish exposed fasteners same as flashing metal.

2. Fastening shall conform to Factory Mutual 1-90 requirements or as stated on section details, whichever is more stringent.

B. Plastic Cement: ASTM D 4586, Type I.

2.03 FABRICATION - GENERAL

A. Fabricate in accordance with referenced standards. Form sections true to shape, accurate in size, square, and free from distortion or defects. Form pieces as recommended by SMACNA standard for conditions required.

1. Provide reinforcements and supports as required for secure anchorage.

2. Make joints rigid. Seams mechanically strong and soldered or sealed to make watertight

3. Fabricate corners in one piece with legs extending 30-inches each way to field joint. Lap, rivet, and solder or seal corner seams watertight.

4. Turn up "end dam" flanges at ends of opening sill flashing pieces, lap with wall flashing and membranes to shed water.

5. Fabricate cleats of same material as sheet, minimum 3/4 inches wide, interlockable with sheet.

6. Hem exposed edges on underside 1/2 inch; miter and seam corners.

7. Solvent clean all sheet metal. Coat surfaces to be in contact with roofing or otherwise concealed with specified asphaltic paint; 0.015-inch minimum uniform thickness.

B. Form pieces in longest possible lengths.

C. Hem exposed edges on underside 1/2 inch; miter and seam corners.

D. Form material with flat lock seams, except where otherwise indicated. At moving joints, use sealed lapped, bayonet-type or interlocking hooked seams.

E. Fabricate corners from one piece with minimum 18 inch long legs; seam for rigidity, seal with sealant.

F. Fabricate vertical faces with bottom edge formed outward 1/4 inch (6 mm) and hemmed to form drip.

2.04 EDGE METAL SYSTEM AND METAL COPING SYSTEM

A. R-mer Drip Edge and R-mer Coping system by The Garland Company or approved equal.

1. ANSI SPRI ES-1 tested and certified.

2.05 ROOF-RELATED SHEET METAL AND FLASHINGS

A. Roof-Related Sheet Metal and Flashings: As indicated, as specified in related sections, as required by roofing material manufacturers and referenced standards. Coordinate work of this section with related sections. Provide complete systems without conflict or omission.

2.06 LADDERS, DRAINS AND HATCHES

A. Hatch: Bilco or approved equal.

1. Type S, all aluminum construction.

B. Roof Drains: OMG Retrofit

C. Ladder: Alaco Ladder

1. Fixed ladders of all aluminum costruction.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify roof openings, curbs, pipes, sleeves, ducts, and vents through roof are solidly set, reglets in place, and nailing strips located.

B. Verify roofing termination and base flashings are in place, sealed, and secure.

C. Beginning of installation means acceptance of existing conditions.

D. Field measure site conditions prior to fabricating work.

3.02 PREPARATION

A. Install starter and edge strips, and cleats before starting installation.

B. Back paint concealed metal surfaces with protective backing paint to a minimum dry film thickness of 15 mil.

3.03 INSTALLATION

A. Install work watertight, without waves, warps, buckles, fastening stress, or distortion, allowing for expansion and contraction. Conform to referenced standards. Make metal joints watertight.

B. Fastening of metal to walls and wood blocking shall comply with SMACNA Architectural Sheet Metal Manual, Factory Mutual 1-90 wind uplift specifications and/or manufacturer's recommendations whichever is of the highest standard.

C. All accessories or other items essential to the completeness of sheet metal installation and water tight envelope of the building, whether specifically indicated or not, shall be provided.

D. Reglets: Install in accordance with manufacturer’s installation instructions.

E. Metal fascia and copings shall be secured to wood nailers at the bottom edge with a continuous cleat. Cleats shall be at least one gauge heavier than the metal it secures.

F. Install Sheet Membrane Waterproofing at closure flanges, under metal copings, caps and platforms; fully adhered, free of voids, blisters and buckling; roll as soon as practical following layout. Minimize exposure time to that period recommended by the manufacturer.

G. Flashing: Joints at 10-foot maximum spacing and at 2-1/2-feet from corners. Butt joints with 3/16-inch space centered over matching 8-inch long backing plate with sealer tape in laps.

H. Flanged flashings and roof accessories: Set on continuous sealer tape. Nail flanges through sealer tape and at 3-inch maximum spacing.

I. Isolate metal from dissimilar metal with 2 coats of specified asphaltic paint, sealer tape or other approved coating, specifically made to stop electrolytic action.. Use only stainless steel fasteners to connect isolated dissimilar metals.

J. Joints, fastenings, reinforcements and supports: Sized and located as required to preclude distortion or displacement due to thermal expansion and contraction. Conceal fastenings wherever possible.

K. Secure flashings in place using concealed fasteners. Use exposed fasteners only where permitted.

L. Flexible Flashing Installation:

1. Prime substrates as recommended by flexible flashing manufacturer, allow to dry.

2. Install flexible flashings in maximum feasible lengths to minimize lap joints.

3. Peel release paper from roll to expose rubberized asphalt and position flashing to center over joint location before applying. Move along opening or joint, being careful to put flashing as evenly as possible over the opening. Avoid fishmouths.

4. Press flashing firmly into place with heavy hand pressure . Ensure continuous and intimate contact with substrate.

5. If wrinkles develop, carefully cut out affected area and replace as outlined above.

M. Apply plastic cement compound between metal flashings and felt flashings.

N. Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles.

O. Seal prefinished metal joints watertight.

P. Solder other metal joints for full metal surface contact. After soldering, wash metal clean with neutralizing solution and rinse with water.

Q. Connect downspouts and rain water leaders to storm sewer system. Seal connection watertight.

R. Install hatches and ladders per manufacturer’s recommendations.

X. Install roof drains per manufacturer’s recommendations.

3.04 FIELD QUALITY CONTROL

A. Inspection will involve surveillance of work during installation to ascertain compliance with specified requirements.

B. Tolerances

1. Exposed surfaces: Free of dents, scratches, abrasions, or other visible defects;

clean, ready for painting.

2. Set flashings and sheet metal to straight, true lines with exposed faces aligned in plane as indicated.

3.05 SHOP FABRICATED SHEET METAL

A. Installing Contractor shall be responsible for determining if the sheet metal systems are in general conformance with roof manufacturer's recommendations.

B. Metal work shall be shop fabricated to configurations and forms in accordance with recognized sheet metal practices.

C. Hem exposed edges.

D. Angle bottom edges of exposed vertical surfaces to form drip.

E. All corners for sheet metal shall be lapped with adjoining pieces fastened and set in sealant.

F. Joints for gravel stop fascia system, cap flashing, and surface-mount counterflashing shall be formed with a 1/4" opening between sections. The opening shall be covered by a cover plate or backed by an internal drainage plate formed to the profile of fascia piece.

The cover plate shall be embedded in mastic, fastened through the opening between the sections and loose locked to the drip edges.

G. Install sheet metal to comply with Architectural Sheet Metal manual, Sheet Metal and Air Conditioning Contractor's National Associations, Inc.

END OF SECTION