Exhibit E is a fee proposal template for commissioning authority services related to the Expansion of Tech Square, Phase IIIA project at Georgia Institute of Technology in Atlanta, Georgia. The document outlines the fee structure for two distinct project components: Core and Shell Project commissioning and PPV Fit-out Project commissioning. Each component includes fees across six project phases: Design Phase 1, Design Phase 2, Construction Phase, Acceptance Phase, Occupancy & Warranty Phase, and Measurement & Verification through certification. The proposal requires bidders to provide detailed cost breakdowns for each phase, including staffing information and reimbursable expenses.
The fee proposal requires bidders to submit loaded staff rates ($/hour), man-hours, and itemized reimbursable expenses for each project phase in both Phase 1 and Phase 2. Bidders must calculate total fees for each phase inclusive of all reimbursable expenses and provide cumulative commissioning fees for the Core and Shell Project, PPV Fit-out Project, and a combined total commissioning fee. This fee structure allows for transparent comparison of bidder proposals based on staffing costs, labor allocation, and project-specific expenses across the entire commissioning cycle from design through occupancy and warranty phases.
Text of this file
EXHIBIT E FEE PROPOSAL
A: Core and Shell
| Project Phase |
| Commissioning Fee |
Design Phase – Phase 1
Design Phase – Phase 2
Construction Phase
Acceptance Phase
Occupancy & Warranty Phase
Measurement & Verification through certification
Total Core and Shell Commissioning Fee
B: PPV Fit-out
| Project Phase |
| Commissioning Fee |
Design Phase – Phase 1
Design Phase – Phase 2
Construction Phase
Acceptance Phase
Occupancy & Warranty Phase
Measurement & Verification through certification
Total PPV fit-out Commissioning Fee
Total Commissioning Fee (A+B)
| Project Phase |
| Commissioning Fee |
Design Phase – Phase 1
Design Phase – Phase 2
Construction Phase
Acceptance Phase
Occupancy & Warranty Phase
Measurement & Verification through certification
Total Commissioning Fee
Provide the information below for each of the phases listed above.
Phase 1
| Staff |
| Loaded Rate ($/HR) |
| Man Hours |
| Amount |
Reimbursable Expenses (list each)
Total Fee (incl Reimbursable Expenses)
Phase 2
| Staff |
| Loaded Rate ($/HR) |
| Man Hours |
| Amount |
Reimbursable Expenses (list each)
Total Fee (incl Reimbursable Expenses)
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .