EXHIBIT D - Safety Data Sheet.docx

DOCX document 17 KB Posted

Attached to
FY20 MCON Funded Project P-1090 I MEF Consolidated Information Center, Marine Corps Base Camp Pendleton
Solicitation number
P-1090
Issued by

About this file

This document contains a safety data sheet exhibit for a federal construction contract solicitation. The solicitation seeks a construction contractor to build a consolidated information center at the Marine Corps Base Camp Pendleton in Oceanside, California. The project scope includes constructing a multi-story information center building, headquarters administration building, parking facilities, and support structures including a central plant and area distribution node for communications infrastructure. The contract value is estimated to be between $25-100 million. Offerors must provide safety data for the previous three years, including experience modification rates, OSHA DART and total recordable case rates with explanations for any high rates or negative trends. The safety narrative must describe the offeror's safety management system and subcontractor evaluation process, as well as any innovative safety practices, mishap prevention techniques, and employee reporting programs.

View the file

Other files

File Type Posted
Amendment 0001_P 1090.pdf PDF
P 1090 Questions and Answers.pdf PDF
EXHIBIT A - Construction Experience.docx DOCX document
P1090 Solicitation N6247320R0055.pdf PDF
EXHIBIT B - PPQ.docx DOCX document
EXHIBIT E - Small Business Participation Plan.docx DOCX document
EXHIBIT C - Past Performance Small Business Utilization.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT “D”

SAFETY DATA SHEET

N62473-20-R-0055

This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. EMR, DART and TRC rates shall not be submitted for subcontractors.

Joint Venture (JV) or Partnership: Complete Blocks 1 through 8 for each contractor who is part of the JV or partnership. Only one safety narrative (Block 9) is required.

1. Offeror Name:

Name of JV partner providing the information below (if applicable):

Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:

Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.

2. Experience Modification Rate (EMR):
2017
2018
2019

3a. For EMRs greater than 1.0, explain any extenuating circumstances and corrective actions taken:

3b. Explain any negative EMR trends:

3c. If you do not have an EMR for a given year, state so here and explain why:

4. Insurance Carrier Information:

Insurance Carrier Name:

Agent’s name:
Phone No.:
Email:
5. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
2017
2018
2019

Instructions for calculating the DART rate can be found at http://www.bls.gov/iif/osheval.htm.

6a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:

6b. Explain any negative DART Rate trends:

6c. If you do not have a DART Rate for a given year, state so here and explain why:

Note: Form may be expanded.

EXHIBIT “D” (continuation)

SAFETY NARRATIVE

N62473-20-R-0055

7. U.S. Dept. of Labor, OSHA Total Recordable Case (TRC) Rate
2017
2018
2019

Instructions for calculating the TRC rate can be found at http://www.bls.gov/iif/osheval.htm.

8a. For TRC Rates of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:

8b. Explain any negative TRC Rate trends:

8c. If you do not have a TRC Rate for a given year, state so here and explain why:

EXHIBIT “D” (continuation)

N62473-20-R-0055

9. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.

Describe the plan for safety that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:

Describe the safety management system that the Offeror will use to oversee the safety compliance and performance of self-performed and subcontractor performed work:

Note: Form may be expanded up to the page limit specified in the RFP.

EXHIBIT “D” (continuation)

N62473-20-R-0055

9. Technical Approach for Safety (continuation): Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.

Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels:

Describe the methodology that the Offeror will use in order to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps:

Describe the Offeror’s “Good Catch” Program: