Exhibit_D_-_Price_Sheet.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- CDBG-DR Palmetto House Roof - Construction
- Solicitation number
- 26-B-118KW
- Issued by
- Volusia County, Florida
About this file
This is a price sheet for a bid submission related to a Community Development Block Grant for Disaster Recovery (CDBG-DR) project administered by Volusia County's Office of Recovery and Resiliency (ORR) in Florida. The project involves roof replacement construction services for the Palmetto House, intended to aid in recovery from Hurricane Ian damage sustained in September 2022. The bid price sheet is organized into three roof sections—top, middle, and bottom—with line items for removal, installation, and replacement of roofing materials and components including laminated composite shingles, ice and water barriers, drip edge, sheathing, ridge vents, flashing, and hurricane ties. Quantities are specified for each line item across the three roof sections, with unit costs provided for bidders to complete their pricing calculations.
Bidders are required to enter unit costs in the green-shaded cells of the spreadsheet, with all total costs automatically calculated by the worksheet. The price sheet includes a line for performance and payment bonds in addition to the base bid total. All pricing must be submitted as part of the bid response for this CDBG-DR funded construction project, which is the primary funding source for this Hurricane Ian recovery initiative in Volusia County.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| EXHIBIT D - BID PRICE SHEET 26-B-118KW |
| CDBG-DR PALMETTO HOUSE ROOF CONSTRUCTION |
| Company Name | |||||
| Bidders shall complete all areas shaded in green. All other values will be automatically calculated. | |||||
| Item | Description | Units | Unit Cost | Quantity | Total |
| TOP ROOF | |||||
| 1 | Remove Laminated - comp. shingle rfg. - w/ felt | SQ | 37.93 | $0 | |
| 2 | Laminated - comp. shingle rfg. - w/out felt | SQ | 38.00 | $0 | |
| 3 | Ice & water barrier | SF | 3793.26 | $0 | |
| 4 | R&R Drip edge | LF | 254.83 | $0 | |
| 5 | Asphalt starter - universal starter course | LF | 254.83 | $0 | |
| 6 | R&R Sheathing - radiant barrier - 1/2" - OSB | SF | 3793.26 | $0 | |
| 7 | Sheathing - additional cost for H-clips | SF | 3793.26 | $0 | |
| 8 | Re-nailing of roof sheathing - complete re-nail | SF | 3793.26 | $0 | |
| 9 | Framing hurricane tie | EA | 191.12 | $0 | |
| 10 | R&R Hip / Ridge cap - Standard profile - composition shingles | LF | 80.00 | $0 | |
| 11 | R&R Continuous ridge vent - shingle-over style | LF | 80.00 | $0 | |
| 12 | R&R Flashing - pipe jack | EA | 4.00 | $0 | |
| 13 | R&R Roof vent - turbine type - Standard grade | EA | 1.00 | $0 | |
| 14 | R&R Exhaust cap - through roof - up to 4" | EA | 4.00 | $0 | |
| MIDDLE ROOF | |||||
| 15 | Remove Laminated - comp. shingle rfg. - w/ felt | SQ | 27.67 | $0 | |
| 16 | Laminated - comp. shingle rfg. - w/out felt | SQ | 28.00 | $0 | |
| 17 | Ice & water barrier | SF | 2767.32 | $0 | |
| 18 | R&R Drip edge | LF | 312.31 | $0 | |
| 19 | Asphalt starter - universal starter course | LF | 312.31 | $0 | |
| 20 | R&R Sheathing - radiant barrier - 1/2" - OSB | SF | 2767.32 | $0 | |
| 21 | Sheathing - additional cost for H-clips | SF | 2767.32 | $0 | |
| 22 | Re-nailing of roof sheathing - complete re-nail | SF | 2767.32 | $0 | |
| 23 | Framing hurricane tie | EA | 234.23 | $0 | |
| 24 | R&R Hip / Ridge cap - Standard profile - composition shingles | LF | 85.47 | $0 | |
| 25 | R&R Continuous ridge vent - shingle-over style | LF | 85.47 | $0 | |
| 26 | R&R Flashing, 14" wide | LF | 108.00 | $0 | |
| 27 | Step flashing | LF | 76.00 | $0 | |
| 28 | R&R Flashing - pipe jack | EA | 4.00 | $0 | |
| 29 | R&R Roof vent - turbine type - Standard grade | EA | 1.00 | $0 | |
| 30 | R&R Exhaust cap - through roof - up to 4" | EA | 4.00 | $0 | |
| BOTTOM ROOF | |||||
| 31 | R&R Modified bitumen roof | SQ | 6.30 | $0 | |
| 32 | Water barrier joint taping - Mod. bitumen - 4" seam tape | SF | 630.00 | $0 | |
| 33 | Ice & water barrier | SF | 630.00 | $0 | |
| 34 | R&R Drip edge | LF | 118.00 | $0 | |
| 35 | Asphalt starter - universal starter course | LF | 118.00 | $0 | |
| 36 | R&R Sheathing - radiant barrier - 1/2" - OSB | SF | 630.00 | $0 | |
| 37 | Sheathing - additional cost for H-clips | SF | 630.00 | $0 | |
| 38 | Re-nailing of roof sheathing - complete re-nail | SF | 630.00 | $0 | |
| 39 | Framing hurricane tie | EA | 88.50 | $0 |
| Total Base Bid: | $ - 0 |
| Performance and Payment Bonds: | |
| Total Bid (Base Bid + PP Bonds): | $ - 0 |