Exhibit_B_-_PRIME-SUB_Form.xls
XLS spreadsheet 49 KB Posted
- Attached to
- CDBG-DR Palmetto House Roof - Construction
- Solicitation number
- 26-B-118KW
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit B) for Volusia County, Florida, specifically for ITB No. 26-B-118KW related to Contract No. C-2091 for the CDBG-DR Palmetto House Roof Replacement project. The project involves construction services to replace the roof of the Palmetto House as part of Volusia County's recovery efforts from Hurricane Ian damage in September 2022. The form requires all bidders to identify and list every subcontractor proposed to perform work on the project, along with their respective disciplines and dollar values. Anticipated subcontractor disciplines for this project include Roofers, Heavy Equipment operators, and Electricians, though additional disciplines may be added as needed. The prime contractor is responsible for ensuring all subcontractors maintain appropriate licensing, and any changes to proposed subcontractors during project completion require prior approval from the County Project Manager.
Bidders must complete the form by designating dollar values and percentage of work allocation for both the prime contractor and all proposed subcontractors, with the total bid amount matching the Total Bid Price submitted on Exhibit D. The form is structured so that all dollar values and percentages for individual contractors automatically calculate to equal 100 percent of the total contract value. Failure to complete and return this form may result in a non-responsive bid. The County reserves the right to seek clarification on subcontractor information but will not allow changes to the total submitted base bid pricing. This project is funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR).
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2091 | ITB No. 26-B-118KW | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit D - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Roofers | $ - 0 | 0.00% | |
| Heavy Equipment | $ - 0 | 0.00% | |
| Electrician | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .