Exhibit D NCC Optimization Project List.pdf

PDF 527 KB Posted

Attached to
NCC WTP Operations and Maintenance
Solicitation number
RFP FAAA 2027000059 2
Issued by
Garfield County, Colorado

About this file

This file is an Exhibit D containing an NCC Optimization Project List that details capital upgrade recommendations and associated costs for improving collection system operations and reducing maintenance expenses. The document outlines a series of infrastructure improvements including pipe burst trenchless installation of the entire influent pipeline (6,500 feet at $250 per foot), replacement of flow meters, Gregory Gulch reconstruction to minimize sediment buildup, mix tank replacement and modifications, isolation valve installation, and procurement of new jetting equipment. The technical review team recommends these upgrades to address specific operational challenges such as collection system plugging, pH control fluctuations, and inadequate sediment management. The project scope encompasses engineering support, surveys, permitting, traffic planning, equipment procurement, and system modifications across multiple locations including MH-18, GI facilities, National Tunnel, and Gregory Gulch.

The total estimated project cost is $2,268,005.00, with individual line items ranging from $2,000 for isolation valve installation to $2,031,068 for the comprehensive pipe burst replacement and ancillary improvements. Cost estimates are budgetary in nature, based on internet cost searches and industry pricing data. The budget includes contingency allocations (ranging from 10 percent on larger projects to fixed amounts on smaller items), engineering support fees, labor costs, equipment procurement from specified vendors such as Brute Jetters and Outlook Enterprises, and a 5 percent markup on various components. The document does not specify funding sources, contract award dates, renewal options, or identification of incumbent contractors, suggesting this represents preliminary planning and budgetary guidance for future capital improvement implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recommendation Equipment necessary Estimated Cost Source Notes

For long-term operations, the technical review team recommends a review of the existing collection system infrastructure to identify potential capital upgrades for implementation to improve operations and reduce O&M costs. The upgrades would include improved access and modifications to prevent or reduce potential for plugging in the collection system.

For long-term operations, the technical review team recommends a review of the existing collection system infrastructure to identify potential capital upgrades for implementation to improve operations and reduce O&M costs. The upgrades would include improved access and modifications to prevent or reduce potential for plugging in the collection system.

The technical team recommends replacing the existing mix tank with a smaller and more appropriately sized unit is likely required for better pH control to allow operations at this lower pH setpoint.

As an alternative, the technical review team recommends reviewing the pH control loop and potentially making adjustments to reduce pH fluctuations.

Replacing the existing lime mix tank in the lime silo with a smaller and more appropriately sized unit is likely required for better pH control and to allow switching to a lime slurry feed system.

An isolation valve is recommended to be installed above the mix tank.

The technical review team recommends that the site team consider procuring new jetting equipment so smaller flushing activities can be performed by operations/maintenance personnel, thereby limiting contractor effort for off-site jetting of source lines and for

Jetting equipment for internal use

$ 29,768 Brute Jetters model Cart 3012 or similar

Pipe burst trenchless installation entire length of influent pipeline, new flume flow meters replacing flodar installations, rebuild Gregory Gulch to minimize sediment buildup and add head, etc.

$ 2,031,068

Engineering Support: $30,000 Survey - $12,000 Pipeburst - 6,500 feet at $250 / foot - $1,625,000 Permit / Traffic Plan - $7,500 Gregory Gulch Modifications: $15,000 MH-18 Packaged MH/Flume: $8,000 GI Packaged MH/Flume: $8,000 National Tunnel Modification - $10,000 National Tunnel Ultrasonic Flow Meter - $10,000 Flume level sensors / Flow Meters (x2): $8,000 Instrument integration - $25,000 Contingency - 10% - $175,850 Markup - 5%

Budgetary estimate for pipe bursting replacement of 12" CMP, based on review of internet costs for bursting

CMP

New flow meters, potential pipeline modifications, rebuild of Gregory Gulch, etc.

$ 180,180

Engineering Support: $20,000 Survey - $10,000 Manhole removal / excavation (x2) - $60,000 Gregory Gulch Modifications: $15,000 MH-18 Packaged MH/Flume: $8,000 GI Packaged MH/Flume: $8,000 National Tunnel Modification - $10,000 National Tunnel Ultrasonic Flow Meter - $10,000 Flume level sensors / Flow Meters (x2): $8,000 Instrument integration - $25,000 Contingency - 10% - $15,600 Markup - 5%

Budgetary estimate for manhole insertion / replacement from internet cost searches

New nozzle and kit for existing mix tank to reduce HRT

$ 5,565

Outlook Enterprises, Inc.

Tank Adapter: $1,500 Parts and Labor: $2,800 Contingency: $1,000 Markup 5%

Contract with browns hill to address pH feedback loop?

$ 9,450

Engineering: $3,000 Parts: $2,500 Browns Hill: $3,500 Markup 5%

Engineering and construction of mix tank inside of the lime silo

$ 9,975

Engineering: $3,500 Labor: $2,500 Tank (est. 300 gallons): $2,500 Contingency: $1,000 Markup 5%

Purchase and installation of a new isolation valve

$ 2,000 total

$ 2,268,005.00

$ 2,268,005.00

Estimated for 12 gpm / 3000 PSIG jetter with 8-inch pipe capabilities https://www.duracable.com/cat/847/Jetters/ $22,850 - Jetter, $1000 Shipping, $2,000 Inflation contingency, 5% markup $1000 - Pickup truck water tank, $1,000 - immersion t h t $500 hi i 5% k https://www.grainger.com/category/plumbing/plumbing-v alves/throttling-valves/butterfly-valves/manually-operated -butterfly-valves/general-service-manual-butterfly-valves ?sst=4&ts_optout=true&searchQuery=4+inch+pvc+valve &categoryIndex=1

Exhibit D