Attachment 2 Cost Rate Sheet.docx
DOCX document 3 MB Posted
- Attached to
- NCC WTP Operations and Maintenance
- Solicitation number
- RFP FAAA 2027000059 2
- Issued by
- Garfield County, Colorado
About this file
This is a Cost/Rate Sheet attachment for a Request for Proposals issued by the Colorado Department of Public Health and Environment (CDPHE) for operation and maintenance services at the North Clear Creek Water Treatment Plant (NCCWTP). The contract requires offerors to submit three detailed cost schedules: Schedule A for one-year labor costs including transition startup (Item A1), monthly operational labor (Item A2), and transition termination costs (Item A3); Schedule B for supplies and materials with estimated annual quantities including hydrated lime (500 tons), polymer (4,000 lbs), carbon dioxide (5,000 lbs), sludge disposal (6,000 cubic yards), and various monthly expenses for laboratory analysis, internet/phone, and maintenance; and Schedule C for firm hourly labor rates across 12 specified worker classifications plus additional classifications as needed. The contract structure combines fixed-price labor agreements with cost-reimbursable provisions for actual supplies and materials purchased.
The pricing terms establish that all labor and material rates submitted are firm offers, with contractors reimbursed only for actual quantities of materials purchased with supporting documentation. Contractors are responsible for providing employee training and personal protective equipment at no reimbursement, and must supply common mechanic tools. Schedule B includes a Non-Routine Expense allowance of $100,000 and an Emergency Expense allowance of $50,000, with contractors providing their proposed markup percentage. The quantities listed in all schedules are estimates only, and actual costs may vary based on water quality and quantity requiring treatment; CDPHE assumes no liability for anticipated fees or profits on items not provided if actual quantities differ from estimates. CDPHE reserves the right to negotiate final scope and costs with the selected offeror.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
Cost / Rate Sheets
These cost schedules shall be completed and returned as a part of the response to the Request for Proposals (RFP).
The quantities contained in the schedules are estimated quantities only. Contractor shall be reimbursed for actual quantities purchased. Documentation of purchases must be provided.
Labor and material rates are to be considered firm offers.
The contract will be a combination of a fixed price agreement for labor and cost reimbursable for supplies and materials.
Schedule A
Schedule A is to act as Offeror's full cost of labor required to perform the Statement of Work (SOW) for one year.
Costs will be considered in the evaluation of proposals. CDPHE reserves the right to negotiate the final scope and cost of services with the successful Offeror.
The Contractor is responsible for providing all necessary training and Personal Protective Equipment for their employees. The Contractor will not be reimbursed for these costs.
Item A1 is to include the cost for preparation of the required plans, and the cost for performance of all transitional/startup functions as described in the SOW. This should be an all inclusive lump sum for labor, materials, supplies, and other costs associated with services leading up to the Offeror’s taking over operation and maintenance of the North Clear Creek Water Treatment Plant (NCCWTP).
Item A2 is to represent the proposed total monthly labor cost for operational services associated with operation and maintenance of the facility. The Offeror shall include a proposed work schedule and shall indicate the number of employees and the estimated number of work hours in the response to this RFP. Administrative and support costs are to be included.
Item A3 is to include any costs that would be in addition to the normal operating costs during the time the Offeror is preparing to transition the operation and maintenance functions to another party, including preparing the transitional plan described in the Scope of Work, and training the incoming operation and maintenance contractor. Offeror should assume these services would be performed concurrently with operating the SMSS.
Schedule B
Schedule B is intended to include a firm offer of unit prices to supply chemicals, and estimated routine expenses to complete the SOW.
Prices used shall include the Contractor’s proposed markup rate.
The quantities indicated on this sheet are estimates. Payments will be made based on actual quantities. Actual quantities may differ from that indicated and will change depending on the quantity and quality of the water to be treated. CDPHE will not be liable for any anticipated fees or profits for items not provided or performed if actual quantities are less than the estimates indicated above.
The Contractor shall provide common mechanics tools for use by their employees (e.g. hammers, screwdrivers, wrenches, etc.). The Contractor will not be reimbursed for these costs.
Schedule C
Offeror is to indicate, as a firm offer, its labor rates including fringe benefits, overhead and profit for the worker classifications that may be used on the project. Classifications on Lines H1 through H12 shall not be modified.
The Offeror should indicate the rates for other classifications that may be required. The Offeror should include rates for all key personnel. The Offeror shall use lines H13 to H25 for additional anticipated classifications to be utilized, if necessary. The Offeror should indicate the classification of all facility personnel.
The rates indicated in Schedule C will be used as the basis for developing a cost estimate for non-routine work.
SCHEDULE A
Labor and Total Costs
| Item |
| Work |
| Price |
| Quantity |
| Total |
| A1 |
| Transition at start |
| $ |
| Lump sum |
| 1 |
| $ |
| A2 |
| Operating Labor |
| $ |
| Per month |
| 12 |
| $ |
| A3 |
| Transition at termination |
| $ |
| Lump sum |
| 1 |
| $ |
| Schedule A Total |
| $ |
| Schedule B Total |
| $ |
| TOTAL |
| $ |
SCHEDULE B
Supplies and Materials
| Item |
| Description |
| Unit |
| No. |
| Unit Price |
| Extension |
| B1 |
| Hydrated Lime |
| ton |
| 500 |
| $ |
| $ |
| B2 |
| Polymer |
| lb |
| 4000 |
| $ |
| $ |
| B3 |
| Carbon Dioxide |
| lb |
| 5000 |
| $ |
| $ |
| B4 |
| Sludge Disposal |
| cy |
| 6000 |
| $ |
| $ |
| B5 |
| Misc. Lab Supplies |
| mo est |
| 12 |
| $ |
| $ |
| B6 |
| Misc. Admin Supplies |
| mo est |
| 12 |
| $ |
| $ |
| B7 |
| Misc. Janitorial Supplies |
| mo est |
| 12 |
| $ |
| $ |
| B8 |
| Subcontracted Laboratory Analysis |
| mo est |
| 12 |
| $ |
| $ |
| B9 |
| Internet/Phone |
| mo est |
| 12 |
| $ |
| $ |
| B10 |
| Subcontractor Services |
| mo est |
| 12 |
| $ |
| $ |
| B11 |
| Maintenance Supplies |
| annual |
| 1 |
| $ |
| $ |
| B12 |
| Subcontracted Maintenance |
| annual |
| 1 |
| $ |
| $ |
| B13 |
| LTRA to O&M Transition |
| annual |
| 1 |
| $ |
| $ |
| B14 |
| Non-Routine Expense |
| allowance |
| $ 100,000 |
| $ 100,000 |
| B15 |
| Emergency Expense |
| allowance |
| $ 50,000 |
| $ 50,000 |
Above items include the Contractor’s markup of ________ %
SCHEDULE C
Labor Rates
| Item |
| Title |
| Hourly Rate |
| Over Time Rate |
| H1 |
| Project Manager |
| H2 |
| Principal Health and Safety Officer |
| H3 |
| Quality Assurance/Quality Control Officer |
| H4 |
| A Certified Industrial Wastewater Treatment Operator |
| H5 |
| B Certified Industrial Wastewater Treatment Operator |
| H6 |
| Assistant Operator |
| H7 |
| Laborer |
| H8 |
| Maintenance Worker |
| H9 |
| Electrician |
| H10 |
| Instrumentation and Controls Specialist |
| H11 |
| Laboratory Technician |
| H12 |
| Janitor |
| H13 |
| Administrative Support |
H14
H15
H16
H17
H18
H19
H20
H21
H22
H23
H24
H25
File details come from the government source that posted it. Updated .