Attachment 2 Cost Rate Sheet.docx

DOCX document 3 MB Posted

Attached to
NCC WTP Operations and Maintenance
Solicitation number
RFP FAAA 2027000059 2
Issued by
Garfield County, Colorado

About this file

This is a Cost/Rate Sheet attachment for a Request for Proposals issued by the Colorado Department of Public Health and Environment (CDPHE) for operation and maintenance services at the North Clear Creek Water Treatment Plant (NCCWTP). The contract requires offerors to submit three detailed cost schedules: Schedule A for one-year labor costs including transition startup (Item A1), monthly operational labor (Item A2), and transition termination costs (Item A3); Schedule B for supplies and materials with estimated annual quantities including hydrated lime (500 tons), polymer (4,000 lbs), carbon dioxide (5,000 lbs), sludge disposal (6,000 cubic yards), and various monthly expenses for laboratory analysis, internet/phone, and maintenance; and Schedule C for firm hourly labor rates across 12 specified worker classifications plus additional classifications as needed. The contract structure combines fixed-price labor agreements with cost-reimbursable provisions for actual supplies and materials purchased.

The pricing terms establish that all labor and material rates submitted are firm offers, with contractors reimbursed only for actual quantities of materials purchased with supporting documentation. Contractors are responsible for providing employee training and personal protective equipment at no reimbursement, and must supply common mechanic tools. Schedule B includes a Non-Routine Expense allowance of $100,000 and an Emergency Expense allowance of $50,000, with contractors providing their proposed markup percentage. The quantities listed in all schedules are estimates only, and actual costs may vary based on water quality and quantity requiring treatment; CDPHE assumes no liability for anticipated fees or profits on items not provided if actual quantities differ from estimates. CDPHE reserves the right to negotiate final scope and costs with the selected offeror.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

Cost / Rate Sheets

These cost schedules shall be completed and returned as a part of the response to the Request for Proposals (RFP).

The quantities contained in the schedules are estimated quantities only. Contractor shall be reimbursed for actual quantities purchased. Documentation of purchases must be provided.

Labor and material rates are to be considered firm offers.

The contract will be a combination of a fixed price agreement for labor and cost reimbursable for supplies and materials.

Schedule A

Schedule A is to act as Offeror's full cost of labor required to perform the Statement of Work (SOW) for one year.

Costs will be considered in the evaluation of proposals. CDPHE reserves the right to negotiate the final scope and cost of services with the successful Offeror.

The Contractor is responsible for providing all necessary training and Personal Protective Equipment for their employees. The Contractor will not be reimbursed for these costs.

Item A1 is to include the cost for preparation of the required plans, and the cost for performance of all transitional/startup functions as described in the SOW. This should be an all inclusive lump sum for labor, materials, supplies, and other costs associated with services leading up to the Offeror’s taking over operation and maintenance of the North Clear Creek Water Treatment Plant (NCCWTP).

Item A2 is to represent the proposed total monthly labor cost for operational services associated with operation and maintenance of the facility. The Offeror shall include a proposed work schedule and shall indicate the number of employees and the estimated number of work hours in the response to this RFP. Administrative and support costs are to be included.

Item A3 is to include any costs that would be in addition to the normal operating costs during the time the Offeror is preparing to transition the operation and maintenance functions to another party, including preparing the transitional plan described in the Scope of Work, and training the incoming operation and maintenance contractor. Offeror should assume these services would be performed concurrently with operating the SMSS.

Schedule B

Schedule B is intended to include a firm offer of unit prices to supply chemicals, and estimated routine expenses to complete the SOW.

Prices used shall include the Contractor’s proposed markup rate.

The quantities indicated on this sheet are estimates. Payments will be made based on actual quantities. Actual quantities may differ from that indicated and will change depending on the quantity and quality of the water to be treated. CDPHE will not be liable for any anticipated fees or profits for items not provided or performed if actual quantities are less than the estimates indicated above.

The Contractor shall provide common mechanics tools for use by their employees (e.g. hammers, screwdrivers, wrenches, etc.). The Contractor will not be reimbursed for these costs.

Schedule C

Offeror is to indicate, as a firm offer, its labor rates including fringe benefits, overhead and profit for the worker classifications that may be used on the project. Classifications on Lines H1 through H12 shall not be modified.

The Offeror should indicate the rates for other classifications that may be required. The Offeror should include rates for all key personnel. The Offeror shall use lines H13 to H25 for additional anticipated classifications to be utilized, if necessary. The Offeror should indicate the classification of all facility personnel.

The rates indicated in Schedule C will be used as the basis for developing a cost estimate for non-routine work.

SCHEDULE A

Labor and Total Costs

Item
Work
Price
Quantity
Total
A1
Transition at start
$
Lump sum
1
$
A2
Operating Labor
$
Per month
12
$
A3
Transition at termination
$
Lump sum
1
$
Schedule A Total
$
Schedule B Total
$
TOTAL
$

SCHEDULE B

Supplies and Materials

Item
Description
Unit
No.
Unit Price
Extension
B1
Hydrated Lime
ton
500
$
$
B2
Polymer
lb
4000
$
$
B3
Carbon Dioxide
lb
5000
$
$
B4
Sludge Disposal
cy
6000
$
$
B5
Misc. Lab Supplies
mo est
12
$
$
B6
Misc. Admin Supplies
mo est
12
$
$
B7
Misc. Janitorial Supplies
mo est
12
$
$
B8
Subcontracted Laboratory Analysis
mo est
12
$
$
B9
Internet/Phone
mo est
12
$
$
B10
Subcontractor Services
mo est
12
$
$
B11
Maintenance Supplies
annual
1
$
$
B12
Subcontracted Maintenance
annual
1
$
$
B13
LTRA to O&M Transition
annual
1
$
$
B14
Non-Routine Expense
allowance
$ 100,000
$ 100,000
B15
Emergency Expense
allowance
$ 50,000
$ 50,000

Above items include the Contractor’s markup of ________ %

SCHEDULE C

Labor Rates

Item
Title
Hourly Rate
Over Time Rate
H1
Project Manager
H2
Principal Health and Safety Officer
H3
Quality Assurance/Quality Control Officer
H4
A Certified Industrial Wastewater Treatment Operator
H5
B Certified Industrial Wastewater Treatment Operator
H6
Assistant Operator
H7
Laborer
H8
Maintenance Worker
H9
Electrician
H10
Instrumentation and Controls Specialist
H11
Laboratory Technician
H12
Janitor
H13
Administrative Support

H14

H15

H16

H17

H18

H19

H20

H21

H22

H23

H24

H25

File details come from the government source that posted it. Updated .