Exhibit_D-GENERAL_PUD_PERFORMANCE_STANDARDS.pdf

PDF 111 KB Posted

Attached to
Biosolids Hauling Service State and local contract opportunity
Solicitation number
25-8403
Issued by
Collier County, Florida

About this file

This document is a performance criteria specification from Collier County Public Utilities, outlining the 5N-Reliability Engineering Criteria for various utility infrastructure projects. The criteria apply to solicitations, agreements, and contracts related to Water Plants, Wastewater Plants, Master Pump Stations, Community Pump Stations, Solid Waste Sanitary Landfills, and Transfer Stations. The document establishes five key performance standards that must be maintained continuously (24/7/365): no offsite odors, no spills (onsite or offsite), no fugitive dust emissions, no offsite noise, and no offsite light emissions.

The performance standards require that any potential environmental impacts must be mitigated prior to the facility's fence line and comply with local codes. Any deviation from these engineering criteria requires formal review and approval, specifically requiring recommendation from both the Engineering and Operations Division Directors and final approval from the Department Head. The document serves as a comprehensive environmental and operational guideline to ensure consistent, high-standard performance across Collier County's public utility infrastructure projects.

View the file

Other files for this state and local contract opportunity

Other files attached to Biosolids Hauling Service, newest first.
File Type Posted
25-8403_Grant_Funded_-_Request_for_Proposals_(RFP)_Instructions_2025_Rev.2.pdf PDF
25-8403_Solicitation_rev_1.pdf PDF
25-8403_Solicitation.pdf PDF
25-8403_PO_Terms_and_Conditions_Rev.3.pdf PDF
General_Service_Agreement_[2025_ver.1].pdf PDF
25-8403_Insurance_Requirements.pdf PDF
25-8403_FPP_FEMA_FY25_5.1.25.pdf PDF
25-8403_PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8403_Insurance_Requirements.pdf PDF
General_Service_Agreement_[2025_ver.1].pdf PDF
25-8403_FPP_FEMA_FY25_5.1.25.pdf PDF
25-8403_Required_Forms_Grant_Funded_Revised_2025.docx DOCX document
Exhibit_A_-_Plant_Details.docx DOCX document
Exhibit_B-1-Analysis_Large_Facilities.pdf PDF
Exhibit_C-2-Plant_Production.docx DOCX document
Exhibit_C-3-Plant_Production.docx DOCX document
Exhibit_C-2-Plant_Production.docx DOCX document
Exhibit_C-3-Plant_Production.docx DOCX document
Exhibit_A_-_Plant_Details.docx DOCX document
Exhibit_B-2-Analysis_Small_Facilities.pdf PDF
25-8403_Required_Forms_Grant_Funded_Revised_2025.docx DOCX document
Exhibit_B-2-Analysis_Small_Facilities.pdf PDF
Exhibit_C-1-Plant_Production_(1dbba35b-74bd-431c-a67f-03dda6238984).docx DOCX document
Exhibit_C-1-Plant_Production_(1dbba35b-74bd-431c-a67f-03dda6238984).docx DOCX document
Exhibit_D-GENERAL_PUD_PERFORMANCE_STANDARDS.pdf PDF
Exhibit_B-1-Analysis_Large_Facilities.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following 5Ns are the PUD Performance Criteria that needs to be considered and included in

• solicitations,

• agreements,

• contracts, that are specifically related to our Water Plants, Wastewater Plants, Master Pump Stations, Community Pump Stations R&Rs, Solid Waste Sanitary Landfills, Transfer Stations, among others

PUBLIC UTILITIES

5N-RELIABILITY ENGINEERING CRITERIA

No offsite odors | 24/7/365

No SSOs-Spills offsite/onsite | 24/7/365

No offsite fugitive-dust emissions | 24/7/365

No offsite Noise | To be mitigated prior to fence line per Code | 24/7/365

No offsite Light emissions | To be mitigated prior to fence line per Code

Any deviation to above 5N-Reliability Engineering Criteria and guidance has to be reviewed and recommended by both Engineering and Operations Division Directors in advance for approval by the Department Head.

File details come from the government source that posted it. Updated .