This document is an exhibit from Collier County Public Utilities defining the 5N-Reliability Engineering Criteria for utility-related contracts and solicitations. The performance criteria apply to various infrastructure facilities including water plants, wastewater plants, master and community pump stations, solid waste sanitary landfills, and transfer stations. The document outlines five key performance standards that must be maintained 24/7/365: no offsite odors, no spills (onsite or offsite), no fugitive dust emissions, no offsite noise, and no offsite light emissions.

The document specifies that any deviation from these engineering criteria must be reviewed and recommended by both the Engineering and Operations Division Directors and approved by the Department Head. These standards are intended to be included in all solicitations, agreements, and contracts related to the specified utility infrastructure, ensuring consistent environmental and operational compliance across projects. The criteria appear to be part of a broader procurement framework for Collier County, specifically referenced in connection with a biosolids hauling service request for proposal that historically involves approximately $3,000,000 annually in services.

View the file

Other files for this state and local contract opportunity

Other files attached to Biosolids Hauling Service, newest first.
File Type Posted
25-8403_Grant_Funded_-_Request_for_Proposals_(RFP)_Instructions_2025_Rev.2.pdf PDF
25-8403_Solicitation_rev_1.pdf PDF
25-8403_Solicitation.pdf PDF
25-8403_PO_Terms_and_Conditions_Rev.3.pdf PDF
General_Service_Agreement_[2025_ver.1].pdf PDF
25-8403_Insurance_Requirements.pdf PDF
General_Service_Agreement_[2025_ver.1].pdf PDF
25-8403_FPP_FEMA_FY25_5.1.25.pdf PDF
25-8403_FPP_FEMA_FY25_5.1.25.pdf PDF
25-8403_PO_Terms_and_Conditions_Rev.3.pdf PDF
25-8403_Insurance_Requirements.pdf PDF
25-8403_Required_Forms_Grant_Funded_Revised_2025.docx DOCX document
Exhibit_A_-_Plant_Details.docx DOCX document
Exhibit_B-1-Analysis_Large_Facilities.pdf PDF
Exhibit_C-2-Plant_Production.docx DOCX document
Exhibit_C-3-Plant_Production.docx DOCX document
Exhibit_D-GENERAL_PUD_PERFORMANCE_STANDARDS.pdf PDF
Exhibit_C-1-Plant_Production_(1dbba35b-74bd-431c-a67f-03dda6238984).docx DOCX document
Exhibit_B-1-Analysis_Large_Facilities.pdf PDF
Exhibit_B-2-Analysis_Small_Facilities.pdf PDF
25-8403_Required_Forms_Grant_Funded_Revised_2025.docx DOCX document
Exhibit_B-2-Analysis_Small_Facilities.pdf PDF
Exhibit_C-1-Plant_Production_(1dbba35b-74bd-431c-a67f-03dda6238984).docx DOCX document
Exhibit_C-2-Plant_Production.docx DOCX document
Exhibit_C-3-Plant_Production.docx DOCX document
Exhibit_A_-_Plant_Details.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following 5Ns are the PUD Performance Criteria that needs to be considered and included in

• solicitations,

• agreements,

• contracts, that are specifically related to our Water Plants, Wastewater Plants, Master Pump Stations, Community Pump Stations R&Rs, Solid Waste Sanitary Landfills, Transfer Stations, among others

PUBLIC UTILITIES

5N-RELIABILITY ENGINEERING CRITERIA

No offsite odors | 24/7/365

No SSOs-Spills offsite/onsite | 24/7/365

No offsite fugitive-dust emissions | 24/7/365

No offsite Noise | To be mitigated prior to fence line per Code | 24/7/365

No offsite Light emissions | To be mitigated prior to fence line per Code

Any deviation to above 5N-Reliability Engineering Criteria and guidance has to be reviewed and recommended by both Engineering and Operations Division Directors in advance for approval by the Department Head.

File details come from the government source that posted it. Updated .