Exhibit D - Fee Proposal Form.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Materials Testing and Special Inspection Services
Solicitation number
RSD13 2026-004
Issued by
Middlesex County, Connecticut

About this file

This is a Fee Proposal Form (Exhibit D) for Materials Testing and Special Inspection Services solicited by Regional School District No. 13 Board of Education for the Memorial Elementary School construction project located at 124 Hubbard Street, Middlefield, Connecticut. The form requests pricing for comprehensive testing and inspection services across multiple construction categories, including soils and foundations testing, asphalt compaction testing, concrete placement inspection and cylinder compression testing, masonry inspection and testing, structural steel inspection and non-destructive testing, mechanical-electrical-plumbing (MEP) seismic system inspection, and cold-formed steel framing inspection. Services are priced on a unit basis with options for half-day (1-4 hours), full-day (4-8 hours), and overtime (greater than 8 hours) billing rates. Additional line items include special inspections by professional engineers and geotechnical engineers, interim monthly reports, final inspection reports, and cancellation charges for less than 24-hour notice. The solicitation opened May 19, 2026 at 10:00 AM EDT and closes June 2, 2026 at 9:45 AM EDT.

The fee proposal form provides no predetermined budget, contract value, or award amount, requiring vendors to propose their own pricing for each service category and unit. Billing terms specify that travel time to and from the job site is non-reimbursable and that contractors shall only bill for hours on-site; multiple same-day charges by the same technician are prohibited, with combined inspection rates required for multiple inspections performed on the same day. Cylinder pickup charges apply only when technicians are not already on-site. The solicitation includes no set-asides or incumbent vendor information. Vendors must submit qualifications and fee proposals on the district's designated form with delivery specified as Free On Board Destination. All inquiries should be directed to Kim Neubig at Regional School District No. 13, 135A Pickett Lane, Durham, Connecticut 06422, by telephone at (860) 349-7200 or email at kneubig@rsd13.org.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Testing Service by CategoryUnitUnit PriceProposer's Estimated
QuantityExtension
Soils, Foundations and Site
Subgrade & Fill Placement Inspection/Compaction TestingFull Day$ - 0$ - 0
1/2 Day$ - 0$ - 0
Asphalt Compaction Testing1/2 Day$ - 0$ - 0
Overtime (show hourly rate)Hour$ - 0
Washed Sieve Analysis with Gradation, Grain Size Distribution Curve Test, 3/4" Correction Test, Soils Description and IdentificationEach$ - 0$ - 0
Proctor DensityEach$ - 0$ - 0
Concrete
Rebar/Formwork/Concrete Placement Inspection, Cast CylindersFull Day$ - 0$ - 0
1/2 Day$ - 0$ - 0
Overtime (show hourly rate)Hour$ - 0
Concrete Cylinder Compression TestEach$ - 0$ - 0
Cylinder Pick Up Charge/Trip (includes mileage to and from site)Trip$ - 0$ - 0
Concrete Flatness TestFull Day$ - 0$ - 0
1/2 Day$ - 0$ - 0
Masonry
Mortar, Reinforcement, Installation, Weather Protection, Grouting Inspection, Cast Masonry Cubes/PrismsFull Day$ - 0$ - 0
1/2 Day$ - 0$ - 0
Overtime (show hourly rate)Hour$ - 0
Mortar/Grout Cubes Compression TestEach$ - 0$ - 0
Masonry PrismsEach$ - 0$ - 0
CMU TestsEach$ - 0$ - 0
Structural Steel
Non-Destructive Testing (NDT) including Ultrasonic, Dye Penetrant
and Magnetic Particle1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Structural Steel, Joist, Shear Stud and Deck Inspections (visual)1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
MEP Seismic System Inspection1/2 Day$ - 0$ - 0
Overtime (show hourly rate)Hour$ - 0
Shop Inspection1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Trip charge to Shop InspectionPer Mile$ - 0
Cold-Formed Steel Framing
Cold-Formed Steel Framing Inspection1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Combined Inspections
Inspections from any two (2) Categories above1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Inspections from any three (3) Categories above1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Inspections from any four (4) Categories above1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Inspections from any four (5) Categories above1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Special Inspections/Other
Special Inspection by P.E.1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Special Inspection by G.E.1/2 Day$ - 0$ - 0
Full Day$ - 0$ - 0
Interim Monthly ReportEach$ - 0$ - 0
Final Report of Special InspectionsEach$ - 0$ - 0
Cancellation Charge (if less than 24-hours)Each$ - 0
TOTAL$ - 0
Notes:
a.1/2 Day = 1-4 hours
b.Full Day = 4-8 hours
c.Overtime > 8 hours
d.Travel time to and from job site is not reimburseable.
e.Contractor shall only bill for hours on site and not "portal-to-portal."
f.Contractor shall not submit multiple 1/2 or full day charges for the same day for tests or inspections performed by the same technician. Combined inspection rates to be used for multiple same-day inspections.
g.Cylinder pickup charges apply only when the technician is not already on site on the day of the pickup.

&"Arial,Bold"&11EXHIBIT B&"Arial,Regular"

&"Arial,Bold"&UFEE PROPOSAL FORM&"Times New Roman,Regular"&10&U

File details come from the government source that posted it. Updated .