Exhibit D_24R6722_Fillable BOQ.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
D/B Construct Maritime Training Facilities, Kuching, Sarawak, Malaysia Federal contract opportunity
Solicitation number
N6274224R6722
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an Excel spreadsheet that appears to be an Independent Government Estimate (IGE) for a construction contract opportunity titled "D/B Construct Maritime Training Facilities" located in Kuching, Sarawak, Malaysia. The IGE details the estimated quantities, unit costs, and total costs for various construction, renovation, and equipment items across four separate contract line items (CLINs). The CLINs cover the renovation of barracks, a dining facility, a training facility, and a shore maintenance facility. The document also includes estimated costs for site preparation, utilities, field requirements, overhead, and profit.

The related federal contract opportunity has a solicitation number of N6274224R6722 and is being issued by the Department of the Navy Naval Facilities Engineering Command. The solicitation includes details on a pre-proposal site visit scheduled for August 1, 2024 and a deadline of August 6, 2024 for submitting pre-proposal inquiries.

View the file

Other files for this federal contract opportunity

Other files attached to D/B Construct Maritime Training Facilities, Kuching, Sarawak, Malaysia, newest first.
File Type Posted
Revised BOQ -_AMD0002_24R6722.xlsx XLSX spreadsheet
Released AMD0002_24R6722.pdf PDF
Released_amd1_N6274224R6722.pdf PDF
Exhibit A_24R6722_PPI_Fillable.docx DOCX document
RELEASED RFP_N6274224R6722.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

INDEPENDENT GOVERNMENT ESTIMATE DATE PREPARED

ACTIVITY AND LOCATION:CONSTRUCTION CONTRACT NO.ID NO.
Kuching, Sarawak, MalaysiaN6274224R6722
ESTIMATED BYCATEGORY CODE
PROJECT TITLE:NO
D/B Construct Maritime Training FacilitiesSTATUS OF DESIGNJOB ORDER NO.
CLIN 001 Renovation of BarracksQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
B20EXTERIOR CLOSURE
Repaint the wall ( include removal of existing paint and finishes)sq.m
B2020Windowsunits
B2030Exterior single doorsunits
C10INTERIOR CONSTRUCTION
Toilet doorsunits
Skirt tilel.m
C30INTERIOR FINISHES
C3010Repaint the wall ( include removal of existing paint and finishes)sq.m
Wall finishes toilet inclding the removal of existing toilet wallsq.m
C3020Floor Finishes (floor tile) including the removal of existing floor finishsq.m
C3030Ceilingsq.m
D20PLUMBING
D2010Water Closet with the accessoriesunits
Lavatory with the structures, accessories, and finishunits
D2020Clean water distribution linesls
D2030Waste water distribution linesls
D30HVAC
Air ConditioningBTU
D40FIRE PROTECTION
Fire extingusherpcs
E20FURNITURE
Single bed mattress and its accessoriesunits
Double bed mattress and its accessoriesunits
Single Wardrobeunits
Double Wardrobeunits
Office deskunits
Ergonomic chairunits
D50ELECTRICAL
D5010Electrical Service and Distributionls
Exhaust fanunits
D5020Lighting & Branch Wiringls
F10SPECIAL CONSTRUCTION
Name sign and project plaquels
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 001 Renovation of BarracksQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingsq.m
G1030Mobilizationls
De-mobilizationls
Design and drawingls
Construction of temporary facilitiesls
G30SITE CIVIL/ MECHANICAL UTILITIES
Water supply and electricity connectionunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 001
CLIN 002 Renovation of DFACQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
D20PLUMBING
Lavatory with the structures, accessories, and finishunits
D2020Clean water distribution linesls
D2030Waste water distribution linesls
D30HVAC
Air ConditioningBTU
D40FIRE PROTECTION
Fire extingusherpcs
D50ELECTRICAL
D5010Electrical Service and Distributionls
D5020Lighting & Branch Wiringls
E10EQUIPMENTS
Freestanding cooker with ovenunits
Chillerunits
Freezerunits
Projectorunits
Whiteboardunits
E20FURNISHINGS
Stainless steel shelvesunits
Pulldown screenunits
Dining chairunits
Dining tableunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 002 Renovation of DFACQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingsq.m
G1030Mobilizationls
De-mobilizationls
G30SITE CIVIL/ MECHANICAL UTILITIES
Water supply and electricity connectionunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 002
CLIN 003 Renovation of Training FacilityQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
D30HVAC
Air ConditioningBTU
D40FIRE PROTECTION
Fire extingusherpcs
D50ELECTRICAL
D5010Electrical Service and Distributionls
D5020Lighting & Branch Wiringls
E10EQUIPMENTS
Projectorunits
Whiteboardunits
E20FURNISHINGS
Instructor deskunits
Student deskunits
Ergonomic chairsunits
Pulldown screenunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 003 Renovation of Training FacilityQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingsq.m
G1030Mobilizationls
De-mobilizationls
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 003
CLIN 004 Renovation of Shore Maintenance FacilityQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
C30INTERIOR FINISHES
Repair cracked slabls
D40FIRE PROTECTION
Fire extingusherpcs
D50ELECTRICAL
D5010Electrical Service and Distributionls
D5020Lighting & Branch Wiringls
E10 E20EQUIPMENTS AND FURNISHINGS
Industrial Work Benchunits
Storage shelf rackunits
Tool cabinetunits
Work Tableunits
Storage lockerunits
Toolboardunits
Bench viseunits
Personal Protective Equipment (PPE) lockerunits
Ergonomic chairsunits
Office deskunits
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10Field Requirements
X20Office Overhead
X30Profit
Total
Table 2: SITEWORK
CLIN 004 Renovation of Shore Maintenance FacilityQUANTITYMATERIAL COSTLABOR COSTENGINEERING ESTIMATE
NUMBERUNITUNIT COSTTOTAL ($)UNIT COSTTOTAL ($)UNIT COSTTOTAL ($)
G10SITE PREPARATION
G1010Site Clearingsq.m
G1030Mobilizationls
De-mobilizationls
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X20Office Overhead
X30Profit
Total
Total CLIN 004

Total All CLINs and Option CLINs

_x000D_&1#&"Calibri"&14&K000000 SENSITIVE BUT UNCLASSIFIED

Sheet2