Exhibit C7 PBS Waste Audits Waco Buy.pdf

PDF 93 KB Posted

Attached to
Amendment 2 Full Maintenance Services, Waco Federal Couthouse, Waco, Texas
Solicitation number
47PH0219R0028
Issued by

View the file

Other files

File Type Posted
47PH0219R0028 0003 2020 04 21.pdf PDF
REVISED L-2 Manangment Plan Worksheet .pdf PDF
Solicitation Amendment 47PH0219R0028_0002.pdf PDF
Amendment 1 Figure B-3 Pricing Template Waco Full Maintenance Solicitation 47PH0219F0028.xlsx XLSX spreadsheet
Amendment 1 Updated Figure L-2 CBA and DOL MGMT Plan Baseline for Waco Buy.pdf PDF
Amendment 1 SF30 Solicitation Amendment 47PH0219R0028.pdf PDF
Amendment 1 CBA SDS-JV Custodial Austin.pdf PDF
Amendment 1 Figure B-3 Pricing Template Waco Full Maintenance.pdf PDF
Amendment 1 CBA SDS-JV Custodial San Antonio.pdf PDF
Amendment 1 CBA Operating Engineers San Antonio 1 2020.pdf PDF
Amendment 1 CBA SDS-JV Mechanical Austin.pdf PDF
Amendment 1 Waco Buy Request For Information Questions and Answers.pdf PDF
Amendment 1 Section J Table of Deliverables Waco Buy.pdf PDF
Amendment 1 2018 GSA PM Guide Pt 2.pdf PDF
Amendment 1 Figure L-3 Past Performance QuestionnaireWaco Buy .docx DOCX document
Amendment 1 2018 GSA PM Guide Pt 1.pdf PDF
Amendment 1 Waco Buy Contractor Site Visit Sign In Sheet March 19th 2020.pdf PDF
Amendment 1 SF30 Solicitation Amendment 47PH0219R0028 2020 03 25.pdf PDF
Amendment 1 2018 GSA PM Guide Pt 3.pdf PDF
Exhibit M3 - Environmental Sustainable Products Waco Buy.pdf PDF
Exhibit C5 Erosion and Sediment Control Waco Buy.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy Waco Buy.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians Waco Buy.pdf PDF
FIGURE L-1 Waco Management Plan Worksheet.xlsx XLSX spreadsheet
Exhibit M5 - Smart Buildings Waco Courthouse New Buy.pdf PDF
BL6 PM Schedule Waco Buy.pdf PDF
Figure B-2 SCA DOL _ CBA Combination Wage Adjustment Spreadsheet Waco Buy.xlsx XLSX spreadsheet
Attachment 2 SDS CBA Schedule A Wages WacoTXCustodial and Mechanical.pdf PDF
Exhibit M4 - Bldg Op Plan Template Waco Buy.pdf PDF
Exhibit C2 Custodial QASP Waco Buy.pdf PDF
BL4 Building Elevator Information EXAMPLE Waco Buy.pdf PDF
FIGURE B - 1, Staffing Declaration Waco Buy.xls XLS spreadsheet
Exhibit M1 - O&M QASP Waco Buy.pdf PDF
Exhibit M9 - Preventative Maintenance Guide Waco Buy.pdf PDF
47PH0219R0028 Generated PDF with TOC (4).pdf PDF
Attachment 3 Wage Determination DOL SCA for Waco Texas.pdf PDF
Exhibit C4 Building Exterior and Hardscape Plan Waco Buy.pdf PDF
BL1 Fire Extinguisher Inspection and Report Waco Courthouse New Buy.pdf PDF
BL2 Inventory List Waco 2.pdf PDF
Exhibit M2 - Green Purchasing Report Waco Buy.pdf PDF
Exhibit M6 - Water Treatment Waco Buy.pdf PDF
BL7 Work Orders FM Contract Waco Tx.xls XLS spreadsheet
Exhibit C3 Surveillance Forms Waco Buy.pdf PDF
Exhibit C6 Recycling Solid Waste and Trash Report Waco Buy.pdf PDF
Figure L-2 Management Plan Baseline Waco Buy.xlsx XLSX spreadsheet
Figure B-3 Pricing of Services Waco Buy.xlsx XLSX spreadsheet
Attachment 1 SDS Union CBA Agreement WacoTX Custodial and Mechanical.pdf PDF
Figure L-3 Past Performance QuestionnaireWaco Buy.docx DOCX document
BL2 Inventory List Waco 1.pdf PDF
BL3 Waco Location General Information Sheet Waco Buy.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT J.7

PBS WASTE AUDITS

This exhibit is provided to the Contractor as a guide for additional considerations for post-audit monitoring, plan implementation, training and other ancillary activities that may assist GSA in meeting the listed objectives.

I. background

GSA’s Public Buildings Service (PBS) provides work environments for over one million Federal employees nationwide. The inventory consists of courthouses, laboratories, offices and border stations. Tenant activities in these buildings generate tons of solid waste/trash that PBS is obligated to properly dispose of and achieve a minimum waste diversion of 50%. Recycling composting and other alternatives to landfills and incineration are the preferred methods for disposal of solid waste/trash.

II. Objectives

-Determine the most efficient methods to maximize reduction, recycling, and composting of solid waste/trash and to minimize waste shipments.

-Achieve a minimum of 50% waste diversion through waste minimization, recycling, and composting.

-Determine the right service level for solid waste/trash collection and removal

III. Extent Of Work

The Contractor shall conduct a solid waste/trash audit to include:

-100% of the waste and/or recycling collected in a 24 hour period must be audited (excluding durable goods or construction waste).

-The audit must represent a 24 hour period on a typical work day.

-Use scales to weigh sorted waste, as weight is the preferred metric.

-Determine the amount of recyclable materials being thrown away that could have been recycled and composted. At a minimum, the recyclable items within the waste/trash must be identified and separated into the following categories: Paper, Plastic, Cardboard, Glass, Metal/aluminum, and Wet Waste.

The Contractor shall develop a written report and analysis of the conclusions drawn from this audit, including recommendations for improving the economy and efficiency of waste collection, storage, transfer, and disposal (including recycling and composting). This report shall address, at a minimum:

-Recommendations to maximize waste minimization, recycling, and composting to achieve at least 50% waste diversion.

-Recommendations to right-size service level for solid waste/trash removal services to minimize trash shipments.

The report and analysis is due to the COR 60 days after the start date.

File details come from the government source that posted it. Updated .