Exhibit C6 Recycling Solid Waste and Trash Report Waco Buy.pdf
PDF 205 KB Posted
- Solicitation number
- 47PH0219R0028
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT J.6
RECYCLING/Solid Waste/TRASH Report
Conversion Source(s):
Conversion Source: EPA's Standard Volume-to-Weight Conversion Factors (http://www.epa.gov/epawaste/conserve/tools/recmeas/docs/guide_b.pdf
HOW TO FILL OUT THE FORM:
1. Report all recyclables. For source separated recycling, provide weight for each type of material recycled. For commingled recycling, provide total weight for the mixed recyclable materials. Specify when items are composted.
http://www.epa.gov/epawaste/conserve/tools/recmeas/docs/guide_b.pdf
2. All fields must be filled out.
3. Provide actual weight whenever possible. ** When actual weight is not available use standard Volume-to-Weight Conversion Factors for calculation. Allowances shall be made and reported for volumes that are not filled to capacity (i.e., half full, 3/4 full, etc.)
4. Pick Up Frequency: Based on monthly activity (e.g. once a week= 4, twice a week = 8, etc.)
5. Indicate conversion factor source(s).
Conversion Source: EPA's Standard Volume-to-Weight Conversion Factors
(http://www.epa.gov/epawaste/conserve/tools/recmeas/docs/guide_b.pdf
HOW TO FILL OUT THE FORM:
1. Report all recyclables. For source separated recycling, provide weight for each type of material recycled. For commingled recycling, provide total weight for the mixed recyclable materials. Specify when items are composted.
2. All fields must be filled out.
http://www.epa.gov/epawaste/conserve/tools/recmeas/docs/guide_b.pdf
3. Provide actual weight whenever possible. ** When actual weight is not available use standard
Volume-to-Weight Conversion Factors for calculation. Allowances shall be made and reported for volumes that are not filled to capacity (i.e., half full, 3/4 full, etc.)
4. Pick Up Frequency: Based on monthly activity (e.g. once a week= 4, twice a week = 8, etc.)
5. Indicate conversion factor source(s).
File details come from the government source that posted it. Updated .