This is a Design-Builder (DB) Fee Proposal document for Project No. J-475, Campus Infrastructure Phase III at Clayton State University in Morrow, Georgia. The proposal establishes the compensation structure for the design-builder's services across three primary fee categories: Design Consultants Fee for basic design and construction administration services, Preconstruction Fee representing gross profit for preconstruction consulting services, and Construction Fee representing gross profit for construction services. Each fee component is established as a fixed fee amount to be agreed upon by both the owner and the design-builder, with all fees representing full compensation for services and expenses not otherwise identified as Costs of the Work.

The proposal document requires the design-builder to specify maximum overhead costs and expenses for both preconstruction and construction phases, with these amounts detailed in separate attachments and explicitly excluding the respective preconstruction and construction fees. The design-builder firm must complete the document by providing the firm name, signature of a company officer, and the officer's title. All fee amounts and overhead cost maximums remain blank in this template, indicating that the specific dollar values are to be submitted by competing design-builders as part of their proposals for this design-build project at Clayton State University.

View the file

Other files

File Type Posted
_CLSU J_475 DB RFQ_RFP.pdf PDF
Exhibit F _ Project Cost Matrix.xlsx XLSX spreadsheet
Exhibit A _ Certification Form.docx DOCX document
Exhibit E _ General Conditions Breakdown.xlsx XLSX spreadsheet
Exhibit D _ Precon Cost and Expenses.xlsx XLSX spreadsheet
Exhibit G _ Proposer_s Disclosure Statement.doc DOC document
Exhibit B _ Contractor Affidavit.docx DOCX document
Egnyte Upload Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 of Exhibit C Project No. J-475, Campus Infrastructure Phase III Clayton State University

DESIGN BUILDER (DB) FEE PROPOSAL

1. DB’S FEE:

Basis of Fee. The DB’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.

A. DESIGN CONSULTANTS FEE:

Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:

TOTAL

Design Fee (fixed fee)

B. PRECONSTRUCTION FEE:

Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to DB a Preconstruction Fee:

TOTAL

Pre-Construction Fee (fixed fee)

C. CONSTRUCTION FEE:

Construction Fee. Representing the gross profit for the construction services provided by DB as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to DB a Construction Fee.

TOTAL

Construction Fee (fixed fee)

2. DB’S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:

The DB’s Overhead Costs. The maximum amount for the DB’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .

AMOUNT

A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)

B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)

Total Maximum Overhead Cost (Sum of A & B)

DB Firm Name

By:__________________________________________________________ Signature of DB Officer

Title of DB Officer