Summary: Exhibit C - Bid Sheet for FDOT District 3 Demolition and Removal Services
This bid sheet is part of the Invitation to Bid (ITB-26-3014-CS) issued by the Florida Department of Transportation District 3 for demolition and removal services across 16 counties in the district. The solicitation seeks unit pricing for comprehensive demolition and removal services including residential structures (frame, concrete block, and masonry in one-story and multi-story configurations), commercial and industrial structures (metal, frame, concrete block, and masonry), mobile homes, signs and utility poles, miscellaneous items such as slabs, decks, outbuildings, septic systems, wells, fencing, pools, and debris removal. The bid sheet also includes pricing for ancillary services such as clearing and grubbing, erosion control, fence installation, equipment rental, and securing of buildings. Technical questions are due February 23, 2026, sealed bids are due March 4, 2026, at 10:30 a.m. Central Time via email, with public bid opening on March 4, 2026, at 2:00 p.m. at 1074 Highway 90, Chipley, Florida. The intended award date is March 6, 2026. The contract is structured as an indefinite quantity agreement commencing March 27, 2026, for an initial 36-month term with possible renewal for up to three additional years.
Bidders must submit unit pricing for all line items on the bid sheet with no blank or "N/A" entries, or their bids will be deemed non-responsive. The Department intends to award two contracts—one based on low bid and one as a supplement—with awards determined using a sample project calculation methodology. Bidders must demonstrate a minimum of two years of active engagement in demolition services, be registered in MyFloridaMarketplace, provide a performance bond of $30,000, and maintain general liability insurance with combined bodily injury limits of $200,000 per person and $300,000 per occurrence. Compensation is based on the unit prices submitted on the bid sheet and must comply with prevailing wage rates under the Davis-Bacon Act for federally funded projects and applicable federal and state environmental regulations. Liquidated damages of $100 per day apply for failure to meet completion dates. All vendor payments are subject to the MFMP Transaction Fee. No specific budget or award value ranges are disclosed in the solicitation documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit C - Bid Sheet.xlsx | XLSX spreadsheet | |
| Bid Tab.pdf | ||
| Addendum 1.pdf | ||
| Bid Documents ITB-26-3014-CS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SHEET - Exhibit "C" | |||
| DISTRICT-WIDE DEMOLITION AND REMOVAL | |||
| 1.0 RESIDENTIAL STRUCTURES | |||
| ITEM # | STRUCTURE TYPE / SIZE | UNIT | COST/UNIT |
| 1.1 | FRAME ONE-STORY | ||
| 1.1.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.1.2 | 5,001 Square Feet and greater | SF | $ |
| 1.2 | FRAME MULTI-STORY | ||
| 1.2.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.2.2 | 5,001 Square Feet and greater | SF | $ |
| 1.3 | CONCRETE BLOCK ONE-STORY | ||
| 1.3.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.3.2 | 5,001 Square Feet and greater | SF | $ |
| 1.4 | CONCRETE BLOCK MULTI-STORY | ||
| 1.4.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.4.2 | 5,001 Square Feet and greater | SF | $ |
| 1.5 | MASONRY ONE-STORY | ||
| 1.5.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.5.2 | 5,001 Square Feet and greater | SF | $ |
| 1.6 | MASONRY MULTI-STORY | ||
| 1.6.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.6.2 | 5,001 Square Feet and greater | SF | $ |
| 1.7 | MOBILE HOMES-DEMOLITION | ||
| 1.7.1 | Single-wide | SF | $ |
| 1.7.2 | Double-wide | SF | $ |
| 1.7.3 | Triple-wide | SF | $ |
| 2.0 COMMERCIAL/INDUSTRIAL STRUCTURES | |||
| ITEM # | STRUCTURE TYPE / SIZE | UNIT | COST/UNIT |
| 2.1. | METAL ONE-STORY | ||
| 2.1.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.1.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.1.3 | 20,001 Square Feet and greater | SF | $ |
| 2.2 | METAL MULTI-STORY | ||
| 2.2.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.2.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.2.3 | 20,001 Square Feet and greater | SF | $ |
| 2.3 | FRAME ONE-STORY (wood/hardy plank/stucco) | ||
| 2.3.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.3.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.3.3 | 20,001 Square Feet and greater | SF | $ |
| 2.4 | FRAME MULTI-STORY (wood/hardy plank/stucco) | ||
| 2.4.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.4.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.4.3 | 20,001 Square Feet and greater | SF | $ |
| 2.5 | CONCRETE BLOCK ONE-STORY | ||
| 2.5.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.5.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.5.3 | 20,001 Square Feet and greater | SF | $ |
| 2.6 | CONCRETE BLOCK MULTI-STORY | ||
| 2.6.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.6.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.6.3 | 20,001 Square Feet and greater | SF | $ |
| 2.7 | MASONRY ONE-STORY (brick) | ||
| 2.7.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.7.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.7.3 | 20,001 Square Feet and greater | SF | $ |
| 2.8 | MASONRY MULTI-STORY (brick) | ||
| 2.8.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.8.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.8.3 | 20,001 Square Feet and greater | SF | $ |
| 3.0 SIGNS, LIGHT AND UTILITY POLES | |||
| ITEM # | DESCRIPTION | UNIT | COST/UNIT |
| 3.1 | WOOD SIGNS/POLES (INCLUDING BASE) | ||
| 3.1.1 | 0 – 600 Square Feet | SF | $ |
| 3.1.2 | Greater than 600 Square Feet | SF | $ |
| 3.2 | METAL SIGNS/POLES (INCLUDING BASE) | ||
| 3.2.1 | 0 – 600 Square Feet | SF | $ |
| 3.2.2 | Greater than 600 Square Feet | SF | $ |
| 3.3 | MONUMENTAL MASONRY SIGNS (INCLUDING BASE) | ||
| 3.3.1 | Any Size per Square Foot | SF | $ |
| 3.4 | BRICK SIGNS (INCLUDING BASE) | ||
| 3.4.1 | Any Size per Square Foot | SF | $ |
| 3.5 | MONOPOLE SIGNS (INCLUDING BASE) | ||
| 3.5.1 | Any Size per Square Foot | SF | $ |
| 3.6 | UTILITY POLES (INCLUDING BASE) | ||
| 3.6.1 | Concrete Poles | LF | $ |
| 3.6.2 | Metal Poles | LF | $ |
| 3.6.3 | Wood Poles | LF | $ |
| 3.7 | Sign Base | ||
| 3.7.1 | Removal of Sign Base Only | SF | $ |
| 3.8 | Bollard | ||
| 3.8.1 | Bollard (concrete/metal/wood) | EA | $ |
| 4.0 MISCELLANEOUS | |||
| ITEM # | DESCRIPTION | UNIT | COST/UNIT |
| 4.1 | SLABS / FOOTER REMOVAL | ||
| 4.1.1 | Less than or equal to 6” in depth/SF | SF | $ |
| 4.1.2 | Greater than 6” in depth/SF | SF | $ |
| 4.1.3 | Asphalt/SF | SF | $ |
| 4.1.4 | Saw cut only per linear foot | LF | $ |
| 4.2 | WOOD DECKS/RAMPS | ||
| 4.2.1 | Any size per square foot | SF | $ |
| 4.2.2 | Removal of boat dock to include piers/pilings | SF | $ |
| 4.3 | OUTBUILDINGS | ||
| 4.3.1 | Any size per square foot | SF | $ |
| 4.4 | ELECTRICAL | ||
| 4.4.1 | Electrical disconnect fee | EA | $ |
| 4.4.2 | Remove exterior lighting per fixture | EA | $ |
| 4.5 | CANOPIES | ||
| 4.5.1 | Canopy Removal | SF | $ |
| 4.6 | SWIMMING POOLS | ||
| 4.6.1 | Above ground pool | SF | $ |
| 4.6.2 | In ground Vinyl lined pool | SF | $ |
| 4.6.3 | In ground Concrete pool | SF | $ |
| 4.6.4 | Pump-out (without removing pool) | each | $ |
| 4.7 | SEPTIC SYSTEMS/BACKFLOW/LIFT STATIONS | ||
| 4.7.1 | Septic System Removal - 0-2,000 gal. | EA | $ |
| 4.7.2 | Septic System Removal - 2,001 gal. and greater | EA | $ |
| 4.7.3 | Lift Station Removal | EA | $ |
| 4.7.4 | Backflow Preventer - Pipe Diameter of 1.5 inches or less | EA | $ |
| 4.7.5 | Backflow Preventer - Pipe Diameter of greater than 1.5 inches | EA | $ |
| 4.8 | FENCE REMOVAL | ||
| 4.8.1 | Wire | LF | $ |
| 4.8.2 | Chain-link | LF | $ |
| 4.8.3 | Wood | LF | $ |
| 4.8.4 | Masonry | LF | $ |
| 4.8.5 | Vinyl | LF | $ |
| 4.8.6 | Metal Sheet | LF | $ |
| 4.9 | WALL REMOVAL | ||
| 4.9.1 | Brick | LF | $ |
| 4.9.2 | Concrete | LF | $ |
| 4.9.3 | Stone | LF | $ |
| 4.10 | WELLS / WATER SUPPLY | ||
| 4.10.1 | Capping – Less than or equal to 6” diameter | EA | $ |
| 4.10.2 | Capping – Greater than 6” in diameter | EA | $ |
| 4.10.3 | Abandonment – Less than or equal to 6” in diameter | LF | $ |
| 4.10.4 | Abandonment – Greater than 6” in diameter | LF | $ |
| 4.11 | IRRIGATION SYSTEMS | ||
| 4.11.1 | Above ground systems | LF | $ |
| 4.11.2 | In-ground systems | LF | $ |
| 4.11.3 | Cut and cap water line (irrigation, well line, etc.) | LF | $ |
| 4.12 | HYDRAULIC LIFTS/GREASE TRAPS | ||
| 4.12.1 | Hydraulic Lift Removal | EA | $ |
| 4.12.2 | Grease Trap Removal | EA | $ |
| 4.12.3 | Hydraulic Lift - remove and dispose of hydraulic fluid | GAL | $ |
| 4.12.4 | Grease Trap – removal and disposal of grease | GAL | $ |
| 4.13 | DEBRIS | ||
| 4.13.1 | Debris Removal | TON | $ |
| 4.14 | FILL | ||
| 4.14.1 | Fill Material | YD | $ |
| 4.15 | HOURLY RATES | ||
| 4.15.1 | Laborer | HR | $ |
| 4.15.2 | Electrician | HR | $ |
| 4.15.3 | Plumber | HR | $ |
| 4.16 | TIRE REMOVAL | ||
| 4.16.1 | Tire Removal | EA | $ |
| 4.17 | WET DEMOLITION | ||
| 4.17.1 | Wet Demo | SF | $ |
| 4.18 | BUILDING CUT OFF | ||
| 4.18.1 | Building Cut-Off and Removal | SF | $ |
| 4.19 | FENCE INSTALLATION | ||
| 4.19.1 | 4’ Field Fence | LF | $ |
| 4.19.2 | 6' Field Fence | LF | $ |
| 4.19.3 | 4' Chain Link Fence | LF | $ |
| 4.19.4 | 6' Chain Link Fence | LF | $ |
| 4.20 | EROSION CONTROL | ||
| 4.20.1 | Hay | EA | $ |
| 4.20.2 | Silt Fence | LF | $ |
| 4.20.3 | Grass Seed | SF | $ |
| 4.20.4 | Sod | SF | $ |
| 4.21 | CLEARING AND GRUBBING | ||
| 4.21.1 | Clearing and Grubbing | SF | $ |
| 4.22 | LAWN AND LANDSCAPING | ||
| 4.22.2 | Tractor Operated Equipment | HR | $ |
| 4.23 | SECURING OF BUILDINGS | ||
| 4.23.1 | 1/2 inch Plywood, 4x8 sheet | EA | $ |
| 4.23.2 | 5/8 inch Plywood, 4x8 sheet | EA | $ |
| 4.23.3 | 3/4 inch Plywood, 4x8 sheet | EA | $ |
| 4.23.4 | Nails | POUND | $ |
| 4.23.5 | Screws | POUND | $ |
| 4.24 | VEHICLE REMOVAL | ||
| 4.24.1 | Vehicle Removal | EA | $ |
| 4.25 | EQUIPMENT RENTAL | ||
| 4.25.1 | Crane | DAILY | $ |
| 4.25.2 | Manlift | DAILY | $ |
| 4.25.3 | Brush Cutter | DAILY | $ |
| 4.26 | PERMITS | ||
| 4.26.1 | Permits compensated at actual value | EA | TBD |
| It's the Departments Intent to award 2 contract for this solicitation. |
| The initial contract will be awarded based on low bid and the |
| second as a supplement. |
A Sample project will be used to determine the total bid.
&14EXHIBIT C
&P of &N
Microsoft_Word_Document.docx MFMP Transaction Fee:
All payment(s) to the vendor resulting from this competitive solicitation WILL be subject to the MFMP Transaction Fee in accordance with the referenced Form PUR 1000 General Contract Condition #7d. The Transaction Fees imposed shall be based upon the date of issuance of the payment.
NOTE: In submitting a response, the bidder acknowledges they have read and agree to the solicitation terms and conditions and their submission is made in conformance with those terms and conditions.
ACKNOWLEDGEMENT: I certify that I have read and agree to abide by all terms and conditions of this solicitation and that I am authorized to sign for the bidder. I certify that the response submitted is made in conformance with all requirements of the solicitation.
Bidder: FEID# .
Address:_______________________________City,State,Zip: .
Phone: E-mail:
Authorized Signature: ______________________________________ Date: ______________