This is a Bid Sheet (Exhibit C) for a District-Wide Demolition and Removal Services solicitation issued by the Florida Department of Transportation (FDOT) for District 3, covering 16 counties in North Florida: Bay, Calhoun, Escambia, Franklin, Gadsden, Gulf, Holmes, Jackson, Jefferson, Leon, Liberty, Okaloosa, Santa Rosa, Wakulla, Walton, and Washington. The solicitation requests demolition and removal services for structures, improvements, and debris from FDOT lands and state-controlled areas adjacent to state and federal highway rights-of-way. The bid sheet establishes unit pricing across multiple service categories: residential structures (1.0) including frame, concrete block, and masonry construction in various sizes; commercial and industrial structures (2.0) with similar material classifications; signs, poles, and utility infrastructure (3.0); and miscellaneous services (4.0) encompassing slabs, decks, pools, septic systems, fence removal, wall removal, wells, irrigation systems, hydraulic lifts, debris removal, fill material, hourly labor rates, tire removal, wet demolition, building cutoff, fence installation, erosion control, clearing and grubbing, landscaping, building securing, vehicle removal, equipment rental, and permits. Bids are due March 4, 2026, at 10:30 a.m. central time via email to D3.Purch@dot.state.fl.us. FDOT intends to award two contracts: one based on low bid and one as a supplement contract, with awards determined using a sample project to calculate total bid amounts.
Bidders must submit unit costs for each line item in the bid sheet and acknowledge conformance with all solicitation terms and conditions through authorized signature. All payments resulting from this competitive solicitation are subject to the MFMP Transaction Fee per Form PUR 1000 General Contract Condition #7d, calculated based on the payment issuance date. Permits are compensated at actual value. The solicitation does not specify contract term duration, renewal options, or identify any incumbent contractors. Funding sources and specific appropriation amounts are not detailed in the bid sheet; however, the use of various FIN numbers indicates multiple funding sources across the district. No set-asides, small business preferences, or specific environmental requirements are identified in this exhibit. Bidders are required to provide their Federal Employer Identification Number (FEID), business address, contact information, and authorized representative signature and title.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Tab.pdf | ||
| Addendum 1.pdf | ||
| Bid Documents ITB-26-3014-CS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SHEET - Exhibit "C" | |||
| DISTRICT-WIDE DEMOLITION AND REMOVAL | |||
| 1.0 RESIDENTIAL STRUCTURES | |||
| ITEM # | STRUCTURE TYPE / SIZE | UNIT | COST/UNIT |
| 1.1 | FRAME ONE-STORY | ||
| 1.1.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.1.2 | 5,001 Square Feet and greater | SF | $ |
| 1.2 | FRAME MULTI-STORY | ||
| 1.2.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.2.2 | 5,001 Square Feet and greater | SF | $ |
| 1.3 | CONCRETE BLOCK ONE-STORY | ||
| 1.3.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.3.2 | 5,001 Square Feet and greater | SF | $ |
| 1.4 | CONCRETE BLOCK MULTI-STORY | ||
| 1.4.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.4.2 | 5,001 Square Feet and greater | SF | $ |
| 1.5 | MASONRY ONE-STORY | ||
| 1.5.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.5.2 | 5,001 Square Feet and greater | SF | $ |
| 1.6 | MASONRY MULTI-STORY | ||
| 1.6.1 | 0 – 5,000 Square Feet | SF | $ |
| 1.6.2 | 5,001 Square Feet and greater | SF | $ |
| 1.7 | MOBILE HOMES-DEMOLITION | ||
| 1.7.1 | Single-wide | SF | $ |
| 1.7.2 | Double-wide | SF | $ |
| 1.7.3 | Triple-wide | SF | $ |
| 2.0 COMMERCIAL/INDUSTRIAL STRUCTURES | |||
| ITEM # | STRUCTURE TYPE / SIZE | UNIT | COST/UNIT |
| 2.1. | METAL ONE-STORY | ||
| 2.1.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.1.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.1.3 | 20,001 Square Feet and greater | SF | $ |
| 2.2 | METAL MULTI-STORY | ||
| 2.2.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.2.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.2.3 | 20,001 Square Feet and greater | SF | $ |
| 2.3 | FRAME ONE-STORY (wood/hardy plank/stucco) | ||
| 2.3.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.3.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.3.3 | 20,001 Square Feet and greater | SF | $ |
| 2.4 | FRAME MULTI-STORY (wood/hardy plank/stucco) | ||
| 2.4.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.4.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.4.3 | 20,001 Square Feet and greater | SF | $ |
| 2.5 | CONCRETE BLOCK ONE-STORY | ||
| 2.5.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.5.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.5.3 | 20,001 Square Feet and greater | SF | $ |
| 2.6 | CONCRETE BLOCK MULTI-STORY | ||
| 2.6.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.6.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.6.3 | 20,001 Square Feet and greater | SF | $ |
| 2.7 | MASONRY ONE-STORY (brick) | ||
| 2.7.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.7.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.7.3 | 20,001 Square Feet and greater | SF | $ |
| 2.8 | MASONRY MULTI-STORY (brick) | ||
| 2.8.1 | 0 – 5,000 Square Feet | SF | $ |
| 2.8.2 | 5,001 – 20,000 Square Feet | SF | $ |
| 2.8.3 | 20,001 Square Feet and greater | SF | $ |
| 3.0 SIGNS, LIGHT AND UTILITY POLES | |||
| ITEM # | DESCRIPTION | UNIT | COST/UNIT |
| 3.1 | WOOD SIGNS/POLES (INCLUDING BASE) | ||
| 3.1.1 | 0 – 600 Square Feet | SF | $ |
| 3.1.2 | Greater than 600 Square Feet | SF | $ |
| 3.2 | METAL SIGNS/POLES (INCLUDING BASE) | ||
| 3.2.1 | 0 – 600 Square Feet | SF | $ |
| 3.2.2 | Greater than 600 Square Feet | SF | $ |
| 3.3 | MONUMENTAL MASONRY SIGNS (INCLUDING BASE) | ||
| 3.3.1 | Any Size per Square Foot | SF | $ |
| 3.4 | BRICK SIGNS (INCLUDING BASE) | ||
| 3.4.1 | Any Size per Square Foot | SF | $ |
| 3.5 | MONOPOLE SIGNS (INCLUDING BASE) | ||
| 3.5.1 | Any Size per Square Foot | SF | $ |
| 3.6 | UTILITY POLES (INCLUDING BASE) | ||
| 3.6.1 | Concrete Poles | LF | $ |
| 3.6.2 | Metal Poles | LF | $ |
| 3.6.3 | Wood Poles | LF | $ |
| 3.7 | Sign Base | ||
| 3.7.1 | Removal of Sign Base Only | SF | $ |
| 3.8 | Bollard | ||
| 3.8.1 | Bollard (concrete/metal/wood) | EA | $ |
| 4.0 MISCELLANEOUS | |||
| ITEM # | DESCRIPTION | UNIT | COST/UNIT |
| 4.1 | SLABS / FOOTER REMOVAL | ||
| 4.1.1 | Less than or equal to 6” in depth/SF | SF | $ |
| 4.1.2 | Greater than 6” in depth/SF | SF | $ |
| 4.1.3 | Asphalt/SF | SF | $ |
| 4.1.4 | Saw cut only per linear foot | LF | $ |
| 4.2 | WOOD DECKS/RAMPS | ||
| 4.2.1 | Any size per square foot | SF | $ |
| 4.2.2 | Removal of boat dock to include piers/pilings | SF | $ |
| 4.3 | OUTBUILDINGS | ||
| 4.3.1 | Any size per square foot | SF | $ |
| 4.4 | ELECTRICAL | ||
| 4.4.1 | Electrical disconnect fee | EA | $ |
| 4.4.2 | Remove exterior lighting per fixture | EA | $ |
| 4.5 | CANOPIES | ||
| 4.5.1 | Canopy Removal | SF | $ |
| 4.6 | SWIMMING POOLS | ||
| 4.6.1 | Above ground pool | SF | $ |
| 4.6.2 | In ground Vinyl lined pool | SF | $ |
| 4.6.3 | In ground Concrete pool | SF | $ |
| 4.6.4 | Pump-out (without removing pool) | each | $ |
| 4.7 | SEPTIC SYSTEMS/BACKFLOW/LIFT STATIONS | ||
| 4.7.1 | Septic System Removal - 0-2,000 gal. | EA | $ |
| 4.7.2 | Septic System Removal - 2,001 gal. and greater | EA | $ |
| 4.7.3 | Lift Station Removal | EA | $ |
| 4.7.4 | Backflow Preventer - Pipe Diameter of 1.5 inches or less | EA | $ |
| 4.7.5 | Backflow Preventer - Pipe Diameter of greater than 1.5 inches | EA | $ |
| 4.8 | FENCE REMOVAL | ||
| 4.8.1 | Wire | LF | $ |
| 4.8.2 | Chain-link | LF | $ |
| 4.8.3 | Wood | LF | $ |
| 4.8.4 | Masonry | LF | $ |
| 4.8.5 | Vinyl | LF | $ |
| 4.8.6 | Metal Sheet | LF | $ |
| 4.9 | WALL REMOVAL | ||
| 4.9.1 | Brick | LF | $ |
| 4.9.2 | Concrete | LF | $ |
| 4.9.3 | Stone | LF | $ |
| 4.10 | WELLS / WATER SUPPLY | ||
| 4.10.1 | Capping – Less than or equal to 6” diameter | EA | $ |
| 4.10.2 | Capping – Greater than 6” in diameter | EA | $ |
| 4.10.3 | Abandonment – Less than or equal to 6” in diameter | LF | $ |
| 4.10.4 | Abandonment – Greater than 6” in diameter | LF | $ |
| 4.11 | IRRIGATION SYSTEMS | ||
| 4.11.1 | Above ground systems | LF | $ |
| 4.11.2 | In-ground systems | LF | $ |
| 4.11.3 | Cut and cap water line (irrigation, well line, etc.) | LF | $ |
| 4.12 | HYDRAULIC LIFTS/GREASE TRAPS | ||
| 4.12.1 | Hydraulic Lift Removal | EA | $ |
| 4.12.2 | Grease Trap Removal | EA | $ |
| 4.12.3 | Hydraulic Lift - remove and dispose of hydraulic fluid | GAL | $ |
| 4.12.4 | Grease Trap – removal and disposal of grease | GAL | $ |
| 4.13 | DEBRIS | ||
| 4.13.1 | Debris Removal | TON | $ |
| 4.14 | FILL | ||
| 4.14.1 | Fill Material | YD | $ |
| 4.15 | HOURLY RATES | ||
| 4.15.1 | Laborer | HR | $ |
| 4.15.2 | Electrician | HR | $ |
| 4.15.3 | Plumber | HR | $ |
| 4.16 | TIRE REMOVAL | ||
| 4.16.1 | Tire Removal | EA | $ |
| 4.17 | WET DEMOLITION | ||
| 4.17.1 | Wet Demo | SF | $ |
| 4.18 | BUILDING CUT OFF | ||
| 4.18.1 | Building Cut-Off and Removal | SF | $ |
| 4.19 | FENCE INSTALLATION | ||
| 4.19.1 | 4’ Field Fence | LF | $ |
| 4.19.2 | 6' Field Fence | LF | $ |
| 4.19.3 | 4' Chain Link Fence | LF | $ |
| 4.19.4 | 6' Chain Link Fence | LF | $ |
| 4.20 | EROSION CONTROL | ||
| 4.20.1 | Hay | EA | $ |
| 4.20.2 | Silt Fence | LF | $ |
| 4.20.3 | Grass Seed | SF | $ |
| 4.20.4 | Sod | SF | $ |
| 4.21 | CLEARING AND GRUBBING | ||
| 4.21.1 | Clearing and Grubbing | SF | $ |
| 4.22 | LAWN AND LANDSCAPING | ||
| 4.22.2 | Tractor Operated Equipment | HR | $ |
| 4.23 | SECURING OF BUILDINGS | ||
| 4.23.1 | 1/2 inch Plywood, 4x8 sheet | EA | $ |
| 4.23.2 | 5/8 inch Plywood, 4x8 sheet | EA | $ |
| 4.23.3 | 3/4 inch Plywood, 4x8 sheet | EA | $ |
| 4.23.4 | Nails | POUND | $ |
| 4.23.5 | Screws | POUND | $ |
| 4.24 | VEHICLE REMOVAL | ||
| 4.24.1 | Vehicle Removal | EA | $ |
| 4.25 | EQUIPMENT RENTAL | ||
| 4.25.1 | Crane | DAILY | $ |
| 4.25.2 | Manlift | DAILY | $ |
| 4.25.3 | Brush Cutter | DAILY | $ |
| 4.26 | PERMITS | ||
| 4.26.1 | Permits compensated at actual value | EA | TBD |
| It's the Departments Intent to award 2 contract for this solicitation. |
| The initial contract will be awarded based on low bid and the |
| second as a supplement. |
A Sample project will be used to determine the total bid.
&14EXHIBIT C
&P of &N
Microsoft_Word_Document.docx MFMP Transaction Fee:
All payment(s) to the vendor resulting from this competitive solicitation WILL be subject to the MFMP Transaction Fee in accordance with the referenced Form PUR 1000 General Contract Condition #7d. The Transaction Fees imposed shall be based upon the date of issuance of the payment.
NOTE: In submitting a response, the bidder acknowledges they have read and agree to the solicitation terms and conditions and their submission is made in conformance with those terms and conditions.
ACKNOWLEDGEMENT: I certify that I have read and agree to abide by all terms and conditions of this solicitation and that I am authorized to sign for the bidder. I certify that the response submitted is made in conformance with all requirements of the solicitation.
Bidder: FEID# .
Address:_______________________________City,State,Zip: .
Phone: E-mail:
Authorized Signature: ______________________________________ Date: ______________