Bid Tab.pdf

PDF 36 KB Posted

Attached to
Demolition and Removal Services
Solicitation number
ITB-15003
Issued by
Walton County, Glencoe CDP, Florida

About this file

This is a Bid Tabulation document from the Florida Department of Transportation (FDOT) District 3 for Invitation to Bid (ITB-26-3014-CS) for Right of Way Demolition and Removal Services across 16 counties. The procurement seeks qualified contractors to provide comprehensive demolition and removal services for structures, improvements, and debris on FDOT lands and state-controlled areas adjacent to highway rights-of-way. Services include teardown of residential and commercial structures, mobile homes, signs, utility poles, foundation and slab removal, abandonment of wells and septic systems, debris removal, site clearing, and equipment rental. The contract is structured as an indefinite quantity agreement with a 36-month term commencing March 27, 2026, with possible renewal for up to three additional years. Sealed bids were due March 4, 2026, at 10:30 a.m. Central Time, with public bid opening held March 4, 2026, at 2:00 p.m. in Chipley, Florida. The intended award posting occurred on March 6, 2026, with posting maintained until March 11, 2026.

Four bids were received and evaluated. Ground N Ground, LLC submitted the lowest bid at $160,767.46 and received the intended award. Ceres Environmental Services, Inc. bid $391,667.56, Cross Construction Services, Inc. bid $278,666.75, and Cross Environmental Services, Inc. bid $138,429.00. The award determination utilized an In-State Preference in accordance with Florida Statutes Section 287.084. The Department notes that the intended award does not constitute final acceptance and reserves the right to reject all bids, award to the second-lowest bidder, or take other action in its best interest if irregularities are discovered in the winning bid or if the contractor fails to submit required bonds, insurance, and compliance documentation. Bidders were required to demonstrate a minimum of two years of active engagement in demolition services and submit written qualifications with references.

View the file

Other files

File Type Posted
Exhibit C - Bid Sheet.xlsx XLSX spreadsheet
Addendum 1.pdf PDF
Bid Documents ITB-26-3014-CS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

BID TABULATION

375-040-2A

PROCUREMENT

03/17

BID NUMBER: DOT-ITB-26-3014-CS

FAILURE TO FILE A PROTEST WITHIN THE

TIME PRESCRIBED IN SECTION 120.57(3),

FLORIDA STATUTES, OR FAILURE TO POST

THE BOND OR OTHER SECURITY REQUIRED

BY LAW WITHIN THE TIME ALLOWED FOR

FILING A BOND SHALL CONSTITUTE A WAIVER

OF PROCEEDINGS UNDER CHAPTER 120,

FLORIDA STATUTES.

OPENING DATE: 3/4/2026 TIME: 2:00PM

BID TITLE:

Right of Way Demolition and Removal Services OPENED BY: Chrissy Sims

WITNESSED BY: Karen Woodham

POSTING TIME/DATE FROM: 3/6/2026 @ 2:00PM UNTIL: 3/11/2026 @ 2:00PM PAGE: 1 of 1 PAGES(S)

Bidders Price Intended

Award

Break N Ground, LLC $160,767.46 X

Ceres Environmental Services, Inc.

$391,667.56

Cross Construction Services, Inc. $278,666.75

Cross Environmental Services, Inc.

$138,429.00 X

Receipt of No Competitive Bids Evaluated by:

JUSTIFICATION FOR AWARD OF SINGLE BID:

Intended Award was determined by utilizing an In-State Preference in accordance with s.287.084, Florida Statutes (check box when applicable).

X Indicates apparent awarded vendor, but does not constitute an acceptance of any offer created by vendor's bid. No binding contract will be deemed to exist until such time as a Purchase Order or written acceptance by the Department has been issued. If irregularities are subsequently discovered in the vendor's bid or if the vendor fails to submit required Bonds and Insurance, or otherwise fails to comply with the bid requirements, the Department has the Right to Award to the vendor that is second low, reject all bids, or act in the best interest of the Department.

File details come from the government source that posted it. Updated .