Exhibit_C_-2007_AH_Plans.pdf

PDF 9 MB Posted

Attached to
Professional Construction Management/General Contracting Services for the Volusia County Branch Jail Air Handler and Fire Alarm Project
Solicitation number
27-SQ-14KO, C2102
Issued by
Volusia County, Florida

About this file

This file consists of construction plan exhibits for the Volusia County Branch Jail Air Handler and Fire Alarm Project in Daytona Beach, Florida. The documents include comprehensive electrical and mechanical design plans prepared by Dewberry (mechanical) and Ingenuity Engineers (electrical and fire alarm) for a life-safety and HVAC renewal project at the single-story detention facility located at 1300 Red John Drive. The electrical plans encompass renovation staging, roof-level demolition and renovation plans, mechanical room renovations, riser diagrams, AHU electrical data matrices, and detailed electrical schedules. The mechanical plans detail air balance specifications, renovation staging, roof-level demolition and comprehensive renovation plans, individual mechanical room plans, room sections, mechanical details, equipment schedules, and controls with sequence of operation documentation.

The project scope includes replacement of housing-pod chilled-water air handling units, mechanical-room ductwork, coils, and outside-air louvers; facility-wide replacement of fire/smoke dampers with UL 555/555S rated units; installation of new smoke exhaust fans providing pod-level isolation and purge capability; and replacement of the existing fire alarm system with a networked, addressable system utilizing redundant fiber-optic communication loops. Integration with the facility's building automation system is required. The design has been completed to bid set stage, and Volusia County is soliciting qualified Construction Management and General Contractor firms to execute the work while the facility remains fully occupied and operational, requiring extensive coordination with Corrections staff, County Facilities Management, temporary cooling provisions for occupied pods, and adherence to security protocols throughout construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBJAIL 00CS Cover Sheet

DBJAIL E0.01 Electrical Notes, Legend and Abbrev
DBJAIL E1.01 Electrical Renovation Staging Plan
DBJAIL E2.01 Electrical Roof Level Plan-Demolition
DBJAIL E3.01 Electrical Roof Level Plan
DBJAIL E3.02 Electrical Rooms - Reno Plan
DBJAIL E3.03 Mechanical Rms 2_3_5-13_15 Electrical Reno
DBJAIL E3.04 Mechanical Rms 14&16 Electrical Reno
DBJAIL E5.01 Electrical Riser Diagram
DBJAIL E6.01 AHU Electrical Data Matrix
DBJAIL E7.01 Electrical Schedules
DBJAIL E7.02 Electrical Schedules
DBJAIL E7.03 Electrical Schedules
DBJAIL E7.04 Electrical Schedules
DBJAIL M0.01 Mechanical Notes Legend & Abbreviations
DBJAIL M1.01 Proposed Air Balance
DBJAIL M1.02 Mechanical Renovation Staging Plan
DBJAIL M2.01 Comprehensive Mechanical Roof Level - Demo
DBJAIL M3.01 Mechanical Roof Level - Reno
DBJAIL M3.01 Comprehensive Mechanical Roof Level - Reno
DBJAIL M3.02 Mechanical Room 1 - Reno Plan
DBJAIL M3.03 Mechanical Rooms - Reno Plan
DBJAIL M3.04 Mechanical Rooms 14&16 Reno
DBJAIL M4.01 Mechanical Room Sections
DBJAIL M5.01 Mechanical Details
DBJAIL M5.02 Mechanical Details
DBJAIL M6.01 Mechanical Schedules
DBJAIL M8.01 Mechanical Controls
DBJAIL M8.02 Mechanical Sequence of Operation

File details come from the government source that posted it. Updated .