Exhibit B is a vegetation restoration specification document from the Michigan Department of Natural Resources' Forest Resources Division, detailing requirements for re-establishing vegetation on state forest lands after clearing activities such as well sites, rights-of-way, and utility installations. The document provides comprehensive guidelines for site restoration, including soil preservation, topsoil management, seeding specifications, and restoration timelines. Contractors must complete vegetation restoration within 9 months of initial site clearing, using specified seed mixtures tailored to different soil types including mineral soils, organic soils, and unstable sand areas. Seeding is restricted to frost-free conditions, excluding June, July, and August, unless specifically approved by the department representative.

The specification outlines precise technical requirements for site restoration, including soil preparation, fertilization, mulching, and planting protocols. Seed mixtures vary based on soil conditions, with specific seed types and quantities prescribed for different environments such as clay, sandy loams, and dune areas. Additional requirements include cleaning planting equipment to prevent invasive plant spread, covering seeds 1/4 to 1/2 inch deep, and applying mulch within 24 hours of seeding. The document also allows for potential tree and shrub plantings, with up to 600 seedlings possible per acre, and mandates annual site inspections by the permit holder to ensure ongoing vegetation establishment and repair of any erosion or bare areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B

IC4287 (Rev. 04/30/2013)

Michigan Department of Natural Resources – Forest Resources Division

VEGETATION RESTORATION OF RIGHTS-OF-WAY, WELL SITES, AND

OTHER CLEARED SITES ON STATE FOREST LAND

- NORTHERN LOWER PENINSULA -

All areas must be satisfactorily re-vegetated as specified by these guidelines except areas that are required to be kept cleared of vegetation under Part 615, Supervisor of Wells, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA).

All topsoil must be saved as the first action in development in order to provide the best guarantee of success for future site restoration.

The saving and stockpiling of topsoil, however thin the layer may be, contains the nutrients, organic matter, and other elements that favor germination and growth of vegetative cover.

If only subsoil remains after site development, it contains fewer nutrients, and the site will be very difficult to restore.

If abandoned, a soil test is mandatory and the pH of the pad and/or pipeline must be adjusted to match that of adjacent stands.

Upon completion of drilling, flowline, pipeline, utility installation, or other type of installation; and also upon abandonment/cessation of use, the access road, drilling pad, pipeline, utility right-of-way, or leased premises must be re-vegetated and restored as detailed below to the satisfaction of the Forest Unit Manager (Department/Grantor's/Lessor’s representative).

The entire site must be returned to original contours as much as possible. All perimeter slopes shall not exceed a 1:4 slope.

The topsoil which has been saved and stockpiled prior to site development must be evenly distributed over the area to be re-vegetated. It will be smoothed and tillage tools used as necessary to provide at least 3 inches of firm (rolled or culti-packed at least twice) but friable seedbed, free of large clumps and stones.

On mineral soils, soil tests are recommended but, in lieu of a soil test, fertilizer will be applied at a rate of 500 pounds per acre of 12-12-12 or equivalent. Fertilizer will be tilled into the soil during the final seedbed preparation. All clover seed shall be treated with the proper inoculant.

Seeding should take place in frost free conditions, excluding the months of June, July, and August, unless otherwise approved by the Department/Grantor's/Lessor’s representative.

Vegetation restoration must be completed within 9 months of the initial clearing of the easement or site, unless otherwise specified by the Department/Grantor's/ Lessor’s representative.

All planting equipment and machinery must be cleaned to remove possible invasive plants before moving or arriving at the site to be planted.

Cover all seed 1/4 to 1/2 inch deep. The area may be seeded by hydro-seeder.

After seeding on mineral soils, the area must be mulched within 24 hours of seeding with weed-free straw at a rate of 2 tons per acre;

or a rate of 2 to 3 small rectangular bales per 1,000 square feet.

Other commercially prepared mulch may be used, if approved in writing by the Department/ Grantor's representative. It is recommended that mulch be mechanically applied. Under NO circumstances may hay be used.

The following seeding mixtures are for application on various soils:

Mineral Soils (Good Soil), Clays, Loams, Loamy Sands

June Grass (Koelaria micrantha) 0.5 lbs./acre

White Dutch Clover (Triflolium repens) 2 lbs./acre

Medium Red Clover (Triflolium pratense) 2 lbs./acre

Butterflyweed (Asclepias tuberosa) 1 lb./acre

Annual Rye or Oats Cover Crop 2 bushel/ac.

Mineral Soils (Medium Soil), Sandy Loams

June Grass (Koelaria micrantha) 0.4 lbs./acre

Little Blue Stem (Schizachyrium scoparius) 4 lbs./acre

Medium Red Clover (Triflolium pratense) 2 lbs./acre

Round-headed Bush Clover (Lespedeza capitata) 2 lbs./acre

Butterflyweed (Asclepias tuberosa) 1 lb./acre

Mineral Soils (Critical Area/Very Poor Soil, e.g. Grayling Sand)

Big Blue Stem (Andropogon geradii) 3 lbs./acre

Indian Grass (Sorghastrum nutans) 1 lbs./acre

Little Blue Stem (Schizachyrium scoparium) 5 lbs./acre

June Grass (Koelaria micrantha) 0.2 lbs./acre

Medium Red Clover (Triflolium pratense) 2 lbs./acre

Lance-leaved coreopsis (Coreopsis lanceolata) 1 lb./acre

Organic Soils

Alsike Clover (Triflolium hybridum) 2 lbs./acre

White Dutch Clover (Triflolium repens) 2 lbs./acre

Canada Wild Rye (Elymus Canadensis) 3 lbs./acre

June Grass (Koelaria micrantha) 0.3 lbs./acre

Dunes/Unstable Sand Blow Areas

Canada Wild Rye (Elymus Canadensis) 3 lbs./acre

American Beach Grass (Ampophila breviligulata)

(A culm is the stem portion of the plant)

2 to 3 culms every 18”

Jack Pine Barrens & Prairies

Save all topsoil including root mass, evenly distribute during re-vegetation, till, and seed with the following cover crops Canada Wild Rye (Elymus Canadensis) 3 lbs./acre

Annual Rye 1 bushel/ac Oats 1 bushel/ac

In addition, tree and/or shrub seedlings may be required on certain sites because of special resource values. Up to 600 shrubs or tree seedlings may be required per acre on the site to be re-vegetated.

If needed, these will be planted at a spacing and design as directed by the Department/ Grantor's/Lessor’s representative.

The entire well site or right-of-way must be inspected yearly by the Permittee/Grantee and any erosion or bare area repaired, re-seeded, and fertilized immediately.

The entire area must be re-fertilized, as necessary and to the satisfaction of the Department/Grantor's/Lessor’s representative, until natural vegetation is fully re-established. Upon abandonment, vegetative cover must be successfully established to the satisfaction of the Department/ Grantor's/Lessor’s representative.