This document is a Division Two Site Work specification from the State of Michigan, specifically involving the Michigan Department of Natural Resources (DNR) for a site restoration project. A mandatory pre-bid meeting was scheduled for February 28, 2013, at 10:00 AM at the Atlanta DNR Office, where project managers would be available to answer questions and provide project site information. The scope of work includes comprehensive site restoration activities such as removing existing improvements (houses, buildings, poles, signs, fences, concrete, and asphalt), complete site grading, and final site restoration through fertilizing, seeding, and mulching.
The project involves significant site clearance and environmental preparation, with specific requirements for utility disconnection, debris removal, and site rehabilitation. Notable environmental considerations include potential lead-based paint and asbestos hazards, with explicit disclaimers that bidders are responsible for determining material content before purchase. The project will follow Michigan Department of Transportation Standard Specifications for Construction, and contractors must adhere to strict guidelines for vegetation removal, disposal, excavation, and site restoration. The State of Michigan is selling the property on an "as-is" basis, requiring thorough due diligence from potential contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 751-19361 D-4_maps 2 sites.pdf | ||
| 751-19361AGY D-3 D-4 ADD#1 site maps.docx | DOCX document | |
| 751-19361 AGY Spec D3-D4 (Rev02-19).docx | DOCX document | |
| FR2019 D4 Alpena list ACM Reports.pdf | ||
| Bid Clarification.dotx | DOTX file | |
| 751-19361AGY D-3 Maps _3 sites.pdf | ||
| FR2019-D3 CheboyganPresqueIsle Demo List - ACM Reports.pdf | ||
| Exhibit B seeding reqmts .pdf | ||
| 751-19361 D3 D4 AGY DTMB-0415 (Advertisment)(R04-19).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION TWO - SITE WORK
SECTION 02100
SITE RESTORATION
PART ONE - GENERAL
1.01
DESCRIPTION
A.
Work included: The work under this Section includes, but is not necessarily limited to backfilling, removing all improvements including noted houses and buildings, posts, flag poles, poles, signs, yard lights, fences, parking bumpers, deck and slabs, all concrete, asphalt, footings foundations, debris; and grading, fertilizing, seeding, and mulching the entire work site to conform with existing grades.
B.
Local unit of state government will arrange to have all public utilities disconnected from the work site.
C.
It shall be understood that the Michigan Department of Transportation Standard Specifications for Construction Sections 201.01 through 209.04 and Section 816.03 are essential parts of this contract.
D.
A Mandatory pre-bid meeting will be held at 10:00 AM, local time, on Thursday, February 28, 2013 at Atlanta DNR Office 13501 M-33 Atlanta MI. The purpose of the inspection is to answer questions, and provide additional information of the project sites. The project manager or his/her representative will be available to assist the bidders.
E.
The project manager will arrange utility disconnection and appropriate sealing from the work site.
HAZARDOUS MATERIALS
1.
Lead Based Paint: Section 1018 of the Residential Lead Based Paint Hazard Reduction Act of 1992, as amended requires that every purchaser or tenant of residential real property built prior to 1978 must be notified that such property may present exposure to lead from lead-based paint that may place young children at risk of developing lead poisoning. Lead poisoning in young children may produce permanent neurological damage, including learning disabilities, reduced intelligence quotient, behavioral problems, and impaired memory. Lead poisoning also poses a particular risk to pregnant women. The seller of any interest in residential real property is required to provide the buyer with any information on lead-based paint hazards from risk assessments of inspections in the seller's possession and notify the buyer of any known lead-based paint hazards. A risk assessment or inspection for possible lead-based paint hazards is recommended prior to purchase. Before renting pre-1978 housing, landlords must disclose the presence of known lead-based paint and lead-based paint hazards in the dwelling. Tenants must also receive a Federally approved pamphlet on lead poisoning prevention.
The prospective Purchaser of this property is hereby notified of the potential of existing lead-based paint content. The State of Michigan, as the seller of this property, makes no claims or warrantees, written or otherwise, as to the lead-based paint content of this property and its appurtenances. The lead-based paint content of this property and its appurtenances is unknown. It is the sole responsibility of the bidder to determine the content of lead-based paint, if any, of the property and its appurtenances before bidding and final purchase. The State of Michigan sells this property on a “where is, as is” basis.
2.
Asbestos: All contractors working on this site are hereby notified of the potential of existing asbestos-containing materials. The State of Michigan, as seller of the property, makes no claims or warrantees, written or otherwise, as to the asbestos content of this property and its appurtenances. It is the sole responsibility of the bidder to determine the asbestos content, if any, of the property and its appurtenances before bidding and final purchase. The State of Michigan sells this property on a “where is, as is” basis. An asbestos survey report summary is being included as part of the bid package. The State of Michigan makes no claims as to its accuracy or content, and makes no warranties as to its usefulness for any purpose.
1.02
QUALITY ASSURANCE
Use adequate numbers of skilled workers who are thoroughly trained and experienced in the necessary crafts, and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section.
D.
Inspections: The project manager will establish with the contractor the following specific check points for inspection:
Adequate barricades around work site before work commencement.
Final Inspection.
Other specific inspections may be scheduled as directed by the project manager.
PART TWO – MATERIALS
2.01
GENERAL
A. All materials for topsoil, fertilizing, seeding, and mulch shall be as directed by the Project Manager.
PART THREE - EXECUTION
3.01
EXAMINATION
Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected.
3.02
PREPARATION
Protection:
Protect existing utilities to remain as indicated by the project manager. CALL "MISS-DIG" to confirm locations of utilities.
Protect trees and shrubs, where indicated to remain, by providing a fence around the tree or shrub of sufficient distance away and of sufficient height so trees and shrubs will not be damaged in any way as part of this Work. Any damaged items shall be repaired or replaced at the expense of the Contractor.
B.seq level2 \h \r0 Clearing:
Where trees indicated to be removed cannot be felled without danger to other trees, structures or property, they shall be cut down in sections
Relocation of Vegetation: Trees and/or shrubbery that must be removed to accommodate the moving or demolition of the improvements or structures shall become the property and the responsibility of the successful bidder, unless otherwise specified by the Project Manager. Removal of shrubbery or nursery stock from the property is subject to the approval of the Michigan Department of Agriculture in accordance with the provisions of Public Act 189 of 1931 as amended.
3.
Clean out roots 1" in diameter and larger to a depth of at least 12" below the existing ground surface or subgrade of new graded surface, whichever is lower.
C.
Relocation of Buildings or Structures: It is advisable to check with the City or Township where the buildings or structures will be relocated, to determine if they will permit the move.
D.seq level2 \h \r0 Disposal:
General:
a.
Remove brush, roots, trash, and other material from clearing operations.
b.
Dispose of away from the site in a legal manner.
c.
Do not store or permit debris to accumulate on the job site.
2.seq level3 \h \r0 On-site burning of combustible materials will be allowed provided permits are obtained and precautions taken accordingly.
3.
Contractor shall not remove any trees from outside the grading limits.
4.
All timber logs and parts of trees suitable for firewood, with a minimum of four inch diameter, resulting from removal of any trees, shall remain the property of the State. They shall be cut in eight-foot lengths, or less, and piled at the location as directed by the project manager. Chipping and spreading on site may be permitted only as directed by the project manager.
Excavation, Backfill, and Compaction
Excavation for the removal of utilities and structures shall be in accordance with Michigan Department of Transportation Standard Specifications for Construction, most current edition.
Backfill and compaction after the removal utilities and structures shall be in accordance with Michigan Department of Transportation Standard Specifications for Construction, most current edition.
F.
Topsoil, Fertilizing, Seeding, and Mulching
Topsoil shall be as directed by the Project Manager.
END OF SECTION