Exhibit B Pueblo Regional Center Boiler Replacement.docx

DOCX document 17 KB Posted

Attached to
Pueblo Regional Center Hub A Boiler Replacement DQ
Solicitation number
DQ1 IHHA 2027000015 1
Issued by
Pueblo County, Colorado

About this file

This is a Scope of Work exhibit for the Pueblo Regional Center Hub A Boiler Replacement project in Colorado. The project involves the replacement of an existing 2.1 million BTU hot water boiler (Model #211A-11-W/S-1, Serial #503452-200501) that has reached the end of its serviceable life due to age, deteriorating condition, increasing maintenance requirements, declining reliability, and failed components. The scope of work includes complete demolition and removal of the existing boiler system along with all associated components such as controls, tanks, pumps, motors, piping modifications, and related equipment necessary for installation of a new boiler system. The project will prioritize like-for-like replacement whenever possible; however, if an identical replacement unit is no longer manufactured or available, modifications to existing piping, venting, electrical, gas, and control systems may be required to accommodate the new boiler and ensure compliance with current mechanical and safety codes. All project specifics will be finalized during a mandatory project walk-through.

No pricing terms, set-asides, incumbent information, funding sources, response dates, award dates, or contract term details are provided in this scope of work document.

View the file

Other files

File Type Posted
Exhibit A Bid Bond.docx DOCX document
Documented Quote.docx DOCX document
Exhibit D Sample Performance Bond.pdf PDF
Exhibit D Sample Labor and Material Bond.pdf PDF
Exhibit C SC6.23 DBB GC_2025.pdf PDF
Exhibit C Sample SC6.21 DBB A_2025 R1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pueblo Regional Center Boiler Replacement.

Exhibit B Scope Work

The scope of work is to include replacement of the existing 2.1 million BTU hot water boiler (Model #211A-11-W/S-1, Serial #503452-200501) due to the age and deteriorating condition of the equipment, increasing maintenance requirements, declining reliability, and failed components. The project shall include the demolition and removal of the existing boiler and all associated components, including controls, tanks, pumps, motors, piping modifications as required, and related equipment necessary to install a new boiler system.

The intent is to install a like-for-like replacement whenever possible. However, due to the age of the existing equipment, an identical replacement unit may no longer be manufactured or available. If a like-for-like replacement cannot be obtained, modifications to the existing piping, venting, electrical, gas, and control systems may be required to accommodate the new boiler and ensure compliance with current mechanical and safety codes. All specifics will be covered during mandatory project walk