Exhibit B Pueblo Regional Center Boiler Replacement.docx
DOCX document 17 KB Posted
- Solicitation number
- DQ1 IHHA 2027000015 1
- Issued by
- Pueblo County, Colorado
About this file
This is a Scope of Work exhibit for the Pueblo Regional Center Hub A Boiler Replacement project in Colorado. The project involves the replacement of an existing 2.1 million BTU hot water boiler (Model #211A-11-W/S-1, Serial #503452-200501) that has reached the end of its serviceable life due to age, deteriorating condition, increasing maintenance requirements, declining reliability, and failed components. The scope of work includes complete demolition and removal of the existing boiler system along with all associated components such as controls, tanks, pumps, motors, piping modifications, and related equipment necessary for installation of a new boiler system. The project will prioritize like-for-like replacement whenever possible; however, if an identical replacement unit is no longer manufactured or available, modifications to existing piping, venting, electrical, gas, and control systems may be required to accommodate the new boiler and ensure compliance with current mechanical and safety codes. All project specifics will be finalized during a mandatory project walk-through.
No pricing terms, set-asides, incumbent information, funding sources, response dates, award dates, or contract term details are provided in this scope of work document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A Bid Bond.docx | DOCX document | |
| Documented Quote.docx | DOCX document | |
| Exhibit D Sample Performance Bond.pdf | ||
| Exhibit D Sample Labor and Material Bond.pdf | ||
| Exhibit C SC6.23 DBB GC_2025.pdf | ||
| Exhibit C Sample SC6.21 DBB A_2025 R1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pueblo Regional Center Boiler Replacement.
Exhibit B Scope Work
The scope of work is to include replacement of the existing 2.1 million BTU hot water boiler (Model #211A-11-W/S-1, Serial #503452-200501) due to the age and deteriorating condition of the equipment, increasing maintenance requirements, declining reliability, and failed components. The project shall include the demolition and removal of the existing boiler and all associated components, including controls, tanks, pumps, motors, piping modifications as required, and related equipment necessary to install a new boiler system.
The intent is to install a like-for-like replacement whenever possible. However, due to the age of the existing equipment, an identical replacement unit may no longer be manufactured or available. If a like-for-like replacement cannot be obtained, modifications to the existing piping, venting, electrical, gas, and control systems may be required to accommodate the new boiler and ensure compliance with current mechanical and safety codes. All specifics will be covered during mandatory project walk
File details come from the government source that posted it. Updated .