Exhibit B Project Maps.pdf

PDF 3 MB Posted

Attached to
Lower Smith River Property Boundary Surveys
Solicitation number
S-X06001-00016856
Issued by
Douglas County, Oregon

About this file

Exhibit B is a project map document for the Lower Smith River Property Boundary Surveys contract opportunity in Oregon. The project encompasses two phases of boundary survey work across multiple township and range sections in the Lower Smith River area. Phase 1 survey work totals 7.1 miles, while Phase 2 encompasses 3.9 miles of survey lines. The project map identifies survey priority areas, ownership categories including CTCLUSI lands, Bureau of Land Management parcels, private property, and U.S. Forest Service holdings, with road classifications denoting paved, gravel, and natural or unknown surface types. The map references specific township locations (T. 20 S, R. 9 W. and T. 20 S, R. 10 W.) and indicates previous survey work conducted between 1951 and 2021 by various licensed professional surveyors and government agencies.

The document identifies multiple sections requiring survey work with specific focus on lines to run and corner establishment related to Smith Survey phases. Previous survey references include work by Roberts PLS, Tillman BLM, DCSO, Estabrook PLS, and Hostetter PLS, indicating that some areas have existing survey documentation dating back to 1951-52 while others require new survey work to be completed. The map provides scale reference of 1 inch equals 0.5 miles and specifies township and range designations necessary for accurate boundary identification and survey execution in the designated project area.

View the file

Other files

File Type Posted
Exhibit D Sample Contract.pdf PDF
Exhibit A SoW and Specs_All.pdf PDF
CTCLUSI RFQ ADDENDUM ONE ALL~1.pdf PDF
Smith Surveying RFQ~1.pdf PDF
Exhibit C Bid Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

040506

19 20

C o o n

C rk

R d g R d

Johnson

C rk

R dg

R d

Coon C rk R dg Rd

Coon Crk

Rdg Rd

W Fo rk

S m it h

R iv er R d

Fisker-Smith Rd

E Fork Spencer Crk Rd

S p e n ce r

R d g S p u r

Smith River Rd

Spencer

Crk Spur 2

C o on C rk R dg R d

Spencer Crk Spur #2

Spencer

Crk Rd

C oon

C rk

R d

W Fo rk

Smith

R iv er

Rd

Johnson Crk Rd

Legend

Survey Priority Phase

Complete

Ownership

CTCLUSI

Bureau of Land Management

Private

U.S. Forest Service

Road Paved Surface

Gravel Surface

Natural orUnknown Surface

Township and Range

1 inch = 0.5 Miles 0 0.5 10.25 Miles

Exhibit B

Mileage Phase 1: 7.1 miles Phase 2: 3.9 miles

T. 20 S, R. 9 W.

secs. 19 and 20

Desired: Priority

Phase 1

Phase 2

Previous Surveys

1982 Roberts PLS (M 90-28)

1982 Roberts PLS (M 90-33)

T. 20 S, R. 10 W.

secs. 12 and 13

Desired: Priority

Phase 1

Phase 2

Previous Surveys

1951-52 Tillman BLM

2021 Estabrook PLS (M 180-12)

T. 20 S, R. 10 W.

sec. 1

Desired: Priority

Phase 1

Phase 2

Previous Surveys

1951-52 Tillman BLM

1968 DCSO

2021 Estabrook PLS (M 180-12)

2021 Estabrook PLS (M 180-35)

New Survey Required line to run

T. 20 S, R. 9 W.

secs. 7 and 8

Desired: Priority

Phase 1

Phase 2

Previous Surveys 1951-52 Tillman BLM 1953-54 Tillman and Gawron BLM 1965 admin BLM and USFS

1977 DCSO (CS 59/34-12)

2019 Hostetter PLS (CS 65/103-13) 2021 Estabrook PLS (M 180-35)

New Survey Required line to run corner to establish

SmithSurveyPhasesV2.pdf
4 WOTFA CTCLUSI Lower Smith - Lines to Run.pdf

File details come from the government source that posted it. Updated .