Exhibit B Project Maps.pdf
PDF 3 MB Posted
- Attached to
- Lower Smith River Property Boundary Surveys
- Solicitation number
- S-X06001-00016856
- Issued by
- Douglas County, Oregon
About this file
Exhibit B is a project map document for the Lower Smith River Property Boundary Surveys contract opportunity in Oregon. The project encompasses two phases of boundary survey work across multiple township and range sections in the Lower Smith River area. Phase 1 survey work totals 7.1 miles, while Phase 2 encompasses 3.9 miles of survey lines. The project map identifies survey priority areas, ownership categories including CTCLUSI lands, Bureau of Land Management parcels, private property, and U.S. Forest Service holdings, with road classifications denoting paved, gravel, and natural or unknown surface types. The map references specific township locations (T. 20 S, R. 9 W. and T. 20 S, R. 10 W.) and indicates previous survey work conducted between 1951 and 2021 by various licensed professional surveyors and government agencies.
The document identifies multiple sections requiring survey work with specific focus on lines to run and corner establishment related to Smith Survey phases. Previous survey references include work by Roberts PLS, Tillman BLM, DCSO, Estabrook PLS, and Hostetter PLS, indicating that some areas have existing survey documentation dating back to 1951-52 while others require new survey work to be completed. The map provides scale reference of 1 inch equals 0.5 miles and specifies township and range designations necessary for accurate boundary identification and survey execution in the designated project area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit D Sample Contract.pdf | ||
| Exhibit A SoW and Specs_All.pdf | ||
| CTCLUSI RFQ ADDENDUM ONE ALL~1.pdf | ||
| Smith Surveying RFQ~1.pdf | ||
| Exhibit C Bid Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
040506
19 20
C o o n
C rk
R d g R d
Johnson
C rk
R dg
R d
Coon C rk R dg Rd
Coon Crk
Rdg Rd
W Fo rk
S m it h
R iv er R d
Fisker-Smith Rd
E Fork Spencer Crk Rd
S p e n ce r
R d g S p u r
Smith River Rd
Spencer
Crk Spur 2
C o on C rk R dg R d
Spencer Crk Spur #2
Spencer
Crk Rd
C oon
C rk
R d
W Fo rk
Smith
R iv er
Rd
Johnson Crk Rd
Legend
Survey Priority Phase
Complete
Ownership
CTCLUSI
Bureau of Land Management
Private
U.S. Forest Service
Road Paved Surface
Gravel Surface
Natural orUnknown Surface
Township and Range
1 inch = 0.5 Miles 0 0.5 10.25 Miles
Exhibit B
Mileage Phase 1: 7.1 miles Phase 2: 3.9 miles
T. 20 S, R. 9 W.
secs. 19 and 20
Desired: Priority
Phase 1
Phase 2
Previous Surveys
1982 Roberts PLS (M 90-28)
1982 Roberts PLS (M 90-33)
T. 20 S, R. 10 W.
secs. 12 and 13
Desired: Priority
Phase 1
Phase 2
Previous Surveys
1951-52 Tillman BLM
2021 Estabrook PLS (M 180-12)
T. 20 S, R. 10 W.
sec. 1
Desired: Priority
Phase 1
Phase 2
Previous Surveys
1951-52 Tillman BLM
1968 DCSO
2021 Estabrook PLS (M 180-12)
2021 Estabrook PLS (M 180-35)
New Survey Required line to run
T. 20 S, R. 9 W.
secs. 7 and 8
Desired: Priority
Phase 1
Phase 2
Previous Surveys 1951-52 Tillman BLM 1953-54 Tillman and Gawron BLM 1965 admin BLM and USFS
1977 DCSO (CS 59/34-12)
2019 Hostetter PLS (CS 65/103-13) 2021 Estabrook PLS (M 180-35)
New Survey Required line to run corner to establish
| SmithSurveyPhasesV2.pdf |
| 4 WOTFA CTCLUSI Lower Smith - Lines to Run.pdf |
File details come from the government source that posted it. Updated .