Exhibit B - Price Sheet Summary
This is a price sheet for Volusia County's Request for Proposal #25-P-49LS for the design and retrofit of an emergency mobile command center transit outreach mobile bus. The project encompasses two primary line items: Design (1 each) and Construction Build (1 each), with contractors required to complete the price sheet in its entirety to be deemed responsive. The scope involves retrofitting a 35-foot Gillig Low Floor Bus for use by the Transit Services Division to perform transit dispatching operations during emergencies and various outreach activities. Mandatory in-person pre-proposal conferences are scheduled for September 23 and 24, 2025, with questions due by October 8, 2025, and proposals due electronically by October 22, 2025, at 3:01 pm. The contract term is expected to be one year from the effective date. Participating vendors must be located within 250 miles of Transit Services.
The price sheet requires contractors to enter the total cost for both Design and Construction Build line items, with a separate line for Performance and Payment Bond costs, and a final total cost calculation inclusive of the bond. The approximate budget for the design and retrofit project is $150,000. Contractors must submit complete pricing information as part of their proposal response, and failure to complete the price sheet in its entirety will result in a non-responsive submission. Volusia County reserves the right to make multiple awards or award only a portion of the requested services.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contractor shall complete Price Sheet in its entirety to be deemed responsive. Contractor shall enter the TOTAL in the TOTAL COST block in the table Section 5 Pricing Proposal. | ||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | TOTAL |
| 1 | Design | 1 | EA |
| 2 | Construction Build | 1 | EA |
| Total Base Bid | $0.00 |
| Performance and Payment Bond | |
| TOTAL (inclusive of Performance and Payment Bond) | $0.00 |
&"Arial,Bold"&12Exhibit B - Price Sheet &"Arial,Bold"&14DESIGN BUILD