EXHIBIT B- Performance Requirements Summary.docx
DOCX document 13 KB Posted
- Attached to
- GVSC ISO/IEC 17025 Laboratory Accreditation
- Solicitation number
- W56HZV-22-R-L061
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 0002 Scopes of Accreditation.xlsx | XLSX spreadsheet | |
| ISO Audits CDRL A003 v3.pdf | ||
| ISO Audits CDRL A001 v3.pdf | ||
| ISO Audits CDRL A002 v3.pdf | ||
| W56HZV-22-R-L061.pdf | ||
| Attachment 0002- Scopes of Accreditation 7-7-22.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT B
Performance Requirements Summary:
The Contractor service requirements are summarized into performance objective that relates directly to mission essential items. The performance threshold briefly describes the maximum acceptable levels of services for each requirement. These thresholds are critical to mission success.
| SERVICE |
| PARAGRAPH NUMBER |
| STANDARDS |
| AQL |
| METHOD OF SURVEILLANCE |
| The Contractor shall provide an Accreditation Assessment Report including each lab assessed, IAW CDRL A001. |
| 8.1 |
| Report due no more than 5 working days after assessment. |
| 100% REQUIRED CONTENT |
100% COMPLETE
100% TIMELY
100 % Inspection by COR
| The Contractor shall provide a Scope of Accreditation for each lab assessed and approved for accreditation, IAW CDRL A002. |
| 8.2 |
| Report due no more than 60 calendar days after approval of corrective actions. |
| 100% REQUIRED CONTENT |
100% COMPLETE
100% TIMELY
100 % Inspection by COR
| The Contractor shall provide a Certificate of Accreditation for each lab assessed and approved for accreditation, IAW CDRL A003. |
| 8.3 |
| Report due no more than 60 calendar days after approval of corrective actions. |
| 100% REQUIRED CONTENT |
100% COMPLETE
100% TIMELY
100 % Inspection by COR
File details come from the government source that posted it. Updated .