Exhibit_B_Green_Infrastructure_Assets.pdf
PDF 34 KB Posted
- Attached to
- Landscaping and Grounds Maintenance Services
- Solicitation number
- 2026-RFP-00070
- Issued by
- San Mateo County, California
About this file
The document is a detailed table of Green Infrastructure Sites for multiple county facilities, including sites managed by Facilities Management Operations (FMO), Engineering, and Health & Hospital departments. The table provides a comprehensive inventory of green infrastructure installations across various county locations, including Maple Street Correctional Center, Navigation Center, ROC, Coyote Point Animal Shelter, North Fair Oaks Parking Lot, Radio Shop, Parking Structure, County Office Building, Middlefield Rd Project, Safe Route to Schools, Fair Oaks Medical Clinic, and Serenity House. The infrastructure types include Bioretention Areas, Flow-Through Planters, Tree Well Filters, and Pervious Pavement, with varying quantities at each site.
The most significant green infrastructure deployment is at the Middlefield Rd Project, which includes 17 Bioretention Areas and 6 Tree Well Filters. The Maple Street Correctional Center has the second-highest number of installations with 11 Bioretention Areas and 7 Flow-Through Planters. Most other sites have fewer installations, with many locations having zero or minimal green infrastructure elements. The County Office Building has 14 Flow-Through Planters, while sites like the Navigation Center, ROC, and Coyote Point Animal Shelter have more limited green infrastructure implementations. Pervious Pavement is only present at the Maple Street Correctional Center with a quantity of 2.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FMO Green Infrastructure Sites Bioretention Area
Quantity Flow-Through Planter
Quantity Tree Well
Filter Quantity
Maple Street Correctional Center 11 7 0
Navigation Center 5 0 0
ROC 4 0 0
Coyote Point Animal Shelter 3 0 0 North Fair Oaks Parking Lot (Middlefield Rd Parking Lot)
3 0 0
Radio Shop 2 0 0 Parking Structure 2 2 0 0 County Office Building 3 14 0 0
Engineering Green Infrastructure Sites
Bioretention Area Quantity
Flow-Through Planter Quantity
Tree Well Filter Quantity
Middlefield Rd Project 17 0 6 Safe Route to Schools 1 0 0
Health & Hospital Green Infrastructure Sites
Bioretention Area Quantity
Flow-Through Planter Quantity
Tree Well Filter Quantity
Fair Oaks Medical Clinic 1 1 0 Serenity House 4 0 0
Pervious Pavement Quantity
Pervious Pavement Quantity
Pervious Pavement Quantity
File details come from the government source that posted it. Updated .