Exhibit B - Deliverables Schedule.pdf
PDF 83 KB Posted
- Attached to
- General Pest Control - Fort Riley, KS
- Solicitation number
- W911RX-25-Q-A008
About this file
This document is Exhibit B - Deliverables Schedule from a solicitation for General Pest Control services at Fort Riley, Kansas. It outlines the required contractor submissions and reporting requirements for the contract.
The schedule specifies several key deliverables including: a Contractor Work Plan; lists of materials, vehicles (with identification details required within 15 days of award), and major equipment (with make/model/capacity details); Safety Data Sheets and sample labels for pesticides and associated chemicals; licenses and certifications; Quality Control Plan; Pesticide Usage Reporting Forms; Termite Treatment Warranties; and Monthly Schedule. Most changes to these deliverables must be submitted to the Contracting Officer (KO) or Contracting Officer's Representative (COR) within seven calendar days of any modifications. The document cross-references other sections of the solicitation for detailed requirements of several deliverables.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8.2 Exhibit B – Deliverables Schedule.
8.2.1 Contractor Work Plan: See Paragraph 5.1.22.
8.2.2 List of Materials. The Contractor shall submit a list of major materials, along with descriptive literature for newer material, to be used to complete the work stated herein.
The Contractor may include this submittal as part of the CWP.
8.2.3 List of Vehicles. The Contractor shall submit a list of vehicles to be used on this contract within 15 calendar days of contract award. The list shall include the vehicle identification number, make, model, year, current license tag number, vehicle color, and contractor identification number, if applicable. The Contractor shall submit changes to this list to the KO or COR seven (7) calendar days of any changes.
8.2.4 List of Major Equipment. The Contractor shall submit a list of major equipment to be used on this contract within 15 days of contract award. The list shall include the make and model of the equipment, capacities, if applicable, and the major use for the equipment. The Contractor shall submit changes to this list to the KO or COR within seven (7) calendar days of any changes.
8.2.5 Safety Data Sheets and Sample Labels. The Contractor shall submit Safety Data Sheets (SDSs) and sample labels for each pesticide and pesticide associated chemical to be used on this contract. The Contractor must include the initial submittal as post of the CWP. The Contractor shall submit updates and changes to the KO or COR seven
(7) calendar days before the requested use date of a different chemical or label change.
8.2.6 License and Certification. See paragraph 5.1.7.
8.2.7 Quality Control Plan. See paragraph 5.1.22.4.
8.2.8 Pesticide Usage Reporting Forms. See paragraph 5.1.5.
8.2.9 Termite Treatment Warranties. See paragraph 5.1.16.2.4
8.2.10 Monthly Schedule. See paragraph 5.1.22.1.2
File details come from the government source that posted it. Updated .