About this file

The document is an Exhibit B Cost Summary Sheet for RFP202590000654, issued by the University (West Virginia University) for the HSC South Elevator Modernization project. The solicitation covers comprehensive elevator modernization work for multiple passenger elevators at the Health Sciences Center South, including labor and materials for elevator equipment replacement, hoistway frame repairs, electrical work, HVAC modifications, plumbing, and associated demolition and installation services. The project encompasses six potential scopes of work: a base bid for elevator modernization and five alternate options involving modernization and interior cab finish upgrades for Passenger Elevators #1-4.

The cost summary sheet presents a detailed breakdown of proposed costs across multiple Masterformat 2018 divisions, with current pricing indicated as $0.00 for both the base bid and alternate options. The University reserves the right to accept or reject any proposals or alternates in whole or part. The document provides a structured format for contractors to specify labor and material costs across general requirements, carpentry, conveying equipment, plumbing, HVAC, and electrical divisions, with a section for miscellaneous overhead and profit expenses. The solicitation appears to be seeking comprehensive elevator modernization services with flexibility for partial or complete project implementation through the alternate bid options.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Cost Summary Sheet - RFP202590000654

Contractor Date

Solicitation Name and Number

The University will utilize this Cost Summary Sheet for the solicitation. Proposers are to complete the pricing response, either providing a price for the work or specifying "NO PRICE". The University reserves the right to accept or reject any or all Proposals and/or Alternates, in whole or in part, in its sole discretion.

Provide a breakdown of the solicitation costs per MASTERFORMAT (2018); in the event a category does not contain costs, mark Zero ($0.00). The proposed costs per divisions utilized should total the TOTAL BASE PRICE. Included under these divisions are some of the items that make up costing per Masterformat 2018; place prices where most applicable.

Division Section Title Proposed Cost

General Requirements
Division 1Summary, Admin Requirements, Quality Requirements, Temporary Facilities and Controls, Product Requirements, Execution and Closeout Requirements, Performance RequirementsLabor

Materials

Carpentry
Division 6Misc. carpentry and general trades for work in machine room. Select demolition.Labor

Materials

Conveying Equipment
Division 14Elevator modernization including demolition of existing elevator equipment. Repairs to hoistway frames and painting.Labor

Materials

Plumbing
Division 22Sump pumps and associated piping in elevator pits.Labor

Materials

HVAC
Division 23HVAC work associated with the elevator machine roomLabor

Materials

Electrical
Division 26All electrical work associated with the elevator modernizationLabor

Materials

Miscellaneous
Overhead and Profit, B&O Tax, etc.$0.00

Total Base Bid: $0.00

Alternate(s) Proposed Cost

Add Alternate 1: Work of this alternate includes but is not limited to the modernization of Passenger Elevator #3. $0.00

Add Alternate 2: Work of this alternate includes but is not limited to the modernization of Passenger Elevator #4. $0.00

Add Alternate 3: New interior cab finishes and new lighting for Passenger Elevator #1. $0.00

Add Alternate 4: New interior cab finishes and new lighting for Passenger Elevator #2. $0.00

Add Alternate 5: New interior cab finishes and new lighting for Passenger Elevator #3. $0.00

Add Alternate 6: New interior cab finishes and new lighting for Passenger Elevator #4. $0.00

Signatory Date

Printed Name Title

&"Times New Roman,Regular"&12Exhibit B

&"Times New Roman,Regular"Divisions Form, V1.2 &"Times New Roman,Regular"February 2025

Sheet2

File details come from the government source that posted it. Updated .