Exhibit B - Cost Summary.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- PSC - Church McKee Arts Center Stage Rigging
- Solicitation number
- RFP202690000659
- Issued by
- Mingo County, West Virginia
About this file
This document is an Exhibit B Cost Summary spreadsheet for a project at Potomac State College in West Virginia involving stage rigging system replacement. The solicitation requires proposers to provide a detailed cost breakdown using Masterformat 2018 divisions, with the specific project involving the removal and disposal of an existing rigging system and installation of a new system with equivalent performance and capacity at the Church McKee Arts Center Auditorium. The university reserves the right to accept or reject any proposals or alternates at its sole discretion.
The cost summary template requires proposers to itemize costs across multiple divisions, including General Requirements (Division 1), Existing Conditions (Division 2), and Special Construction (Division 13), with specific line items for labor, materials, and total costs. The proposal requires breaking down expenses for demolition of the existing rigging system and installation of the new system, with a total base price to be calculated. No specific pricing, funding sources, or budget amounts are explicitly stated in this document, and the final total base price is shown as $0.00, indicating this is a template to be completed by the proposing contractor.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Exhibit B |
| Price Summary Sheet |
Contractor Date
Solicitation Name and Number
The University will utilize this Price Summary Sheet for the solicitations. Proposers are to complete the Proposal response, either providing a cost for the work or specifying "NO PRICE". The University reserves the right to accept or reject any or all Proposals and/or Alternates, in whole or in part, in its sole discretion.
Provide a breakdown of the solicitation costs per MASTERFORMAT (2018); in the event a category does not contain costs, mark Zero ($0.00). The proposed costs per divisions utilized should total the TOTAL BASE PRICE. Included under these divisions are some of the items that make up costing per Masterformat 2018; place costs where most applicable.
Division Section Title Proposed Cost
| General Requirements | ||
| Division 1 | Summary, Admin Requirements, Quality Requirements, Temporary Facilities and Controls, Product Requirements, Execution and Closeout Requirements, Performance Requirements | Labor |
Materials
| Existing Conditions | ||
| Division 2 | Demolition of existing rigging system | Labor |
Materials
| Special Construction | ||
| Division 13 | New rigging system and installation. | Labor |
Materials
| Miscellaneous | |
| Overhead and Profit, etc. | $0.00 |
Total Base Price: $0.00
Signatory Date
Printed Name Title
Sheet2
File details come from the government source that posted it. Updated .