This is a Cost Proposal Template for the City of Johns Creek's on-call pipe lining services contract (RFP 26-187). The contract encompasses three one-year terms beginning October 1, 2026, through September 30, 2029, with provisions for Terms 4-5 to be presented 120 days before the expiration of Term 3. The scope of work includes multiple pipe lining methodologies: CIPP (Cured-In-Place Pipe) lining for pipes ranging from 12 to 48 inches in diameter with varying depths and sediment conditions, Styrene Free-CIPP lining options, Spin Cast lining for pipes 30 to 72 inches in diameter, and related infrastructure work including precast and cast-in-place concrete headwalls, rubble masonry headwalls, and miscellaneous construction items. All lining services include pre and post television inspection, typical point repairs, and cleaning services, with pricing differentiated based on pipe diameter, wall thickness, and debris conditions.

Pricing is structured as unit prices for the three contract terms, with bidders required to submit separate unit pricing for each term. All unit prices must include mobilization, labor, equipment, and materials necessary for full project completion. Lump sum items such as traffic control, erosion and sediment control, landscaping, site preparation, tree removal, and specialty services including ground penetrating radar and pressure grouting will be determined on a project-by-project basis and submitted with proposals prior to each purchase order. Bidders must submit pricing for 79 line items covering various pipe diameters, material types, and ancillary services, with blank spaces provided for contractor completion and authorization signatures.

View the file

Other files

File Type Posted
26_187 Bid Packet.pdf PDF
26_187 Sample Contract.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Terms 1-3 (term 4-5 shall be presented 120 days expiration term 3) Term 1 (10/1/26-9/30/27)

ITEM # Description Unit Unit Price Unit Price Unit Price Lining Requirements

Inversion Setup 1 Inversion Setup Charge 15-36" CIPP EA 2 Inversion Setup Charge 42-48" CIPP EA

CIPP (12' or less in depth) Includes Pre & Post TV & typical point repairs during lining

Includes Cleaning (less than 25% full) 3 12" - 7.5 mm (.2953") LF 4 15" - 7.5mm (.2953") LF 5 18" - 8.0mm (.315") LF 6 21" - 10.0mm (.3937") LF 7 24" - 10.0mm (.3937") LF 8 30" - 12.5mm (.4921") LF 9 36" - 16.0mm (.6299") LF

10 42" - 18.0mm (.7087") LF 11 48" - 21.0mm (.8268") LF

CIPP (12' or less in depth) Includes Pre & Post TV & typical point repairs during lining

Includes Cleaning (greater than 25% full) 12 12" - 7.5 mm (.2953") LF 13 15" - 7.5mm (.2953") LF 14 18" - 8.0mm (.315") LF 15 21" - 10.0mm (.3937") LF 16 24" - 10.0mm (.3937") LF 17 30" - 12.5mm (.4921") LF 18 36" - 16.0mm (.6299") LF 19 42" - 18.0mm (.7087") LF 20 48" - 21.0mm (.8268") LF

CITY OF JOHNS CREEK ON-CALL PIPE LINING RATE SHEET

RFP 26-187

Term 2 (10/1/27-9/30/28) Term 3 (10/1/28-9/30/29

Neil.Trust Typewriter Firm Name:______________________________ page 1 of 4

Styrene Free-CIPP (12' or less depth)

Includes Pre & Post TV & typical point repairs during lining Term 1 (10/1/26-9/30/27)

Includes Cleaning (less than 25% full) Unit Price Unit Price Unit Price 21 12" Pipe - 7.5mm LF 22 15" Pipe - 7.5mm LF 23 18" Pipe - 8.0mm LF 24 21" Pipe - 10.0mm LF 25 24" Pipe - 12.5mm LF 26 30" Pipe - 12.5mm LF 27 36" Pipe - 16.0mm LF 28 42" Pipe -18.0mm LF 29 48" Pipe - 21.0mm LF

Styrene Free-CIPP (12' or less depth)

Includes Pre & Post TV & typical point repairs during lining Term 1 (10/1/26-9/30/27)

Includes Cleaning (greater than 25% full) Unit Price Unit Price Unit Price 30 12" Pipe - 7.5mm LF 31 15" Pipe - 7.5mm LF 32 18" Pipe - 8.0mm LF 33 21" Pipe - 10.0mm LF 34 24" Pipe - 12.5mm LF 35 30" Pipe - 12.5mm LF 36 36" Pipe - 16.0mm LF 37 42" Pipe -18.0mm LF 38 48" Pipe - 21.0mm LF

Spin Cast Lining

Includes Pre & Post TV & typical point repairs during lining Term 1 (10/1/26-9/30/27)

Includes Cleaning (less than 25% full) Unit Price Unit Price Unit Price 39 30" Centrifugal Spin- 1.5 Thickness LF 40 36" Centrifugal Spin - 1.5 Thickness LF 41 42" Centrifugal Spin - 1.5 Thickness LF 42 48" Centrifugal Spin - 1.5 Thickness LF 43 54" Centrifugal Spin - 1.5 Thickness LF 44 60" Centrifugal Spin - 1.5 Thickness LF 45 66" Centrifugal Spin - 1.5 Thickness LF 46 72" Centrifugal Spin - 1.5 Thickness LF

Term 3 (10/1/28-9/30/29)Term 2 (10/1/27-9/30/28

Term 2 (10/1/27-9/30/28) Term 3 (10/1/28-9/30/29)

Term 2 (10/1/27-9/30/28) Term 3 (10/1/28-9/30/29)

Neil.Trust

Firm Name:______________________________ page 2 of 4

Spin Cast Lining

Includes Pre & Post TV & typical point repairs during lining Term 1 (10/1/26-9/30/27)

Includes Cleaning (greater than 25% full) Unit Price Unit Price Unit Price

47 30" Centrifugal Spin- 1.5 Thickness LF

48 36" Centrifugal Spin - 1.5 Thickness LF 49 42" Centrifugal Spin - 1.5 Thickness LF 50 48" Centrifugal Spin - 1.5 Thickness LF 51 54" Centrifugal Spin - 1.5 Thickness LF 52 60" Centrifugal Spin - 1.5 Thickness LF 53 66" Centrifugal Spin - 1.5 Thickness LF 54 72" Centrifugal Spin - 1.5 Thickness LF

Spin Cast Lining for Drainage Boxes Unit Price Unit Price Unit Price 55 48" Drainage box VF 56 60" Drainage box VF 57 72" Drainage box VF

Precast Headwalls (per GDOT Std ) Unit Price Unit Price Unit Price 58 Precast Headwall for 18" Pipe EA 59 Precast Headwall for 24" Pipe EA 60 Precast Headwall for 30" Pipe EA 61 Precast Headwall for 36" Pipe EA 62 Precast Headwall for 42" Pipe EA 63 Precast Headwall for 48" Pipe EA

Cast-In Place Concrete Headwall Unit Price Unit Price Unit Price 64 Cast-n-Place Conc HW-GDOT Det 1125 CY

Rubble Masonry HW Unit Price Unit Price Unit Price 65 Rubble Headwall for 18" Pipe EA 66 Rubble Headwall for 24" Pipe EA 67 Rubble Headwall for 30" Pipe EA 68 Rubble Headwall for 36" Pipe EA

Term 2 (10/1/27-9/30/28) Term 3 (10/1/28-9/30/29)

Neil.Trust

Firm Name:______________________________ page 3 of 4

Miscellaneous Items Unit Price Unit Price Unit Price 69 Stone #57 Ton 70 Surge Stone Ton 71 No.3's and 4's Stone Ton 72 Reset Existing Headwall EA 73 3000psi Concrete CY 74 Flowable Fill CY

Site Preparation Unit Price Unit Price Unit Price 75 Traffic Control LS project-by-project basis project-by-project basis project-by-project basis

76 Erosion and Sediment Control LS project-by-project basis project-by-project basis project-by-project basis

Landscaping and Restoration Unit Price Unit Price Unit Price 77 Tree Removal LS project-by-project basis project-by-project basis project-by-project basis

78 Clearing and Grubbing SY 79 Sod Restoration SF

Firm Name: _______________________________________________________

Sign Authorized Rep:________________________________Print Name:_____________________________ Title:___________________________________Date:_______________________

NOTES

All unit prices shall include but not be limited to all mobilization, labor, equipment and materials necessary to perform the work. In addition, unit prices for pipe lining shall include typical point repairs, pre and post CCTV, and cleaning (less than 25% full & greater than 25%).

Lump sum items will be determined on a project by project basis and include but not be limited to erosion control, landscaping, traffic control, special internal and external point repairs, pumping operations, ground penetrating radar and pressure grouting. These items will be included with proposals prior to each purchase order for lining projects.

Neil.Trust