This is a Request for Proposals (RFP) issued by the City of Johns Creek, Georgia Purchasing Division for On-Call Storm Pipe Lining Services. The City seeks qualified contractors to provide storm pipe rehabilitation services including Cured-In-Place Pipe (CIPP) lining, spincast lining, pipe inspection and cleaning, structure rehabilitation or replacement, traffic control, erosion control, landscaping, and permanent grassing. The City has identified over 200 pipes requiring repair, with additional pipes added annually based on inspection results. The RFP was released June 8, 2026, with a non-mandatory pre-bid conference scheduled for June 17, 2026 at 10:00 AM via Microsoft Teams. The deadline for written questions is June 26, 2026 at 5:00 PM via BidNet, with formal answers provided within three business days. Proposals are due July 7, 2026 at 2:00 PM Eastern Time, submitted both electronically through BidNet and as hard copies to City Hall. The contract term is one year with four optional one-year renewal periods, for a maximum of five years total. Anticipated contract award is scheduled for end of July 2026, with a contract Notice to Proceed between August 2026 and October 1 for the fiscal year beginning October 1.
Cost proposals must be submitted in a sealed envelope separate from technical proposals. Contractors shall provide rates for each line item on the provided cost proposal form and must submit pricing for three consecutive one-year terms, with Term 2 and Term 3 quotes incorporating annual price escalators. Rates for Years 4 and 5 are subject to negotiation commencing 120 days before Term 3 expiration. No minimum guarantee of work is specified. The contract requires contractors to maintain comprehensive general liability insurance of $1,000,000 per person and $2,000,000 per occurrence, statutory worker's compensation insurance, and professional liability insurance of $2,000,000 per occurrence. A 10% retainage will be held from monthly invoices until project completion and final acceptance. Contractors must comply with Georgia Department of Transportation specifications, OSHA standards, and applicable local ordinances. Subcontractors may perform no more than 49% of the work and require City approval. Liquidated damages of $200 per calendar day apply for work not completed by the specified deadline. Contractors are responsible for all labor, materials, equipment, permits, licenses, and site restoration at their own expense.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit B Cost Proposal Template.pdf | ||
| 26_187 Sample Contract.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
RFP Number:
26-187
RFP Title:
On Call Storm Pipe Lining Services
RFP Due Date and Time:
Local Time: July 7, 2026, 2:00pm ET
Number of Pages: 43
ISSUING DEPARTMENT INFORMATION
Issue Date:
June 8, 2026
City of Johns Creek Purchasing Division 11360 Lakefield Drive Johns Creek, Ga. 30097
Phone: 678-512-3233 Fax: 678-512-3286
Website: www.johnscreekga.gov
INSTRUCTIONS TO OFFERORS
Submitting Request for Proposal (RFP):
All bid submissions shall be submitted electronically and with hard copies five (5) - technical proposal,
(1) copy required forms, (1) copy in separate sealed envelope-cost proposal.
All questions must be submitted via BidNet no later than 5:00 pm on June 26, 2026. Answers to questions & Addendums will be posted on BidNet.
Pre-Bid Conference (optional attendance) will take place 10:00AM on June 17, 2026, via on-line Microsoft Teams. Details of registering are in Appendix A of the RFP.
Instructions for registering for BidNet can be found in special instructions:
Envelope #1 (2 PDF’s for electronic submission) 1 PDF: required RFP forms (scan all into 1 PDF). W9, E-verify, 50-36-1, submittal, cover page, drug free workplace etc...
1 PDF for Technical Proposal: Defined in Section 3.0 Qualifications, Experience, Approach, References, Staff, (proposal defines RFP), etc.
No cost proposals shall be submitted in envelope #1.
Envelope #2 (1 PDF) for electronic submission:
1 PDF with Cost Proposal
RFP Due & received by: July 7, 2026, 2:00 PM ET Both hard copies to City Hall & electronically in BidNet.
Special Instructions:
Register for BidNet at:
https://johnscreekga.gov/departments/finance/bids-rfps/ click: register and view quote/RFP opportunities
IMPORTANT: SEE STANDARD TERMS AND CONDITIONS
OFFERORS MUST COMPLETE THE FOLLOWING
Offeror Name (Firm)/Address:
Authorized Offeror Signatory:
(Please sign in ink) Offeror Phone Number: Offeror Print Name:
Offeror Federal I.D. Number: Offeror E-mail:
OFFEROR’S RFP CHECKLIST
The 10 Most Critical Things to Keep in Mind When Responding to an RFP for the City of Johns
Creek
1. _______ Read the entire document. Note critical items such as mandatory requirements; supplies/services required; submittal dates; number of copies required for submittal;
funding amount and source; contract requirements (i.e., contract performance security, insurance requirements, performance and/or reporting requirements, etc.).
2. _______ Note the procurement officer's name, address, phone numbers and e-mail address. This is the only person you are allowed to communicate with regarding the RFP and is an excellent source of information for any questions you may have.
3. _______ Attend the pre-bid, proposal conference if one is offered. These conferences provide an opportunity to ask clarifying questions, obtain a better understanding of the project, or to notify the City of any ambiguities, inconsistencies, or errors in the RFP.
4. _______ Take advantage of the “question and answer” period. Submit your questions online in BidNet by the due date listed in the Schedule of Events and view the answers given in the formal “addenda” issued for the RFP. All addenda issued for an RFP are available online in BidNet and will include all questions asked and answered concerning the RFP.
5. _______ Follow the format required in the RFP when preparing your response.
Provide point-by-point responses to all sections in a clear and concise manner.
6. _______ Provide complete answers/descriptions. Read and answer all questions and requirements. Don’t assume the City or evaluation committee will know what your company’s capabilities are or what items/services you can provide, even if you have previously contracted with the City. The Proposals is evaluated based solely on the information and materials provided in your response.
7. _______ Use the forms provided, i.e., required documents, RFP cover page, submittal page, Everify, 50-36-1 form, W9, Drug Free Workplace, COI example, etc.
8. _______ Check for RFP addenda. Before submitting your response, check online in BidNet for any addenda the City has issued. Submission of Bid acknowledges receipt of addendums however, recommended to include with bid submission signed copies.
9. _______ Review and read the RFP document again to make sure that you have addressed all requirements. Your original response and the requested copies must be identical and be complete. The copies are provided to the evaluation committee members and will be used to score your response.
10. _______ Submit your response on time. Note all the dates and times listed in the
Schedule of Events and within the document, and be sure to submit all required items on time.
Late proposals responses are never accepted. Don’t wait till last minute to upload electronically in
BidNet.
This checklist is provided for assistance only and should not be submitted with Offeror’s Response
CITY OF JOHNS CREEK
RFP 26-187
REQUEST FOR PROPOSALS LETTER
We propose to furnish and deliver any and all of the deliverables and services named in the attached Request for Proposals (RFP) for which prices have been set. If price or prices are required and offered herein shall apply for the period of time stated in the RFP.
It is understood and agreed that this proposal constitutes an offer, which when accepted in writing by the Purchasing Division, City of Johns Creek, and subject to the terms and conditions of such acceptance, will constitute a valid and binding contract between the undersigned and the City of
Johns Creek.
It is understood and agreed that we have read the City’s specifications shown or referenced in the
RFP and that this proposal is made in accordance with the provisions of such specifications. By our written signature on this proposal, we guarantee and certify that all items included in this proposal meet or exceed any and all such City specifications. We further agree, if awarded a contract, to deliver goods and services which meet or exceed the specifications. The City of Johns
Creek reserves the right to reject any or all submittals, waive technicalities and informalities, and to make an award in the best interest of the City.
It is understood and agreed that this proposal shall be valid and held open for a period of One
Hundred (120) days from Request for Proposals opening date.
PROPOSAL SIGNATURE AND CERTIFICATION
(Offeror to sign and return with Request for Proposals)
I certify that this proposals is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of State and Federal Law and can result in fines, prison sentences and civil damage awards. I agree to abide by all conditions of the Request for Proposals and certify that I am authorized to sign this proposal for the Offeror. I further certify that the provisions of the Official
Code of Georgia Annotated, Sections 45-10-20 et. seq., have not been violated and will not be violated in any respect.
Authorized Signature______________________________Date_______________________
Print/Type Name____________________________________________________________
Print/Type Company Name Here_______________________________________________
CITY OF JOHNS CREEK
RFP 26-187
DISCLOSURE FORM
This form is for disclosure of campaign contributions and family member relations with City of Johns Creek officials/employees.
Please complete this form and return as part of your Quotes/RFP package when it is submitted.
Name of Offeror __________________________________________________
Name and the official position of the Johns Creek Official to whom the campaign contribution was made (Please use a separate form for each official to whom a contribution has been made in the past two (2) years.) Offeror(s) will list N/A-Not Applicable to the fields below, if applies:
List the dollar amount/value and description of each campaign contribution made over the past two (2) years by the Applicant/Opponent to the named Johns Creek Official.
Amount/Value Description
Please list any family member that is currently (or has been employed within the last 12 months) by the City of Johns Creek and your relation:
(Please fill out and still mark N/A if non-applicable)
TABLE OF CONTENTS
ISSUING DEPARTMENT INFORMATION
INSTRUCTIONS TO OFFERORS
IMPORTANT: SEE STANDARD TERMS AND CONDITIONS
OFFERORS MUST COMPLETE THE FOLLOWING
1.1 PURPOSE OF PROCUREMENT
1.1.1 GENERAL CONDITIONS
1.2 ELIGIBILITY/QUALIFICATIONS
1.2.1 PROPOSAL CERTIFICATION
1.2.2 OFFERORS CONFERENCE
1.3 SCHEDULE OF EVENTS
1.4 RESTRICTIONS ON COMMUNICATIONS WITH STAFF
1.5 DEFINITION OF TERMS
1.6 DESCRIPTION OF REQUIREMENTS
1.6.1 RESULTING CONTRACT
1.6.2 MANDATORY REQUIREMENTS
1.6.3 UNDERSTANDING OF SPECIFICATIONS AND REQUIREMENTS
1.6.5 OFFEROR’S SIGNATURE
1.7 SUBMITTING A PROPOSAL
1.7.1 ORGANIZATION OF PROPOSALS
1.7.2 FAILURE TO COMPLY WITH INSTRUCTION
1.7.5 LATE PROPOSALS
1.8 REQUIRED REVIEW
1.8.1 REVIEW RFP
1.8.2 FORM OF QUESTIONS
1.8.3 CITY’S ANSWERS
1.8.4 STANDARD TERMS AND CONDITIONS/STANDARD CONTRACT
1.8.5 PROJECT OVERSIGHT AND STAFFING
2.1 AUTHORITY
2.2 OFFEROR COMPETITION
2.3 RECEIPT OF PROPOSALS AND PUBLIC INSPECTION
2.3.1 PUBLIC INFORMATION
2.3.2 PROCUREMENT OFFICER REVIEW OF PROPOSALS
2.4 CLASSIFICATION AND EVALUATION OF PROPOSALS
2.4.1 INITIAL CLASSIFICATION OF PROPOSAL AS RESPONSIVE OR NON-RESPONSIVE
2.4.2 DETERMINATION OF RESPONSIBILITY
2.4.3 EVALUATION OF PROPOSALS
2.4.4 COMPLETENESS OF PROPOSALS
2.4.5 EVALUATION COMMITTEE RECOMMENDATION
2.5 CITY’S RIGHTS RESERVED
3.0 RFP MANDATORY OFFEROR REQUIREMENTS
3.1 BACKGROUND INFORMATION
3.1.1 PROJECT INFORMATION
3.2 PROJECT OBJECTIVE
3.4 SCOPE OF SERVICES
3.4.1 RFP / PROJECT GENERAL INFORMATION
3.5 PROJECT UNDERSTANDING & APPROACH -30 POINTS MAX
3.6 EXPERIENCE / QUALIFICATION OF PROJECT MANAGER -20 POINTS MAX
3.6.1 EXPERIENCE / QUALIFICATIONS OF PROJECT TEAM OF SIMILAR SCOPE – 20 POINTS MAX .22
3.7 REFERENCES (SIMILAR SCOPE) – 10 POINTS MAX
3.8 COST PROPOSALS – 20 POINTS MAX
3.9 BID EVALUATION
4.0 PROPOSAL SUBMISSION AND EVALUATION
4.1 PROCESS FOR SUBMITTING PROPOSALS
4.1.1 PREPARATION OF PROPOSALS
4.1.2 PACKAGING OF PROPOSALS
4.1.3 SUBMISSION OF PROPOSALS
4.2 EVALUATION PROCESS
4.2.1 ADMINISTRATIVE REVIEW
4.2.2 MANDATORY REQUIREMENTS REVIEW
4.2.3 TECHNICAL PROPOSALS EVALUATION
4.2.4 INTERVIEWS
4.3 REJECTION OF PROPOSALS/CANCELLATION OF RFP
4.4 CITY’S RIGHT TO INVESTIGATE AND REJECT
4.4.1 OFFEROR INFORMATIONAL REQUIREMENTS
5.0 TERMS AND CONDITIONS
5.1 RFP AMENDMENTS
5.2 PROPOSAL WITHDRAWAL
5.3 COST FOR PREPARING PROPOSALS
5.4 CONTRACT
5.4.1 CONTRACT TERM
5.5 CONFLICT OF INTEREST
5.6 MINORITY BUSINESS POLICY
5.7 ADA GUIDELINES
5.8 COMPLIANCE WITH LAWS
5.9 GOVERNING TERMS
5.10 INDEMNIFICATION
5.11 CORRECTIONS/CREDITS
5.12 INSURANCE
5.13 CANCELLATION
5.14 INDEPENDENT CONTRACTOR
5.15 NO ASSIGNMENT
5.16 AUDIT
5.17 ATTORNEY’S FEES
5.18 MISCELLANEOUS
APPENDIX A
SCHEDULE OF EVENTS
APPENDIX B COST PROPOSAL
APPENDIX C REQUIRED FORMS
APPENDIX D ADDITIONAL SPECIFICATIONS
APPENDIX E RELEVANT MATERIALS
1.0 INTRODUCTION
1.1 Purpose of Procurement
The City of Johns Creek, Georgia (City) requests proposals from qualified and experienced contractors for On-Call Storm Pipe Lining Services. The City is seeking contractors with work experience in the following, but not limited to, lining storm pipes, inspection and cleaning of pipe, structure rehabilitation and/or reconstruction, rip-rap placement, erosion control measures, landscaping and permanent grassing, and traffic control. The work will be located in various areas throughout the City of Johns Creek, Georgia.
1.1.1 General Conditions
The contractor shall execute the work according to and meet the requirements of the following:
• Georgia Department of Transportation (GDOT) Specifications, Standards, and Details;
• The Contract Documents including but not limited to the scope of work and specifications;
• City of Johns Creek ordinances and regulations;
• OSHA standards and guidelines;
• Any other applicable codes, laws and regulations including but not limited to Section 45-
• 10-20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil
Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990
The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work and will be responsible for all labor/repair associated with the equipment when issued a project Task Order.
In case of discrepancy between the unit price and the total price on the completed Bid Schedule, the unit price will prevail and the total price will be corrected.
The Contractor is responsible for inspecting the jobsite prior to submitting a Task Order quote. No change orders will be issued for differing site conditions. In case of discrepancies between the plans/scope/contract and specifications, the most stringent specification/detail prevails.
The successful bidder must have verifiable experience at construction of similar projects in accordance with these specifications. Bidder shall provide references for similar type projects with their firm’s proposal submission.
Invoices are required at the end of each month for work completed that month. Retainage in the amount of 10% of the total amount due on each monthly invoice will be held by the City until project completion and acceptance. The City will inspect the work as it progresses.
A pipe and structure shall be deemed complete when it is restored from corrosion, leaks or cracks and is void of all sedimentation, vegetation, and other debris that may obstruct flow of water.
1.2 Eligibility/Qualifications
To be eligible for award of a contract in response to this solicitation the Offeror should demonstrate that they, or the principals assigned to the contract, have successfully completed services, as specified in the Technical Specifications/Scope of Services section of this solicitation, and are normally and routinely engaged in performing such services. In addition, the Contractor must have no conflict of interest with regard to any other work performed by the Contractor for the City of
Johns Creek.
Offeror should provide the City with credentials supporting their past experience, expertise, including organization, amount of fleet, and labor/manpower, to insure satisfactory execution of the services contained in the RFP. Offeror should provide a list of references with particular emphasis on other governmental agencies, and include clients and past clients within the
Atlanta Metropolitan area, and the number of years in business providing these services (see
Mandatory Response Section 3.7 .
1.2.1 Proposal Certification
Pursuant to the provisions of the Official Code of Georgia Annotated 50-5-67(a), the City of Johns
Creek certifies the use of competitive sealed bidding will not be practical or advantageous to the
City in completing the acquisition described in this RFP. All Proposals submitted pursuant to this request will be made in accordance with the provisions of this RFP.
1.2.2 Offerors Conference
There will be a voluntary attendance Offerors conference scheduled for the date and time listed in the Schedule of Events online at Microsoft Teams. Interested individuals/firms can register by emailing interest to purchasing@johnscreekga.gov .
1.3 Schedule of Events
See APPENDIX A for the detail Schedule of Events.
1.4 Restrictions on Communications with Staff
All questions about this RFP must be submitted online through BidNet in the following format:
1. Question
Citation of relevant section of the RFP
2. Question
Citation of relevant section of the RFP
Questions must be submitted online only through the electronic bidding platform. Go to the city website purchasing page https://johnscreekga.gov/departments/finance/bids-rfps/ and follow the links to the Georgia Purchasing Group by BidNet. Questions must include the company name and the referenced RFP section.
Additional assistance is available by emailing the City of Johns Creek Purchasing Department at:
purchasing@johnscreekga.gov .
From the issue date of this RFP until a Offeror(s) is selected and the selection is announced, Offerors are not allowed to communicate for any reason with any City staff, elected officials, or other contractors or sub-contractors except through the Issuing Officer named herein, or during the Offeror’s conference, or as provided by existing work agreement(s). The City reserves the right mailto:purchasing@johnscreekga.gov https://johnscreekga.gov/departments/finance/bids-rfps/ mailto:purchasing@johnscreekga.gov to reject the Proposal of any Offeror violating this provision. All questions concerning this RFP must be submitted electronically online via BidNet. No questions other than online will be accepted. No response other than online will be binding upon the City.
1.5 Definition of Terms
OCGA - Official Code of Georgia Annotated (State Statute)
Offeror - Respondent to this Request for Proposals
Contractor – Offeror(s) awarded contract with City
RFP - Request for Proposals
1.6 Description of Requirements
The City of Johns Creek has established certain requirements with respect to Request for Proposals to be submitted by Offerors.
Whenever the terms "shall", "must", "will", or "is required" are used in the RFP, the specification being referred to is a mandatory requirement of this RFP. Failure to meet any mandatory requirement will cause rejection of Offeror's proposal. Whenever the terms "can", "may", or
"should" are used in the RFP, the specification being referred to is a desirable and failure to provide any items so termed may not be cause for rejection, however, may cause a reduction in score awarded.
1.6.1 Resulting Contract
This RFP and any addenda, the Offeror’s RFP response, including any amendments, a best and final offer, and any clarification question responses shall be included in any resulting contract. The
City’s contract contains the contract terms and conditions which will form the basis of any contract between the City and the highest scoring Offeror. In the event of a dispute as to the duties and responsibilities of the parties under this contract, the contract, along with any attachments prepared by the City, will govern in the same order of precedence as listed in the contract.
1.6.2 Mandatory Requirements
To be eligible for consideration, an Offeror must meet the intent of all mandatory requirements.
The City will determine whether an Offeror’s RFP response complies with the intent of the requirements. RFP responses that do not meet the full intent of all requirements listed in this RFP may be subject to point reductions during the evaluation process or may be deemed non-responsive.
1.6.3 Understanding of Specifications and Requirements
By submitting a response to this RFP, Offeror agrees to an understanding of and compliance with the specifications and requirements described in this RFP.
1.6.4 Prime Contractor/Subcontractors
Offeror(s) proposals selected as most advantageous to the City based on evaluation factors set forth in the RFP shall be the prime contractor if a contract is awarded and shall be responsible, in total, for all work of any subcontractors. All subcontractors, if any, must be listed in the proposal and perform no more than 49% of work. The City reserves the right to approve all subcontractors. The
Contractor shall be responsible to the City for the acts and omissions of all subcontractors or agents and of persons directly or indirectly employed by such subcontractors, and for the acts and omissions of persons employed directly by the Contractor. Further, nothing contained within this document or any contract documents created as a result of any contract awards derived from this
RFP shall create any contractual relationships between any subcontractor and the City.
1.6.5 Offeror’s Signature
The Proposal must be signed in ink by an individual authorized to legally bind the business submitting the Proposal. The Offeror’s signature on a Proposal in response to this RFP guarantees that the offer has been established without collusion and without effort to preclude the City of
Johns Creek from obtaining the best possible supply or service. Proof of authority of the person signing the RFP response must be furnished upon request.
1.7 Submitting a Proposal
1.7.1 Organization of Proposals
Offerors must organize their Proposals (RFP) into sections that follow the format of this RFP, separating each section example: 3.5 Supplier Qualifications / Experience. A point-by-point response to all numbered sections, subsections, and appendices is required. If no explanation or clarification is required in the Offeror’s response to a specific subsection, the Offeror shall indicate so in the point-by-point response or utilize a blanket response for the entire section with the following
Statement: “(Offeror’s Name)” understands and will comply.
1.7.2 Failure to Comply with Instruction
Offerors failing to comply with these instructions may be subject to point deductions. The City may also choose to not evaluate, may deem non-responsive, and/or may disqualify from further consideration any Proposals that do not follow this RFP format, are difficult to understand, are difficult to read, or are missing any requested information.
1.7.3 Copies Required and Deadline for Receipt of Proposals
Offerors must submit proposals both; hard copies (5) technical proposal, (1) copy required forms, and (1) copy sealed envelope of Fee proposal in person/mail to Johns Creek City Hall and electronically online through BidNet. Technical Proposals, all required documents, and any additional bid documents must be delivered and uploaded into BidNet. RFP responses must be received prior to 2:00 pm, Tuesday July 7, 2026, both hard copies at City Hall and electronically through BidNet.
1.7.5 Late Proposals
Regardless of cause, late Proposals will not be accepted and will automatically be disqualified from further consideration. It shall be the Offeror’s sole risk to assure delivery at the receptionist's desk at the designated office by the designated time. Late Proposals will not be opened and may be returned to the Offeror at the expense of the Offeror or destroyed if requested.
1.8 Required Review
1.8.1 Review RFP
Offerors should carefully review the instructions; mandatory requirements, specifications, standard terms and conditions, and standard contract set out in this RFP and promptly notify the
City’s identified Procurement Officer in writing or via e-mail of any ambiguity, inconsistency, unduly restrictive specifications, or error which they discover upon examination of this RFP.
1.8.2 Form of Questions.
Offerors with questions or requiring clarification or interpretation of any section within this RFP must address these questions online only via BidNet on or before 5:00pm June 26, 2026. Each question must provide clear reference to the section, page, and item in question. Questions received after the deadline may not be considered.
1.8.3 City’s Answers.
The City will provide an official written answer within three (3) business days to all questions received by June 26, 2026, 5:00pm. The City's response will be by formal addendum published online via BidNet. Any other form of interpretation, correction, or change to this RFP will not be binding upon the City. Any formal written addendum will be published on BidNet. Offerors acknowledge receipt of addendums electronically with Proposal submissions and may also provide signed copies of addendums in their Proposal.
1.8.4 Standard Terms and Conditions/Standard Contract.
By submitting a response to this RFP, Offeror agrees to acceptance of the standard terms and conditions and standard contract as set out in Section 5.0 of this RFP. Much of the language included in the standard terms and conditions and standard contract reflects requirements of state law. Requests for exceptions to the standard terms and conditions, standard contract terms, or any added provisions must be submitted to the City’s identified procurement officer by the date for receipt of questions or with the Offeror’s RFP response and must be accompanied by an explanation of why the exception is being taken and what specific effect it will have on the
Offeror’s ability to respond to the RFP or perform the contract. The City reserves the right to address non-material, minor, insubstantial requests for exceptions with the highest scoring Offeror during contract negotiation. Any material, substantive, important exceptions requested and granted to the standard terms and conditions and standard contract language will be addressed in any formal addendum issued for this RFP and will apply to all Offerors submitting a response to this
RFP.
1.8.5 Project Oversight and Staffing
The successful Offeror(s) will report to the City’s Project Manager, (TBD at contract award and with each assigned project Task Order).
2.0 RFP STANDARD INFORMATION
2.1 Authority
This RFP is issued under the authority of the Purchasing Division of the City of Johns Creek. The
RFP process is a procurement option allowing the award to be based on stated evaluation criteria.
The RFP states the relative importance of all evaluation criteria. No other evaluation criteria, other than as outlined in the RFP, will be used.
2.2 Offeror Competition
The City encourages free and open competition among Offerors. Whenever possible, the City will design specifications, Request for Proposals, and conditions to accomplish this objective, consistent with the necessity to satisfy the City’s need to procure technically sound, cost-effective services and supplies.
2.3 Receipt of Proposals and Public Inspection
2.3.1 Public Information
All information received in response to this RFP, including copyrighted material, is deemed public information and will be made available for public viewing and copying after the time for receipt of Proposals has passed with the following four exceptions: (1) bona fide trade secrets meeting confidentiality requirements that have been properly marked, separated and documented; (2) matters involving individual safety as determined by the City of Johns Creek (3) any company financial information requested by the City of Johns Creek to determine Offeror(s) responsibility, unless prior written consent has been given by the Offeror; and (4) other constitutional protections.
2.3.2 Procurement Officer Review of Proposals.
Upon opening the Proposals received in response to this RFP, the procurement officer in charge of the solicitation will review the Proposals and separate out any information that meets the referenced exceptions in Section 2.3.1 above, providing the following conditions have been met:
• Confidential information is clearly marked and separated from the rest of the Proposal.
• The Proposal does not contain confidential material in the cost or price section.
• An affidavit from an Offeror’s legal counsel attesting to and explaining the validity of the trade secret claim is attached to each Proposal containing trade secrets.
Information separated out under this process will be available for review only by the procurement officer, the evaluation committee members, and limited other designees. Offerors must be prepared to pay all legal costs and fees associated with defending a claim for confidentiality in the event of a “right to know” (open records) request from another party.
2.4 Classification and Evaluation of Proposals
2.4.1 Initial Classification of Proposal as Responsive or Non-responsive
All Proposals will initially be classified as either “responsive” or “non-responsive”. Proposals may be found non-responsive any time during the evaluation process or contract negotiation if any of the required information is not provided; the submitted price is found to be excessive or inadequate as measured by criteria stated in the RFP; or the Proposal is not within the plans and specifications described and required in the RFP. If a Proposal is found to be non-responsive, it will not be considered further.
2.4.2 Determination of Responsibility
The Procurement Officer will determine whether an Offeror has met the standards of responsibility. Such a determination may be made at any time during the evaluation process and through contract negotiation if information surfaces that would result in a determination of non-responsibility. If an Offeror is found non-responsible, the determination must be in writing, made a part of the procurement file and mailed to the affected Offeror.
2.4.3 Evaluation of Proposals
All responsive Proposals will be evaluated based on stated evaluation criteria. In scoring against stated criteria, the City may consider such factors as accepted industry standards and a comparative evaluation of all other qualified RFP responses in terms of differing price, quality, and contractual factors. These scores will be used to determine the most advantageous offering to the City. Only those that meet the evaluation criteria will be considered as pre-qualified
2.4.4 Completeness of Proposals
Selection and award will be based on the Offeror’s Proposal and other items outlined in this RFP.
Submitted responses may not include references to information located elsewhere, such as Internet websites or libraries, unless specifically requested. Information or materials presented by Offerors outside the formal response or subsequent discussion/negotiation or “best and final offer,” if requested, will not be considered, will have no bearing on any award, and may result in the Offeror being disqualified from further consideration.
2.4.5 Evaluation Committee Recommendation
The Evaluation Committee will provide a written recommendation for contract award to the
Procurement Officer that contains the scores, justification and rationale for its decision.
The Procurement Officer will review the recommendation to ensure its compliance with the RFP process and criteria before concurring I the Evaluation Committee’s recommendation.
2.5 City’s Rights Reserved
Issuance of the RFP in no way constitutes a commitment by the City of Johns Creek to award and execute a contract. Upon a determination such actions would be in its best interest, the City, in its sole discretion, reserves the right to:
• Cancel or terminate this RFP;
• Reject any or all Proposals received in response to this RFP;
• Waive any undesirable, inconsequential, or inconsistent provisions of this RFP which would not have significant impact on any Proposals;
• Not award if it is in the best interest of the City not to proceed with contract execution; or
• If awarded, terminate any contract if the City determines adequate City funds are not available.
3.0 RFP MANDATORY OFFEROR REQUIREMENTS
This section identifies all mandatory requirements which must be present in the Proposal before further consideration will be given. Offeror must prepare and submit a response which references the page(s) of the Technical Response where satisfaction of the Mandatory Requirements is substantiated.
3.1 Background Information
The City of Johns Creek is located in the northeast corner of Fulton County; bounded on the south by the Chattahoochee River, on the east by Gwinnett County and the Chattahoochee, on the north by Forsyth County and on the west by the cities of Alpharetta and Roswell. Johns Creek has an approximate population of 84,000. Johns Creek is the 10th largest city in the state of Georgia, Marietta being the 11th largest. Johns Creek officially became a city on Dec. 1, 2006, when governance of the new city transferred from Fulton County to Johns Creek's elected officials and city government. Johns Creek's transition from six unincorporated northeast Fulton communities
- Newtown, Warsaw, Ocee, Shakerag, Autrey Mill and Johns Creek - to cityhood was initiated through the state legislative process and approval of House Bill 1321. Governor Sonny Purdue signed House Bill 1321 on March 29, 2006 and voters approved incorporation on July 18, 2006.
3.1.1 Project Information
The purpose of this RFP is to select a Contractor(s) to provide On Call Storm Pipe Lining Services.
The term of the contract will be for one (1) annual one (1) year term, with the option of four (4) additional one (1) year annual renewals for a total contract duration not to exceed, five (5) years.
The Contract price(s) and/or rates for the contract term will remain as offered in the Contractor’s
Cost Proposal and accepted/awarded by the City. Contractor’s must submit pricing for three(3) consecutive one-year terms for On-Call storm Pipe Lining Services by completing the Exhibit B
Proposal Form included in the bid packet. The City retains the sole option to renew the contract annually. Quotes for Term 2 and Term 3 must incorporate an annual price escalator. Rates for
Years 4 and 5 are subject to negotiation, which will commence 120 days prior to the expiration of
Term 3.
Contracted Contractor(s) who enter into a Task Order Agreement with the City shall collaborate with City staff per terms and conditions of the On-Call Storm Pipe Lining Services contract and the executed Task
Order Agreement.
3.2 Project Objective
Work required under this contract shall include furnishing materials, qualified labor, equipment, etc. for the repair of storm water drainage pipes. Work shall further include, but not be limited to, lining storm pipe using the Cured-In-Place Pipe (CIPP) or spincast methods, traffic control, TV inspection and cleaning of pipe, structure rehabilitation and/or replacement, rip-rap placement, erosion control measures, landscaping and permanent grassing, road and driveway restoration, and all materials necessary to install the above.
3.4 SCOPE OF SERVICES
All work under this contract shall be performed in accordance with Georgia Department of
Transportation (GDOT) Standard Specifications for Construction of Transportation Systems and other GDOT specifications as applicable. Adhere to all current State and Federal construction safety regulations, including OSHA regulations.
Work will be assigned to the awarded On-Call contractor(s) in the form of task orders. The contractor(s) shall commence the work with adequate force and equipment within ten (10) calendar days from receipt of a Notice to Proceed and shall continuously pursue the work without interruption to completion. Each task order will have a deadline consistent with the quantity and/or complexity of the work.
The city currently has identified over 200 pipes that need repair. Each year, additional pipes are added to this list based on the result of inspections and investigations. No minimum guarantee of work is inferred with these contracts. The city identifies its capital budget each year and prioritizes work plans based on the needs and demands of the entire city.
Lining Types: Offeror shall clearly state which lining type(s) they will be submitting for.
• Cured-in-Place Pipe (CIPP)– This process involves the installation of a resin-impregnated flexible tube that is either inverted or pulled into the original pipeline/conduit and expanded to fit tightly against said pipeline by the use of water or air pressure. The resin system shall then be cured by elevating the temperature of the fluid (water/air) used for the inflation to a sufficient enough level for the initiators in the resin to effect a thermosetting reaction.
• Spincasting – This process involves a centrifugally spray applied cementitious mortar that is wet cured.
Refer to APPENDIX B for Pipe Lining Specifications.
STORM PIPE ON-CALL
The intent of the City is to prequalify contractors to perform storm pipe lining and related services. The City will ask for pricing by project and upon award, the contractor will be responsible for the work.
SPECIAL PROVISIONS
All materials and workmanship associated with this contract shall meet current GDOT
Specifications and Standards, and Technical Specifications specified in Appendix B for construction materials, methods and procedures.
The following are special provisions prepared specifically for this contract and may be in conflict with parts of the standard specifications. If conflicts are evident the special provisions shall take precedence over the standard specifications.
PROSECUTION AND PROGRESS
Each project quoted will have required schedule as part of the task order, with a timeline determined by the City. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted.
The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by the completion date indicated above. Upon
Notice of Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City.
Normal workday for this project shall be 8:00 AM to 5:00 PM and the normal work week shall be Monday through Friday. The City will consider extended workdays or work weeks upon written request. No work will be allowed on City holidays (a complete list can be found on the
City website).
The Contractor shall not install lane closures or perform work or move equipment or materials on the traveled way that interferes with traffic flow between the hours of 6:00 am to 9:00 am and
4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays.
The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the Final Inspection. All repairs shall be completed by the Contractor at his expense prior to issuance of Final Acceptance.
10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City.
The City will retain 10% of the fee due the Contractor. The retainage will be paid as the final invoice after the project has been completed and accepted. All punch-list work must be complete before release of any retainage.
PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work.
EXISTING CONDITIONS / DEVIATION OF QUANTITIES
The City reserves the right to add, modify, or delete quantities. Contractor will be paid for actual in-place quantities completed and accepted for pay items listed in the Bid Schedule. Contractor will not be entitled to an adjustment of unit price on an item which increased or decreased from the original plan quantity.
All other work required by this ITB, plans, specs, standards, etc. but not specifically listed in the
Bid Schedule shall be considered “incidental work”. The bidder shall include the cost for all incidental work in the “Grading Complete” bid item. Contractor will notify the City in writing if quantities of contract items will exceed plan. At no time will contractor proceed with work outside the prescribed scope of services for which additional payment will be requested without the written authorization of the City.
All information given concerning existing conditions is for information purposes only. It is the
Contractors responsibility to inspect the project site to verify existing conditions prior to submitting their bid.
No adjustment will be made to the bid based on missing or inaccurate information on the plans/scope.
UTILITIES
Contractor shall be responsible for protecting all utilities and for coordinating any utility relocation necessary for the completion of the work.
Contractor shall be responsible for the adjusting to grade of existing utility structures that are incorporated into the work including but not limited to water valves and sewer cleanouts.
All known utility facilities are shown schematically on highway plans, and are not necessarily accurate in location as to plan or elevation. Utility facilities such as service lines or unknown facilities not shown on plans will not relieve the contractor of their responsibility under this requirement. "Existing utility facilities" means any utility that exists on the project in its original, relocated or newly installed position.
TRAFFIC CONTROL
The Contractor shall, at all times, conduct his work as to assure the least possible obstruction to the citizens. Work staging and operations shall be conducted in a manner to minimize interference with traffic flow thru existing parking areas. The safety and convenience of the general public and the protection of persons and property shall be provided for by the Contractor as specified in the State of Georgia, Department of Transportation Standard Specifications
Sections 104.05, 107.09 and 150.
The Contractor shall furnish, install and maintain all necessary and required barricades, signs and other traffic control devices in accordance with MUTCD and DOT specifications. Contractor shall take all necessary precautions for the protection of the workers and safety of the public.
All existing signs, markers and other traffic control devices removed or damaged during construction operations will be reinstalled or replaced at the Contractors expense. At no time will
Contractor remove regulatory signing which may cause a hazard to the public. The Contractor shall, within 24 hours place temporary pavement markings (paint or removable tape) to match existing pavement markings. No additional payment will be made for this work.
The ingress and egress includes entrances and exits via driveways at various properties, and access to the intersecting roads and streets. The Contractor shall maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project at all times, particularly during inclement weather, to insure that ingress and egress are safely provided when and where needed.
Two way traffic shall be maintained at all times, utilizing certified flaggers as necessary, unless otherwise specified or approved by the City. In the event of an emergency situation, the
Contractor shall provide access to emergency vehicles and/or emergency personnel through or around the construction area.
All personnel, equipment, and materials required for installing and maintaining traffic control shall be the responsibility of the contractor.
PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE
The Contractor shall be responsible for the preservation of all public and private property, crops, fish ponds, trees, monuments, highway signs and markers, fences, grassed and sodded areas, etc.
along and adjacent to the highway, road or street, and shall use every precaution necessary to prevent damage or injury thereto, unless the removal, alteration, or destruction of such property is provided for under the contract.
When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect or misconduct in the execution of the work, or in consequence of the non-execution thereof by the Contractor, he shall restore, at his/her own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise restoring as may be directed, or she/he shall make good such damage or injury in an acceptable manner. The Contractor shall correct all disturbed areas before retainage will be released.
SURVEY
The Contractor will be responsible for all staking necessary to complete construction activities.
All survey equipment, stakes and other materials needed will be considered incidental to construction operations and no additional compensation will be provided.
RIGHTS AND USE OF MATERIAL
Materials excavated within the project limits become the property of the Contractor. The
Contractor, at his/her discretion, may elect to incorporate any of the excavated material into his/her work provided and that it is suitable for the intended use. Materials identified to be removed and are unsuitable for the project will be removed from the site by the Contractor. All excavation, placement, hauling and grading of on-site material will be the Contractors responsibility.
GRADING COMPLETE
The Contractor shall be responsible for all grading work including all clearing, grubbing, hauling, grading, excavation, backfilling, and compaction tasks associated with the work. In addition to the above listed tasks, any costs associated with providing borrow material from a location not within the project limits will be the responsibility of the Contractor. Sub-grade excavation to required elevations, removal of excavated material if necessary, sub-grade compaction, fine grading, and back-filling excavated area with suitable material will be the responsibility of the Contractor. Also included in this work will be the removal and hauling off of existing construction materials, trees and any other items necessary to complete the work.
Finished grade of disturbed areas will match and blend with adjacent areas not disturbed by construction operations. The Contractor is also responsible for all ditch grading required to maintain drainage.
Tree save fence shall be installed and maintained by the contractor as indicated on the plans/scope.
EROSION/SEDIMENT CONTROL
It is the responsibility of the Contractor to follow all Federal, State and Local erosion and sediment control laws and specifications. This includes meeting all NPDES guidelines.
GRASSING COMPLETE
Contractor will be responsible for temporary and permanent grassing all disturbed areas. This work shall consist of ground preparation, furnishing and planting, seeding (including the cost of the seed), fertilizing, sprigging, mulching and watering of all areas disturbed due to construction operations. This work will comply with GDOT Section 700 – “Grassing.”
Finished grade of disturbed areas will match and blend with adjacent areas not disturbed by construction operations. In the event that areas are damaged prior to final project acceptance, the
Contractor will repair or replace as necessary.
COORDINATION
The Contractor shall keep the City updated on the construction schedule and daily work plans.
SAFETY
Beginning with mobilization and ending with acceptance of work, the Contractor shall be responsible for providing a clean and safe work environment at the project site. The Contractor shall comply with all OSHA regulations as they pertain to this project.
CLEANUP
All restoration and clean-up work shall be performed daily. Operations shall be suspended if the
Contractor fails to accomplish restoration and clean-up within an acceptable period of time.
Failure to perform clean-up activities may result in suspension of the work.
3.4.1 RFP / Project General Information
1. The City will select the best qualified Contractor(s) based on the information received from interested firms as a result of this solicitation. Multiple firms may be selected.
2. City of Johns Creek will expect to liaison with a single Project Manager representing the prime contractor firm and the sub-contractor. The City of Johns Creek reserves the right to approve sub-contractor. Project Manager listed in the RFP will not be changed without the approval of the City.
3. City of Johns Creek reserves the right to cancel any and all Request for Proposals at any time when it is determined to be in the best interest of the City.
4. City of Johns Creek also reserves the right to increase, reduce, add or delete any item in this solicitation as deemed necessary.
5. Generally, the Purchasing Division’ and Public Work’s position is not to provide
Debriefings until after the contract has been awarded, except for firms disqualified during the Due Diligence Process, in which case a Pre-Award Debriefing can be requested following Due Diligence. For these contracts, Pre-award debriefings would be provided after the announcement of the short-listed firms within the time period posted on the website. All requests must be made and scheduled within this time frame. Any request outside of this time period will be accommodated only at the discretion and convenience of the City staff.
Incomplete submittals will not be considered. Late submittals will not be accepted.
MANDITORY RESPONSE-TECHNICAL PROPOSALS
3.5 Project Understanding & Approach -30 Points Max
The Contractor shall demonstrate an understanding of the City’s goals, project constraints and objectives for the project. The contractor must also understand the project’s challenges and issues and what affect they will have on project delivery. Simply restating the scope of services does not demonstrate an understanding of the project.
Provide a description of work plan and the methods to be used that will convincingly demonstrate what the Offeror intends to do, the timeframes necessary to accomplish the work, and how the work will be accomplished. Some of the information to include is number of crews, expected equipment, expected lead times for ordering supplies and scheduling the work as well as other information deemed necessary.
The City of Johns Creek is interested in approaches that are innovative and economic.
Consideration should also be given to maintain economic responsibility during this project.
Basis of Evaluation
1. Is the project discussion and schedule reasonable?
2. Are personnel listed adequate to implement the schedule?
3. Discuss method and timing of implementing project and tasks.
4. Discuss experience with emergency events.
3.6 Experience / Qualification of Project Manager -20 Points Max
Provide a short description of the Project Manager’s experience on similar projects. Project
Manager listed in the RFP will not be changed without the approval of the City.
Basis of Evaluation
1. Quality and relevant experience
2. Demonstrated experience and reputation of project manager…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .