Exhibit B- Construction Materials.pdf
PDF 144 KB Posted
- Solicitation number
- 325-428
- Issued by
- Chelan County, Clark County, Grays Harbor County, Jefferson County, King County, Kittitas County, Okanogan County, Pierce County, Walla Walla County, Whatcom County, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Chelan City, Chelan Falls CDP, Kingston CDP, Kittitas City, Okanogan City, Washington
About this file
This document is an Exhibit B for RFP 325-428 issued by the Washington State Parks and Recreation Commission (State Parks) to solicit proposals for New Park Model Recreation Vehicles (PMRV) to be used as employee residences. The required units must be studio or one-bedroom, capable of being transported, not exceeding 12ft W x 38ft L, and constructed with high-quality, energy-efficient materials and methods, including metal roofing, neutral exterior colors, and fire-wise/non-flammable materials. The units must include specific appliances, plumbing, electrical, and heating system requirements. Optional features include a washer/dryer and skirting. The contract will serve multiple jurisdictions within Washington state, including Grays Harbor, Chelan, Okanogan, King, Whatcom, Clark, Walla Walla, Pierce, Kittitas, and Jefferson counties.
The RFP does not provide specific pricing information. However, it notes that the contractor will be responsible for transportation and delivery of the units to various locations throughout the state. Bidders must provide detailed written responses addressing how they will meet the mandatory requirements, and attachments may be included to support their responses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B
Construction Materials Used and Assembly Fit and Finishes
RFP 325-428 New Park Model Recreation Vehicles (PMRV) Page 1 of 3
Bidder Name: _____________________________________________________________________________________________ RFP No: 325-428
Instructions:
1. Review Requirements listed in Section 1.2 New Park Model Recreation Vehicles (PMRV), Manufacturing Specifications and the requirements listed below, prior to completing this form.
2. In the Written Response column, for every requirement that indicates a "Written Response Required," provide a detailed written response addressing how the bidder will meet the mandatory requirement. Limited responses may receive lower scores than those that demonstrate a full understanding and mastery of the subject matter.
3. Bidder’s may attach additional documents and/or images to support their response to each line. If doing so, please clearly identify each attachment, referencing which line item it relates to. (i.e.: Supports Requirement ID 2) Bidders should also cross reference any attachments in completion of this form. (i.e.: See included brochure for description of building materials)
Requirement ID Function Requirement Priority Material used or other relevant response
1. Each New Park Model Recreation Vehicle must be a studio or one bedroom unit.
Mandatory
2. Capable of being transported (permit supplied by contractor)
Mandatory
3. Does not exceed the measurements of 12ft W X 38ft L (transportation/towing not included in measurements)
Mandatory
4. High quality building materials used, such as solid wood and high-grade insulation, as well as sturdy construction methods.
Mandatory
5. Standard building materials used that can be sourced at most
Mandatory
RFP 325-428 New Park Model Recreation Vehicles (PMRV) Page 2 of 3 building supply centers, including all framing, plumbing, electrical, mechanical, hardware, doors and cabinets, trim and finish materials.
Requirement ID Function Requirement Priority Material used
6. Energy efficient design, energy efficient or energy rated construction materials and methods desired.
Mandatory
7. Designed for and includes winterization procedures that necessary associated design elements. i.e. Plumbing must be designed so all cold and hot water supply lines, and fixtures, can be drained. All proposed units must include manufacturer supplied winterization procedures.
Mandatory
8. Metal Roofing Mandatory
9. Neutral exterior colors – Paint colors and sheen information provided for touch up and repair.
Mandatory
10. Domestic water connection to be a minimum ¾’ NPS, or equivalent PEX/Wirsbo may be used as a substitute.
Mandatory
11 Sewer connection to be a minimum of 3” ABD/PVC exiting the building.
Mandatory
12. Fire wise and or non-flammable exterior building materials.
Mandatory
RFP 325-428 New Park Model Recreation Vehicles (PMRV) Page 3 of 3
13. Electrical connection on exterior of building is compatible with 50-amp RV service.
Mandatory
14. Industry standard heating system matched to unit size
Mandatory
Requirement ID Function Requirement Priority Material used
15. Units must come with the following appliances: 30” gas range/oven, refrigerator. Location and necessary plumbing, venting and electrical must be provided for a washer/dryer unit.
Mandatory
16. Includes full kitchen and full bathroom facilities
Mandatory
Optional Features
17. Washer / Dryer in unit Provide Pricing Option
Optional
18. Skirting Pricing Option Optional
File details come from the government source that posted it. Updated .