This is a Scope of Work document for the Johnson Window Replacement project (CNCC FY27-001) issued by Colorado's community college system. The project involves the replacement of windows at the Johnson facility, with the scope including removal of existing windows, installation of new energy-efficient windows, and related restoration work. The document outlines detailed specifications for window materials, installation standards, and quality requirements to ensure compliance with building codes and energy efficiency standards. Specific quantities, timelines for completion, and site condition assessments are detailed to provide bidders with comprehensive project parameters for accurate cost estimation and scheduling.
The Scope of Work establishes technical requirements for window specifications, including frame materials, glass type, insulation values, and weatherproofing standards. The document specifies inspection and testing procedures, warranty requirements, and performance standards that contractors must meet. Pricing should be submitted as a fixed price for the complete window replacement scope, with payment contingent upon completion of milestones and final acceptance of work. Additional details regarding project site conditions, existing building characteristics, and any environmental or structural considerations are included to inform contractor planning and cost proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CNCC Johnson Building Storefront and Entrance Replacement
Exhibit B – Scope of Work
Project Scope The Contractor shall furnish all labor, materials, supervision, equipment, tools, transportation, disposal, access equipment, and incidentals required to provide a complete storefront replacement project at the CNCC Johnson Building.
Preconstruction Services Field verification of dimensions and existing conditions; coordination of access and work sequencing; shop drawings; Owner coordination; procurement and scheduling.
Demolition Removal of existing storefront framing, glazing, entrance door and related components;
protection of adjacent finishes and occupied areas.
Disposal Removal and legal disposal of demolished materials and site housekeeping.
Storefront Systems Provide thermally broken commercial aluminum storefront systems. Basis of design:
Kawneer, YKK AP, EFCO, Tubelite, Oldcastle, or approved equal.
Fixed Storefront Assembly Maximum U-Factor 0.34 and SHGC 0.38. Provide insulated glazing units; tempered glazing where required.
Entrance Storefront Assembly Maximum U-Factor 0.63 and SHGC 0.34. Provide tempered safety glass storefront door.
Door Hardware Heavy-duty closer, threshold, weatherstripping, panic hardware, locking hardware compatible with Owner key system, and all hardware required for complete operation.
Electronic Access Control Provide complete electronic access control including electronic lock, reader, door contact, request-to-exit device, controller, power supply, battery backup, wiring, programming, testing and commissioning. Panic hardware with access control required. CNCC
CURRENTLY USES THE OLDER VERSION OF ACCESS IT THAT IS NOT CLOUD-BASED,
AND DOES NOT PLAN TO SWITCH.
Finish Requirements Match existing Johnson Building main entrance storefront frame color.
Site Visit and Existing Conditions Bidders shall conduct a site visit and include all work reasonably inferable from visible existing conditions. No additional compensation will be granted for conditions that could have been identified during pre-bid inspection.
Field Verification All dimensions are V.I.F. Contractor shall verify all dimensions prior to fabrication.
Submittals Shop drawings, product data, hardware schedule, access control information, color samples, glazing performance data, warranties.
Warranties One-year workmanship warranty plus manufacturer warranties for storefront, glazing, hardware and access control equipment.
Closeout Warranty documents, maintenance information, final shop drawings, keying schedule, record drawings and owner training documentation.
| Project Scope |
| Preconstruction Services |
| Demolition |
| Disposal |
| Storefront Systems |
| Fixed Storefront Assembly |
| Entrance Storefront Assembly |
| Door Hardware |
| Electronic Access Control |
| Finish Requirements |
| Site Visit and Existing Conditions |
| Field Verification |
| Submittals |
| Warranties |
| Closeout |