About this file
Exhibit B is a price worksheet for the SDFM Water Treatment Chemicals bid RFP solicitation issued by the State of Colorado. The document establishes the cost structure for water treatment services encompassing boiler plant and cooling tower operations. Bidders must provide itemized monthly costs for system checks, monitoring, and required testing; equipment usage; and materials and chemical costs for both boiler plant and cooling tower requirements. Additional line items include training with health and safety components, disposal fees if applicable, and miscellaneous cleaning and maintenance services.
The pricing structure requires bidders to submit monthly costs for each service category, a one-time mobilization cost, and any additional fees. Bidders must also provide a transition fee covering equipment setup, fine-tuning to meet site requirements, and coordination of existing equipment transition to the chosen vendor's equipment. The total cost for the first year, including all one-time fees, must be clearly identified. This comprehensive pricing approach allows the State of Colorado to evaluate the full financial impact of each bid proposal for water treatment chemical services and related operational support.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.docx | DOCX document | |
| Final Water Treatment Chemicals SDFM RFP .docx | DOCX document | |
| Exhibit D Contract Template, Terms & Conditions v 4.13 Final Locked.docx.pdf | ||
| Walkthrough.pdf | ||
| Addendum 1 (1) (2).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B
Price Work Sheet
EXHIBIT B, TABLE 1 – COST TABLE
In the following table list the cost of each item and what it will cost per month:
| Bid Item |
| Per month Cost |
Boiler Plant Requirements: System Checks, Monitoring and Required Testing
Boiler Plant Equipment Usage Cost
Boiler Plant Material/Chemical cost
Cooling Towers Requirements: System Checks, Monitoring and Required Tests
Cooling Tower Equipment Usage Cost
Cooling Tower Materials/Chemical Cost
Training including Health and Safety
Disposal Fees, if applicable
Misc. Cleaning and Maintenance
TOTAL
One time Mobilization Cost: $_______________________________________________________________________________ Additional Fees: $_____________________________________________________________________________________________ Transition fee, setting and fine tuning all equipment to meet site requirements, coordinating the transition of existing equipment to chosen vendors equipment.
Total Cost (First year with one-time fees): $ ______________________________________________________________
Exhibit B, Rev 7/2025 Page 1 of 2