Exhibit A
| SECTION B: CLIN 0001 | | | | |
| EXHIBIT A: ORDERING YEAR ONE | | | | |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| A001 | REMOVE EXISTING DECK COVERING SYSTEM TO SUBSTRATE, SURFACE PREPARATION, AND COATING APPLICATION. Provide labor, services, equipment, and materials for the removal of the existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work. | | | |
| A001AA | Remove existing Ceramic Tiles (Quarry and/or Porcelain) deck covering system. | 2,000 | SF | $0.00 |
| A001AB | Remove existing Wear-Resistant Deck Tiles deck covering system. | | | |
| MIL-PRF-32170 | 1,000 | SF | | $0.00 | |
| A001AC | Remove existing High Durability Deck Coating deck covering system. | | | |
| Type I and/or Type II. MIL-PRF-32584 | 2,000 | SF | | $0.00 | |
| A001AD | Remove existing AFFF Resistant Coating deck covering system, Type III. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A001AE | Remove existing Chemical Resistant Floorings deck covering system. | | | |
| Type IV and/or Type V. MIL-PRF-32584 | 2,000 | SF | | $0.00 | |
| A001AF | Remove existing Electrical Grade Sheeting and Matting deck covering system. | | | |
| MIL-DTL-15562 | 3,000 | SF | | $0.00 | |
| A001AG | Remove existing Electrical Grade Sheeting and Matting deck covering system (Loose Lay). MIL-DTL-15562 | 1,500 | SF | $0.00 |
| A001AH | Remove existing Carpeting deck covering system | 1,000 | SF | $0.00 |
| A001AI | Remove existing Solid Vinyl and Vinyl Composition Tile deck covering system. | | | |
| MIL-PRF-32704 | 1,000 | SF | | $0.00 | |
| A001AJ | Remove existing deck covering system. | | | |
| NOTE: Deck covering system not covered under any of the above A001 Sub-ELINs | 1,000 | SF | | $0.00 | |
| A001AK | Remove existing deck covering system including the use of hand tools only | | | |
| (Cold Work - Removal and Surface Preparation). | 1,000 | SF | | $0.00 | |
| A001 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A002 | INSTALL NEW: CERAMIC TILES (QUARRY AND/OR PORCELAIN) DECK COVERING SYSTEM. Provide labor, services, equipment, and materials for the installation on the entire deck of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work. | |
NOTE: Applicable A001 Sub-ELIN shall provide labor, services, equipment, and materials for the the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| A002AA | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 2 inch X 2 inch | 2,000 | SF | $0.00 |
| A002AB | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 3 inch X 3 inch | 2,000 | SF | $0.00 |
| A002AC | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 4 inch X 4 inch | 2,000 | SF | $0.00 |
| A002AD | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 6 inch X 6 inch | 2,000 | SF | $0.00 |
| A002AE | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 8 inch X 8 inch | 2,000 | SF | $0.00 |
| A002AF | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 2 inch X 2 inch | 1,000 | LF | $0.00 |
| A002AG | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 3 inch X 3 inch | 1,000 | LF | $0.00 |
| A002AH | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 4 inch X 4 inch | 1,000 | LF | $0.00 |
| A002AI | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 6 inch X 6 inch | 1,000 | LF | $0.00 |
| A002AJ | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 8 inch X 8 inch | 1,000 | LF | $0.00 |
| A002 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A003 | REPAIR ONLY: CERAMIC TILES (QUARRY AND/OR PORCELAIN) DECK COVERING SYSTEM. Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, cove base tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A003AA | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 2 inch X 2 inch | 200 | SF | $0.00 |
| A003AB | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 3 inch X 3 inch | 200 | SF | $0.00 |
| A003AC | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 4 inch X 4 inch | 200 | SF | $0.00 |
| A003AD | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 6 inch X 6 inch | 200 | SF | $0.00 |
| A003AE | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 8 inch X 8 inch | 200 | SF | $0.00 |
| A003AF | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 2 inch X 2 inch | 100 | LF | $0.00 |
| A003AG | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 3 inch X 3 inch | 100 | LF | $0.00 |
| A003AH | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 4 inch X 4 inch | 100 | LF | $0.00 |
| A003AI | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 6 inch X 6 inch | 100 | LF | $0.00 |
| A003AJ | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose). Tiles Size: 8 inch X 8 inch | 100 | LF | $0.00 |
| A003 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A004 | INSTALL NEW: WEAR-RESISTANT DECK TILES DECK COVERING SYSTEM, MIL-PRF-32170. Provide labor, services, equipment, and materials for the installation on the entire deck of new Wear-Resistant Deck Tiles deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work. | |
NOTE: Applicable A001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| A004AA | Install new deck covering system: Wear-Resistant Deck Tiles. | | |
| MIL-PRF-32170 | 500 | SF | $0.00 | |
| A004 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A005 | REPAIR ONLY: WEAR-RESISTANT DECK TILES DECK COVERING SYSTEM, MIL-PRF-32170. Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of the new Wear-Resistant Deck Tiles deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A005AA | Repair only of existing deck covering system: Wear-Resistant Deck Tiles. | | |
| MIL-PRF-32170 | 500 | SF | $0.00 | |
| A005 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A006 | INSTALL NEW: HIGH DURABILITY DECK COATING AND/OR AFFF RESISTANT COATING DECK COVERING SYSTEM. Provide labor, services, equipment, and materials for the installation on the entire deck of new High Durability Deck Coating and/or AFFF Resistant Coating deck covering system, to include new underlayment material, new waterproof membrane, new high durability coat, in accordance with the requirements of the statement of work. | |
NOTE: Applicable A001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| A006AA | Install new deck covering system: High Durability Deck Coating, Corrosion Resistant - Type I. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A006AB | Install new deck covering system: High Durability Deck Coating, Corrosion Resistant - Type II. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A006AC | Install new deck covering system: Coating AFFF Resistant. (AFFF Stations) | | | |
| Type III. MIL-PRF-32584 | 1,000 | SF | | $0.00 | |
| A006 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A007 | REPAIR ONLY: HIGH DURABILITY DECK COATING DECK AND/OR AFFF RESISTANT COATING COVERING SYSTEM, MIL-PRF-32584. Provide labor, services, equipment and materials for the removal to substrate of only the damaged High Durability Deck Coating - Corrosion Resistant deck covering, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material and new waterproof membrane. Apply High Durability Deck Coating - Corrosion Resistant deck covering system on the entire deck to provide an even color, appearance, and texture of the entire deck in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A007AA | Repair only of existing deck covering system: High Durability Deck Coating, Corrosion resistant. Type I. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A007AB | Repair only of existing deck covering system: High Durability Deck Coating, Corrosion Resistant. Type II. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A009AA | Repair, recoat or recolor and reseal only of existing deck covering system: Coating AFFF Resistant. (AFFF Stations) Type III. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A007 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A008 | INSTALL NEW: CHEMICAL-RESISTANT FLOORING DECK COVERING SYSTEM, MIL-PRF-32584. Provide labor, services, equipment, and materials for the installation on the entire deck of new Chemical-Resistant Flooring deck covering system, to include new underlayment material, new waterproof membrane, new color coat, and new seal coat with aggregate, in accordance with the requirements of the statement of work. | |
NOTE: Applicable A001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| A008AA | Install new deck covering system: Chemical-Resistant Flooring. | | |
| Type IV. MIL-PRF-32584 | 1,000 | SF | $0.00 | |
| A008AB | Install new deck covering system: Chemical-Resistant Flooring. | | |
| Type V. MIL-PRF-32584 | 1,000 | SF | $0.00 | |
| A008 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A009 | REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING DECK COVERING SYSTEM, MIL-PRF-32584. Provide labor, services, equipment and materials for the removal to substrate of only the damaged Chemical-Resistant Flooring deck covering, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane and new Chemical-Resistant Flooring on removed areas only. Recoat or recolor and reseal (with aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A009AA | Repair, recoat or recolor and reseal only of existing deck covering system: Chemical-Resistant Flooring. Type IV. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A009AB | Repair, recoat or recolor and reseal only of existing deck covering system: Chemical-Resistant Flooring. Type V. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| A009 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A010 | INSTALL NEW: ELECTRICAL GRADE SHEETING AND MATTING DECK COVERING SYSTEM, MIL-DTL-15562. Provide labor, services, equipment and materials for the installation on the entire deck of new Electrical Grade Sheeting and Matting deck covering system, to include new underlayment, in accordance with the requirements of the statement of work. | |
NOTE: Applicable A001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| A010AA | Install new deck covering system: Electrical Grade Sheeting and Matting. | | |
| MIL-DTL-15562 | 1,500 | SF | $0.00 | |
| A010AB | Install new deck covering system: Electrical Grade Sheeting and Matting (Loose Lay). | | |
| MIL-DTL-15562 | 1,500 | SF | $0.00 | |
| A010 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A011 | REPAIR ONLY: ELECTRICAL GRADE SHEETING AND MATTING DECK COVERING SYSTEM, MIL-DTL-15562. Provide labor, services, equipment and materials for the removal of the entire existing Electrical Grade Sheeting and Matting and removal to substrate of only the damaged underlayment material, and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Electrical Grade Sheeting and Matting deck covering system on the entire deck, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A011AA | Repair only of existing deck covering system: Electrical Grade Sheeting and Matting. | | | |
| MIL-DTL-15562 | 1,500 | SF | | $0.00 | |
| A011AB | Repair only of existing deck covering system: Electrical Grade Sheeting and Matting Loose Lay). MIL-DTL-15562 | 1,500 | SF | $0.00 |
| A011 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | |
| A012 | INSTALL NEW: CARPETING DECK COVERING SYSTEM. Provide labor, services, equipment and materials for the installation of the new Carpeting deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work. | | |
NOTE: Applicable A001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| A012AA | Install new deck covering system: Carpeting | 300 | SY | $0.00 |
| A012 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE (U/i) | ESTIMATED PRICE PER UNIT OF ISSUE (U/i) | EXTENDED AMOUNT |
| A013 | REPAIR ONLY: CARPETING DECK COVERING SYSTEM. Provide labor, services, equipment and materials for the removal of the entire existing Carpeting and removal to substrate of only the damaged underlayment and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Carpeting deck covering system on the entire deck, in accordance with the requirements of the statement of work. | | | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A013AA | Repair only of existing deck covering system: Carpeting | 300 | SY | $0.00 |
| A013 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A014 | INSTALL NEW: SOLID VINYL AND/OR VINYL COMPOSITION TILE DECK COVERING SYSTEM, MIL-PRF-32704. Provide labor, services, equipment and materials for the installation of the new Solid Vinyl and/or Vinyl Composition Tile deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work. | |
NOTE: Applicable A001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| A014AA | Install new deck covering system: Solid Vinyl Tile. | | |
| MIL-PRF-32704 | 500 | SF | $0.00 | |
| A014AB | Install new deck covering system: Vinyl Composition Tile. | | |
| MIL-PRF-32704 | 500 | SF | $0.00 | |
| A014 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A015 | REPAIR ONLY: SOLID VINYL AND/OR VINYL COMPOSITION TILE DECK COVERING SYSTEM, MIL-PRF-32704. Provide labor, services, equipment and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and the subsequent surface preparation, cleaning, and coating application. Installation of the new underlayment material and new Solid Vinyl and/or Vinyl Composition Tile deck covering system on removed areas only, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A015AA | Repair only of existing deck covering system: Solid Vinyl Tile. | | | |
| MIL-PRF-32704 | 500 | SF | | $0.00 | |
| A015AA | Repair only of existing deck covering system: Vinyl Composition Tile. | | | |
| MIL-PRF-32704 | 500 | SF | | $0.00 | |
| A015 | ITEM NUMBER TOTAL | 2 | | $0.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| A016 | INSTALL NEW: LOGOS AND/OR DECALS . Provide labor, services, equipment and materials for the installation of new Logos and/or decals in accordance with the requirements of the statement of work. | | | |
| A016AA | Install new deck covering system: Logos and/or Decals - Size 1 - 2 SF | 20 | EA | $0.00 |
| A016AB | Install new deck covering system: Logos and/or Decals - Size 2 - 4 SF | 20 | EA | $0.00 |
| A016AC | Install new deck covering system: Logos and/or Decals - Size 4 - 6 SF | 20 | EA | $0.00 |
| A016AD | Install new deck covering system: Logos and/or Decals - Size 6 - 8 SF | 20 | EA | $0.00 |
| A016AE | Install new deck covering system: Logos and/or Decals - Size 8 - 10 SF | 20 | EA | $0.00 |
| A016AF | Install new deck covering system: Logos and/or Decals - Size 10 - 12 SF | 20 | SF | $0.00 |
| A016 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| A017 | REMOVAL OF EXISTING DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 AND/OR MIL-D-23134. Provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work. | | | |
| A017AA | Removal of existing Chemical-Resistant Flooring (MIL-PRF-32584 Type IV) deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134. | 200 | SF | $0.00 |
| A017AB | Removal of existing Chemical-Resistant Flooring (MIL-PRF-32584, Type V) deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134. | 200 | SF | $0.00 |
| A017AC | Removal of existing Electrical Grade Sheeting and Matting, MIL-DTL-15562, deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134. | 200 | SF | $0.00 |
| A017AD | Removal of existing Electrical Grade Sheeting and Matting, MIL-DTL-15562 (Loose Lay), deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134. | 200 | SF | $0.00 |
| A017 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| A018 | INSTALL NEW: DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OAND/R MIL-D-23134. Provide labor, services, equipment and materials for the installation of new deck covering system, to include new insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, and new waterproof membrane, in accordance with the requirements of the statement of work. | | | |
| A018AA | Install new deck covering system: Chemical-Resistant Flooring, MIL-PRF-32584 (Type IV), including new color coat, new colored flakes, and new seal coat with aggregate. | | | |
| NOTE: Applicable A017 Sub-ELIN shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work. | 200 | SF | | $0.00 | |
| A018AB | Install new deck covering system: Chemical-Resistant Flooring, MIL-PRF-32584 (Type V), including new color coat, new colored flakes, and new seal coat with aggregate. | | | |
| NOTE: Applicable A017 Sub-ELIN shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work. | 200 | SF | | $0.00 | |
| A018AC | Install new deck covering system: Electrical Grade Sheeting and Matting, MIL-DTL-15562 | | | |
| NOTE: Applicable A017 Sub-ELIN shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work. | 200 | SF | | $0.00 | |
| A018AD | Install new deck covering system: Electrical Grade Sheeting and Matting, MIL-DTL-15562 (Loose Lay) | | | |
| NOTE: Applicable A017 Sub-ELIN shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work. | 200 | SF | | $0.00 | |
| A018 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| A019 | REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 AND/OR MIL-D-23134. Provide labor, services, equipment and materials for the removal to substrate of only the damaged deck covering, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, new waterproof membrane, and new deck covering system on removed areas only. Recoat or recolor, and reseal (with aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| A019AA | Repair only of existing deck covering system: Chemical-Resistant Flooring Type IV | 200 | SF | $0.00 |
| A019AB | Repair only of existing deck covering system: Chemical-Resistant Flooring Type V | 200 | SF | $0.00 |
| A019AC | Repair only of existing deck covering system: Electrical Grade Sheeting and Matting. | 200 | SF | $0.00 |
| A019AD | Repair only of existing deck covering system: Electrical Grade Sheeting and Matting, (Loose Lay) | 200 | SF | $0.00 |
| A019 | ITEM NUMBER TOTAL | | | $0.00 |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| A020 | MOLD REMEDIATION. Provide labor services, equipment and materials for the accomplishment of the Mold Remediation procedure in accordance with the requirements of the statement of work. | | | |
| A020AA | Mold Remediation procedure for different types Interior Deck Covering systems. | 100 | SF | $0.00 |
| A020 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | |
| A021 | OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order. | | |
| A021AA | ADDITIONAL WORK - LABOR | | |
| NOTE: The offeror’ s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 100 | HRS | | $0.00 |
| A021AB | ADDITIONAL WORK - MATERIALS | | |
NOTE: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor.
| The unit price of SubELIN A021AB will remain at $1.00 for calculation purposes. | 15,000 | LOT | $1.00 | $15,000.00 | |
| A021AC | ADDITIONAL WORK - MATERIALS HANDLING FEE | | | |
| NOTE: Offeror shall propose a material handling burdened rate: ______% to be applied to Sub-ELIN A021AB. | 1 | % | | $0.00 | |
| A021 | ITEM NUMBER TOTAL | | | $15,000.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| A022 | ACCELERATED DELIVERY: It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. ELIN ITEM NO. A001 through A021AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total Extended Amount of ELINS A001 through A021 = $_____________ (multiplied by) 10 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN ITEM NO. A021). | | | |
| A001 - A021 | ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION | | | $15,000.00 |
| | ANTICIPATED ACCELERATED DELIVERY TOTAL (10%): | | | $1,500.00 |
| | ADDITIONAL PERCENT FEE PROPOSED: | | Lot | $0.00 |
| A022 | ITEM NUMBER TOTAL | | | $0.00 |
ELIN SUMMARY: ORDERING YEAR ONE
| ELIN | | |
| ITEM NO. | EXTENDED AMOUNT | | |
| A001 TOTAL | $0.00 | |
| A002 TOTAL | $0.00 | TOTAL AMOUNT |
| ORDERING YEAR ONE | | | $15,000.00 |
| A003 TOTAL | $0.00 | |
| A004 TOTAL | $0.00 | |
| A005 TOTAL | $0.00 | |
| A006 TOTAL | $0.00 | |
| A007 TOTAL | $0.00 | |
| A008 TOTAL | $0.00 | |
| A009 TOTAL | $0.00 | |
| A010 TOTAL | $0.00 | |
| A011 TOTAL | $0.00 | |
| A012 TOTAL | $0.00 | |
| A013 TOTAL | $0.00 | |
| A014 TOTAL | $0.00 | |
| A015 TOTAL | $0.00 | |
| A016 TOTAL | $0.00 | |
| A017 TOTAL | $0.00 | |
| A018 TOTAL | $0.00 | |
| A019 TOTAL | $0.00 | |
| A020 TOTAL | $0.00 | |
| A021 TOTAL | $15,000.00 | |
| A022 TOTAL | $0.00 | |
EXHIBIT "A"
ORDERING YEAR ONE
&P of &N
Exhibit B
| SECTION B: CLIN 0001 | | | | |
| EXHIBIT B: ORDERING YEAR TWO | | | | |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| B001 | REMOVE EXISTING DECK COVERING SYSTEM TO SUBSTRATE, SURFACE PREPARATION, AND COATING APPLICATION. Provide labor, services, equipment, and materials for the removal of the existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work. | | | |
| B001AA | Remove existing Ceramic Tiles (Quarry and/or Porcelain) deck covering system. | 2,000 | SF | $0.00 |
| B001AB | Remove existing Wear-Resistant Deck Tiles deck covering system. | | | |
| MIL-PRF-32170 | 1,000 | SF | | $0.00 | |
| B001AC | Remove existing High Durability Deck Coating deck covering system. | | | |
| Type I and/or Type II. MIL-PRF-32584 | 2,000 | SF | | $0.00 | |
| B001AD | Remove existing AFFF Resistant Coating deck covering system, Type III. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B001AE | Remove existing Chemical Resistant Floorings deck covering system. | | | |
| Type IV and/or Type V. MIL-PRF-32584 | 2,000 | SF | | $0.00 | |
| B001AF | Remove existing Electrical Grade Sheeting and Matting deck covering system. | | | |
| MIL-DTL-15562 | 3,000 | SF | | $0.00 | |
| B001AG | Remove existing Electrical Grade Sheeting and Matting deck covering system (Loose Lay). MIL-DTL-15562 | 1,500 | SF | $0.00 |
| B001AH | Remove existing Carpeting deck covering system | 1,000 | SF | $0.00 |
| B001AI | Remove existing Solid Vinyl and Vinyl Composition Tile deck covering system. | | | |
| MIL-PRF-32704 | 1,000 | SF | | $0.00 | |
| B001AJ | Remove existing deck covering system. | | | |
| NOTE: Deck covering system not covered under any of the above B001 Sub-ELINs | 1,000 | SF | | $0.00 | |
| B001AK | Remove existing deck covering system including the use of hand tools only | | | |
| (Cold Work - Removal and Surface Preparation). | 1,000 | SF | | $0.00 | |
| B001 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B002 | INSTALL NEW: CERAMIC TILES (QUARRY AND/OR PORCELAIN) DECK COVERING SYSTEM. Provide labor, services, equipment, and materials for the installation on the entire deck of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work. | |
NOTE: Applicable B001 Sub-ELIN shall provide labor, services, equipment, and materials for the the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| B002AA | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 2 inch X 2 inch | 2,000 | SF | $0.00 |
| B002AB | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 3 inch X 3 inch | 2,000 | SF | $0.00 |
| B002AC | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 4 inch X 4 inch | 2,000 | SF | $0.00 |
| B002AD | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 6 inch X 6 inch | 2,000 | SF | $0.00 |
| B002AE | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 8 inch X 8 inch | 2,000 | SF | $0.00 |
| B002AF | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 2 inch X 2 inch | 1,000 | LF | $0.00 |
| B002AG | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 3 inch X 3 inch | 1,000 | LF | $0.00 |
| B002AH | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 4 inch X 4 inch | 1,000 | LF | $0.00 |
| B002AI | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 6 inch X 6 inch | 1,000 | LF | $0.00 |
| B002AJ | Install new deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 8 inch X 8 inch | 1,000 | LF | $0.00 |
| B002 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B003 | REPAIR ONLY: CERAMIC TILES (QUARRY AND/OR PORCELAIN) DECK COVERING SYSTEM. Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, cove ORDERING tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| B003AA | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 2 inch X 2 inch | 200 | SF | $0.00 |
| B003AB | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 3 inch X 3 inch | 200 | SF | $0.00 |
| B003AC | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 4 inch X 4 inch | 200 | SF | $0.00 |
| B003AD | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 6 inch X 6 inch | 200 | SF | $0.00 |
| B003AE | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain). Tiles Size: 8 inch X 8 inch | 200 | SF | $0.00 |
| B003AF | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 2 inch X 2 inch | 100 | LF | $0.00 |
| B003AG | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 3 inch X 3 inch | 100 | LF | $0.00 |
| B003AH | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 4 inch X 4 inch | 100 | LF | $0.00 |
| B003AI | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 6 inch X 6 inch | 100 | LF | $0.00 |
| B003AJ | Repair only of existing deck covering system: Ceramic Tiles (Quarry and/or Porcelain) - Cove ORDERING (Bull Nose). Tiles Size: 8 inch X 8 inch | 100 | LF | $0.00 |
| B003 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B004 | INSTALL NEW: WEAR-RESISTANT DECK TILES DECK COVERING SYSTEM, MIL-PRF-32170. Provide labor, services, equipment, and materials for the installation on the entire deck of new Wear-Resistant Deck Tiles deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work. | |
NOTE: Applicable B001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| B004AA | Install new deck covering system: Wear-Resistant Deck Tiles. | | |
| MIL-PRF-32170 | 500 | SF | $0.00 | |
| B004 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B005 | REPAIR ONLY: WEAR-RESISTANT DECK TILES DECK COVERING SYSTEM, MIL-PRF-32170. Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of the new Wear-Resistant Deck Tiles deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| B005AA | Repair only of existing deck covering system: Wear-Resistant Deck Tiles. | | |
| MIL-PRF-32170 | 500 | SF | $0.00 | |
| B005 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B006 | INSTALL NEW: HIGH DURABILITY DECK COATING AND/OR AFFF RESISTANT COATING DECK COVERING SYSTEM. Provide labor, services, equipment, and materials for the installation on the entire deck of new High Durability Deck Coating and/or AFFF Resistant Coating deck covering system, to include new underlayment material, new waterproof membrane, new high durability coat, in accordance with the requirements of the statement of work. | |
NOTE: Applicable B001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| B006AA | Install new deck covering system: High Durability Deck Coating, Corrosion Resistant - Type I. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B006AB | Install new deck covering system: High Durability Deck Coating, Corrosion Resistant - Type II. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B006AC | Install new deck covering system: Coating AFFF Resistant. (AFFF Stations) | | | |
| Type III. MIL-PRF-32584 | 1,000 | SF | | $0.00 | |
| B006 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B007 | REPAIR ONLY: HIGH DURABILITY DECK COATING DECK AND/OR AFFF RESISTANT COATING COVERING SYSTEM, MIL-PRF-32584. Provide labor, services, equipment and materials for the removal to substrate of only the damaged High Durability Deck Coating - Corrosion Resistant deck covering, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material and new waterproof membrane. Apply High Durability Deck Coating - Corrosion Resistant deck covering system on the entire deck to provide an even color, appearance, and texture of the entire deck in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| B007AA | Repair only of existing deck covering system: High Durability Deck Coating, Corrosion resistant. Type I. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B007AB | Repair only of existing deck covering system: High Durability Deck Coating, Corrosion Resistant. Type II. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B009AA | Repair, recoat or recolor and reseal only of existing deck covering system: Coating AFFF Resistant. (AFFF Stations) Type III. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B007 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B008 | INSTALL NEW: CHEMICAL-RESISTANT FLOORING DECK COVERING SYSTEM, MIL-PRF-32584. Provide labor, services, equipment, and materials for the installation on the entire deck of new Chemical-Resistant Flooring deck covering system, to include new underlayment material, new waterproof membrane, new color coat, and new seal coat with aggregate, in accordance with the requirements of the statement of work. | |
NOTE: Applicable B001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| B008AA | Install new deck covering system: Chemical-Resistant Flooring. | | |
| Type IV. MIL-PRF-32584 | 1,000 | SF | $0.00 | |
| B008AB | Install new deck covering system: Chemical-Resistant Flooring. | | |
| Type V. MIL-PRF-32584 | 1,000 | SF | $0.00 | |
| B008 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B009 | REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING DECK COVERING SYSTEM, MIL-PRF-32584. Provide labor, services, equipment and materials for the removal to substrate of only the damaged Chemical-Resistant Flooring deck covering, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane and new Chemical-Resistant Flooring on removed areas only. Recoat or recolor and reseal (with aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| B009AA | Repair, recoat or recolor and reseal only of existing deck covering system: Chemical-Resistant Flooring. Type IV. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B009AB | Repair, recoat or recolor and reseal only of existing deck covering system: Chemical-Resistant Flooring. Type V. MIL-PRF-32584 | 1,000 | SF | $0.00 |
| B009 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B010 | INSTALL NEW: ELECTRICAL GRADE SHEETING AND MATTING DECK COVERING SYSTEM, MIL-DTL-15562. Provide labor, services, equipment and materials for the installation on the entire deck of new Electrical Grade Sheeting and Matting deck covering system, to include new underlayment, in accordance with the requirements of the statement of work. | |
NOTE: Applicable B001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| B010AA | Install new deck covering system: Electrical Grade Sheeting and Matting. | | |
| MIL-DTL-15562 | 1,500 | SF | $0.00 | |
| B010AB | Install new deck covering system: Electrical Grade Sheeting and Matting (Loose Lay). | | |
| MIL-DTL-15562 | 1,500 | SF | $0.00 | |
| B010 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B011 | REPAIR ONLY: ELECTRICAL GRADE SHEETING AND MATTING DECK COVERING SYSTEM, MIL-DTL-15562. Provide labor, services, equipment and materials for the removal of the entire existing Electrical Grade Sheeting and Matting and removal to substrate of only the damaged underlayment material, and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Electrical Grade Sheeting and Matting deck covering system on the entire deck, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| B011AA | Repair only of existing deck covering system: Electrical Grade Sheeting and Matting. | | | |
| MIL-DTL-15562 | 1,500 | SF | | $0.00 | |
| B011AB | Repair only of existing deck covering system: Electrical Grade Sheeting and Matting Loose Lay). MIL-DTL-15562 | 1,500 | SF | $0.00 |
| B011 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | |
| B012 | INSTALL NEW: CARPETING DECK COVERING SYSTEM. Provide labor, services, equipment and materials for the installation of the new Carpeting deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work. | | |
NOTE: Applicable B001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| B012AA | Install new deck covering system: Carpeting | 300 | SY | $0.00 |
| B012 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE (U/i) | ESTIMATED PRICE PER UNIT OF ISSUE (U/i) | EXTENDED AMOUNT |
| B013 | REPAIR ONLY: CARPETING DECK COVERING SYSTEM. Provide labor, services, equipment and materials for the removal of the entire existing Carpeting and removal to substrate of only the damaged underlayment and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Carpeting deck covering system on the entire deck, in accordance with the requirements of the statement of work. | | | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| B013AA | Repair only of existing deck covering system: Carpeting | 300 | SY | $0.00 |
| B013 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B014 | INSTALL NEW: SOLID VINYL AND/OR VINYL COMPOSITION TILE DECK COVERING SYSTEM, MIL-PRF-32704. Provide labor, services, equipment and materials for the installation of the new Solid Vinyl and/or Vinyl Composition Tile deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work. | |
NOTE: Applicable B001 Sub-ELIN shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.
| B014AA | Install new deck covering system: Solid Vinyl Tile. | | |
| MIL-PRF-32704 | 500 | SF | $0.00 | |
| B014AB | Install new deck covering system: Vinyl Composition Tile. | | |
| MIL-PRF-32704 | 500 | SF | $0.00 | |
| B014 | ITEM NUMBER TOTAL | | $0.00 |
| ELIN | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | |
| B015 | REPAIR ONLY: SOLID VINYL AND/OR VINYL COMPOSITION TILE DECK COVERING SYSTEM, MIL-PRF-32704. Provide labor, services, equipment and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and the subsequent surface preparation, cleaning, and coating application. Installation of the new underlayment material and new Solid Vinyl and/or Vinyl Composition Tile deck covering system on removed areas only, in accordance with the requirements of the statement of work. | |
NOTE: Damaged deck area for repair shall not exceed 35% of the entire deck
| B015AA | Repair only of existing deck covering system: Solid Vinyl Tile. | | | |
| MIL-PRF-32704 | 500 | SF | | $0.00 | |
| B015AA | Repair only of existing deck covering system: Vinyl Composition Tile. | | | |
| MIL-PRF-32704 | 500 | SF | | $0.00 | |
| B015 | ITEM NUMBER TOTAL | 2 | | $0.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| B016 | INSTALL NEW: LOGOS AND/OR DECALS . Provide labor, services, equipment and materials for the installation of new Logos and/or decals in accordance with the requirements of the statement of work. | | | |
| B016AA | Install new deck covering system: Logos and/or Decals - Size 1 - 2 SF | 20 | EA | $0.00 |
| B016AB | Install new deck covering system: Logos and/or Decals - Size 2 - 4 SF | 20 | EA | $0.00 |
| B016AC | Install new deck covering system: Logos and/or Decals - Size 4 - 6 SF | 20 | EA | $0.00 |
| B016AD | Install new deck covering system: Logos and/or Decals - Size 6 - 8 SF | 20 | EA | $0.00 |
| B016AE | Install new deck covering system: Logos and/or Decals - Size 8 - 10 SF | 20 | EA | $0.00 |
| B016AF | Install new deck covering system: Logos and/or Decals - Size 10 - 12 SF | 20 | SF | $0.00 |
| B016 | ITEM NUMBER TOTAL | | | $0.00 |
| ELIN | | | | |
| ITEM NO. | SUPPLIES/SERVICES | ESTIMATED QUANTITY PER YEAR | UNIT OF ISSUE | | |
| (U/I) | ESTIMATED PRICE PER U/I | EXTENDED AMOUNT | | | |
| B017 | REMOVAL OF EXISTING DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 AND/OR MIL-D-23134. Provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work. | | | |
| B017AA | Removal of existing Chemical-Resistant Flooring (MIL-PRF-32584 Type IV) deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134. | 200 | SF | $0.00 |
| B017AB | Removal of existing Chemical-Resistant Flooring (MIL-PRF-32584, Type V) deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134. | 200 | SF | $0.00 |
| B017AC | Removal of existing Electrical Grade Sheeting and Matting, MIL-DTL-15562, deck covering system with insulating underlayment material conforming to MIL-D-18873 and/or MIL-D-23134. | 200 | SF | $0.00 |