Exhibit A is a Summary of Quantities document for the 101 W Main Workforce Housing Infrastructure project, involving the Town of Frisco and Frisco Sanitation District in Colorado. The document details two separate bid schedules (A and B) with comprehensive lists of construction and infrastructure work items, including clearing and grubbing, removal of existing infrastructure, earthwork, landscaping, utility installations, street improvements, and miscellaneous site work. The project involves constructing roadway, utility, and site infrastructure for a 54-unit workforce housing development, with estimated quantities for 67 line items in Bid Schedule A and 8 line items in Bid Schedule B. The town and district reserve the right to award schedules A and B to different contractors, and all work is to be completed per 2025 CDOT Standard Specifications for Road and Bridge Specifications.
The bid schedules include detailed quantities and units for various construction activities, such as removing asphalt and concrete, installing trees and shrubs, constructing sidewalks and curbs, laying ductile iron and HDPE pipes, installing valves and manholes, and providing traffic control. Specific notes indicate that certain bid items like Erosion Control include comprehensive management and maintenance, while Ductile Iron Pipe pricing includes all necessary connections and fittings. The document requires contractors to provide unit costs for each item, with the understanding that actual field quantities may vary from the estimated quantities. Mobilization costs include performance and payment bonds, and traffic control encompasses flagging, devices, inspections, and management for the project's duration.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP_101 W Main Workforce Housing Infrastructure.pdf | ||
| Exhibit B_Drawings_101 W Main RFP.pdf | ||
| Exhibit C_Sample Contract_101 W Main RFP.pdf | ||
| Exhibit D_Geotechnical Study_101 W Main RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A Summary of Quantities
Note: Quantities stated in the bid below are estimated quantities only and it is understood the actual quantities in the field may vary from those estimated. Actual quantities will be measured in the field, unless specified otherwise in the bid item descriptions. Work required in this section includes all expenses to complete the individual bid items per the plans and specifications. Unit bid prices, as quoted in the bid schedule, shall constitute full compensation for materials, labor, equipment, rentals, permits, overhead, profit, incidentals, risk, loss, damage, and all other items of work and expense required for the complete construction of each pay item per the plans and specifications. Any items or like item not specifically mentioned as a bid item is considered incidental to the project and all costs associated with these items must be included in the bid items listed.
Items below shall be completed per 2025 CDOT Standard Specifications for Road and Bridge Specifications unless noted otherwise for a bid item.
Bid Schedule A and Bid Schedule B will be awarded as two separate contracts (Bid Schedule A contracted with Town of Frisco and Bid Schedule B contracted with Frisco Sanitation District).
Town and District reserve the right to award Bid Schedule A and B to two different contractors.
Contractor shall provide unit bid cost for each item as follows:
BID SCHEDULE A
ITEM
CODE DESCRIPTION QTY UNIT UNIT
COST TOTAL COST
1 CLEARING AND GRUBBING 1.0 LS
2 REMOVAL OF ASPHALT 2985.0 SY
3 REMOVAL OF SIGN 8.0 EACH
4 RELOCATE SIGN 4.0 EACH
5 REMOVE/ABANDON WATER SERVICE 1.0 LS
6 REMOVE/ABANDON WATER MAIN 1.0 LS
7 REMOVE/ABANDON SEWER SERVICE 1.0 LS
8 REMOVE 24" HDPE CULVERT 32.0 LF
9 REMOVAL OF STREET LIGHT 5.0 EACH
10 REMOVAL OF STAIRS 1.0 EACH
11 REMOVAL OF TREE 20.0 EACH
12 REMOVAL OF PLANTER 2.0 EACH
13 REMOVAL OF GUARDRAIL 80.0 LF
14 REMOVAL OF CONCRETE 862.0 SY
15 REMOVAL OF FENCE 120.0 LF
16 ASPHALT PLANING/MILLING (2") 400.0 SY
17 EROSION CONTROL 1.0 LS
18 EARTHWORK/GRADING 1.0 LS
19 POTHOLING 30.0 HOUR
20 DECIDUOUS TREE (2 INCH CALIPER) 30.0 EACH
21 DECIDUOUS TREE (1.5 INCH
CALIPER) 4.0 EACH
22 EVERGREEN TREE (6 FOOT) 10.0 EACH
23 EVERGREEN TREE (8 FOOT) 9.0 EACH
24 DECIDUOUS SHRUB 38.0 EACH
25 EVERGREEN SHRUB 5.0 EACH
26 ORNAMENTAL GRASS 66.0 EACH
27 ORNAMENTAL TREE 3.0 EACH
28 NATIVE GRASS REVEGETATION 1.0 ACRE
29 TOPSOIL 600.0 CY
30 IRRIGATION SYSTEM 1.0 LS
31 ROCK MULCH 1206.8 SY
32 LANDSCAPE MULCH 1314.4 SY
33 CRUSHER FINES 91.6 SY
34 PAVING BRICK 2242.9 SY
35 PLASTIC EDGER 686.7 LF
36 BOULDERS 32.0 EACH
37 BOULDER RETAINING WALL 340.0 SF
38 BENCH TREE WALL 7.0 EACH
39 SEATING SLAB 7.0 EACH
40 DOG WASTE STATION 1.0 EACH
41 BIKE RACK 5.0 EACH
42 AGGREGATE BASE COURSE (CLASS 6) 379.0 CY
43 CONCRETE SIDEWALK (6 INCH) 931.2 SY
44 CONCRETE CURB RAMP 111.6 SY
45 CONCRETE PAN 6.9 SY
Total Bid Schedule A __________________________
46 CURB & GUTTER TYPE 2 (SPECIAL) 1302.0 LF
47 7" CONCRETE PAD 15.4 SY
48 HOT MIX ASPHALT (GRADING SX)
(75) (PG 58-28) 316.4 TON
49 CONNECT TO EXISTING WATER LINE 2.0 EACH
50 6 INCH DUCTILE IRON PIPE 130.0 LF
51 10 INCH DUCTILE IRON PIPE 210.8 LF
52 10 INCH VALVE AND VALVE BOX 1.0 EACH
53 6 INCH VALVE AND VALVE BOX 1.0 EACH
54 6 INCH PLASTIC SEWER SERVICE PIPE
(PVC_ 23.0 LF
55 8" HDPE PIPE 21.0 LF
56 12" HDPE PIPE 111.0 LF
57 18" HDPE PIPE 38.0 LF
58 AREA INLET (12 INCH) 1.0 EACH
59 THERMOPLASTIC MARKINGS 1.0 LS
60 SIGN POST 20.0 EACH
61 SIGN PANEL 20.0 EACH
62 STREET LIGHT (CUSTOM) 10.0 EACH
63 2 INCH CONDUIT 372.0 LF
64 TYPE ONE PULL BOX 3.0 EACH
65 CONSTRUCTION SURVEYING 1.0 LS
66 MOBILIZATION 1.0 LS
67 TRAFFIC CONTROL 1.0 LS
BID SCHEDULE B
ITEM
CODE DESCRIPTION QTY UNIT UNIT COST TOTAL COST
1 REMOVE/ABANDON EXISTING
SEWER MAIN 205.3 LF
2 MANHOLE (SEWER) 3.0 EACH
3 8 INCH PLASTIC SEWER PIPE (PVC) 210.0 LF
4 MODIFY MANHOLE (SEWER) 1.0 EACH
5 SEWAGE BYPASS PUMPING 1.0 LS
6 CONSTRUCTION SURVEYING 1.0 LS
7 MOBILIZATION 1.0 LS
8 TRAFFIC CONTROL 1.0 LS
Total Bid Schedule B __________________________
Total Bid (Schedule A + Schedule B) __________________________
*Erosion Control bid item shall include installation and maintenance of all bmps shown in plans, erosion control management, sediment removal, and all other erosion control per the plans and specifications for duration of project.
**Ductile Iron Pipe bid item shall include all connections, fittings, tees, and other items necessary for water line installation.
***Mobilization shall include performance and payment bonds.
****Traffic Control shall include flagging, traffic control devices, traffic control inspections, and traffic control management for duration of project.