Exhibit A - Statement of Work_.pdf
PDF 138 KB Posted
- Attached to
- Town of Hartman Water System Operations
- Solicitation number
- DQ1 RFAA 2027000025 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Statement of Work for the Town of Hartman Water System Operations, prepared by the Colorado Division of Homeland Security and Emergency Management (DHSEM) in coordination with the Colorado Department of Public Health and Environment (CDPHE), Prowers County, and the Department of Local Affairs (DOLA). The project involves temporarily transferring operational responsibility of the abandoned Town of Hartman drinking water system to DHSEM under Colorado Senate Bill 26-157. The Town of Hartman serves approximately 61 people through 45 service connections and requires a groundwater system operator holding minimum Class C Treatment and Class 1 Distribution certifications. Key operational requirements include maintaining 2.0 mg/L free chlorine residual at the Entry Point and greater than 0.2 mg/L in the Distribution System, conducting weekly visual inspections and chlorine residual measurements, performing monthly total coliform compliance sampling, systematically flushing the distribution system, and remediating the current boil water advisory. The contractor must establish a Drinking Water Portal account for administrative updates, participate in monthly coordination meetings with identified agencies, implement a communication framework with residents, and report emergency incidents to a designated hotline within specified timeframes. The contract begins July 1, 2026.
The Statement of Work does not specify contract pricing, duration terms, or renewal options. Immediate infrastructure and security actions required include securing facility access, installing new locks on treatment infrastructure, coordinating with law enforcement for on-site monitoring, inventorying equipment and chemicals, establishing electrical service to the treatment facility, and potentially engaging private security for staff coverage. Reporting requirements include submitting certified lab results to the Drinking Water Portal by the 10th of the following month, distributing Tier 1 public notices within 24 hours for critical issues such as E. coli detection or boil water advisories, and submitting Tier 2 notices within 30 days for compliance failures. Key contacts include DHSEM representatives Marci Linton (720-377-4644) and Paul Moreno (720-838-1944), and CDPHE Compliance Specialist Zeenath Khan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A – Statement of Work Page 1 of 3
Exhibit A – Statement of Work
Division of Homeland Security and Emergency Management DHSEM Scope of Work Summary for the Town of Hartman Water System Operations
1. Project Background
a. Purpose: To temporarily transfer the drinking water system operational responsibility of the abandoned Town of Hartman water system to the Colorado Division of Homeland Security and Emergency Management (DHSEM) per Colorado Senate Bill 26-157.
b. Facility Profile: Town of Hartman is a groundwater community system
c. (PWSID: CO0150500) serving ~61 people via 45 service connections.
d. Certified Operator Classification: Level "C" Treatment (gas chlorine) and Level "1"
Distribution.
e. Core Goals:
i. Maintain routine disinfection, operations & maintenance, and specific compliance sampling to protect public health.
ii. Take necessary steps to lift the boil water advisory and maintain that status.
2. Personnel, Coordination, and Communication
a. Operator in Responsible Charge (ORC): Hire an ORC with minimum Class C Treatment and Class 1 Distribution certifications.
b. Submittals: Establish a Drinking Water Portal account for administrative updates and data submission.
c. Coordination: Monthly coordination meetings with Prowers County, DOLA, CDPHE, DHSEM, and the contract operator.
d. Communication: Develop and implement an agreed-upon communication framework involving the contractor, the coordination parties listed above, and resident communications.
Exhibit A – Statement of Work Page 2 of 3
3. Immediate Infrastructure and Security Actions
a. Facility Information and Access: Coordinate with Prowers County to secure access, inventory equipment, and obtain utility billing records, if available (such as a power utility bill).
b. Physical Security: Install new locks on treatment infrastructure and
c. coordinate with law enforcement for contract operator on-site monitoring.
d. Equipment Inventory: Identify all necessary chemicals (chlorine gas), equipment rental agreements, certified drinking water lab analysis, and sampling supplies.
e. Personnel Security: Staff presence in the town may require specific safety
f. and security considerations. When necessary, engage law enforcement or private security to provide coverage and assistance.
g. Power Sustainability: Establish continued Power service to the water
h. treatment facility to continue on-going service.
4. Remedy the Boil Water Advisory
a. Disinfection: Operate the chlorine system to maintain 2.0 mg/L free chlorine throughout the storage tank and distribution system.
b. Flushing: Upon start-up of operational control, systematically flush the distribution system in consultation with the department.
c. Sampling: Collect required bacteria and chlorine residual tests to demonstrate safety.
d. Documentation: Submit documentation photos, a written summary of corrective actions, flushing procedures, and lab results to CDPHE.
5. Operational Standards and Monitoring
a. Treatment Target: Maintain 2.0 mg/L free chlorine at the Entry Point (EP) and > 0.2 mg/L in the Distribution System (DS).
b. Weekly Tasks: Measure and log entry point chlorine residual; if less than
0.2 mg/L, sample every 24 hours until restored.
c. Monthly Tasks: Collect required total coliform compliance and chlorine residual samples.
d. Inspections: Conduct weekly visual inspections of the well, treatment plant, storage tank, and distribution system and document the findings, as appropriate (e.g., photos of the tank’s roof, photos of the chlorine log, etc.).
Exhibit A – Statement of Work Page 3 of 3
6. Emergency and Compliance Reporting
a. Incident Hotline: Report emergencies (e.g., E. coli positive, pressure loss, treatment issues, and tampering) immediately to 1-877-518- 5608.
b. Public Notice (PN): Distribute Tier 1 notices (e.g., E. coli or boil water advisory) within 24 hours and Tier 2 notices (e.g., failed residual) within 30 days, in consultation with CDPHE.
c. Reporting Deadlines:
i. Lab Results: Ensure the certified drinking water lab submits data to the drinking water portal by the 10th of the following month.
ii. Site Visit Logs and Corrective Actions Summaries: As specified by the Department.
7. Key Project Contacts
a. DHSEM Contact: Marci Linton 720-377-4644 or Paul Moreno 720-838-1944
b. CDPHE Compliance Specialist: Zeenath Khan - CDPHE She Her
c. Contract Start Date: July 1, 2026 mailto:zeenath.khan@state.co.us mailto:zeenath.khan@state.co.us mailto:zeenath.khan@state.co.us
| Exhibit A – Statement of Work |
| Division of Homeland Security and Emergency Management DHSEM Scope of Work Summary for the Town of Hartman Water System Operations |
| 1. Project Background |
| e. Core Goals: |
| 2. Personnel, Coordination, and Communication |
| 3. Immediate Infrastructure and Security Actions |
| 4. Remedy the Boil Water Advisory |
| 5. Operational Standards and Monitoring |
| 6. Emergency and Compliance Reporting |
| c. Reporting Deadlines: |
7. Key Project Contacts