Exhibit A - Statement of Work.docx
DOCX document 28 KB Posted
- Attached to
- AAHA/ Capitol Cafeteria Furniture
- Solicitation number
- DQ1 AAHA 2026000373 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Statement of Work (SOW) for the Colorado State Capitol cafeteria furniture procurement project. The project requires the procurement, delivery, storage, assembly, and installation of specified cafeteria furniture for the Colorado State Capitol building. Bidders must provide exact furniture items as identified in Attachment 1 - Furniture Specifications, with no substitutions, alternates, or equivalent products permitted. The project timeline specifies that all furniture must be received and installed during the state legislature's recess period, with a completion window from June 1, 2026 through December 1, 2026. Contractors must submit a proposed schedule with their bid response estimating the complete receipt of all ordered furniture and the time required for installation. The evaluation criteria include technical approach, experience and qualifications, project management and scheduling, and cost proposal, with demonstrated experience on similar projects valued between $150,000 and $250,000 required.
The maximum budget allocation for this competitive solicitation is $250,000, with itemized costs required for furniture purchases, installation, and shipping. The contractor bears full responsibility for procurement, manufacturer coordination, lead time verification, and all storage costs until the State Project Manager authorizes installation and provides written acceptance. A 2.5% retainage will be held for the duration of the manufacturer's warranty period, with prompt payment following warranty expiration. The contractor must provide all manufacturer warranties upon final acceptance and manage warranty claims with manufacturers during the warranty period. All furniture must remain secured and insured by the contractor while in storage, with the State assuming ownership only after delivery, installation completion, and written acceptance from the State Project Manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Furniture Specifications.pdf | ||
| Attachment 4 - State of Colorado Purchase Order Terms and Conditions.pdf | ||
| Attachment 2 - Furniture Layout - Reference Only.pdf | ||
| Exhibit B1 - Pricing.docx | DOCX document | |
| Exhibit B - Pricing.xlsx | XLSX spreadsheet | |
| Exhibit C - Bidder Response Form.doc | DOC document | |
| DQ1 AAHA 2026-0373 - State Capitol Cafeteria Furniture.pdf | ||
| Attachment 3 - Warranty Information.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DQ1 AAHA 2026-0373
Exhibit A – Statement of Work
Exhibit A - Statement of Work (SOW) Cafeteria Furniture for the Colorado State Capitol to include but not be limited to Procurement, Delivery, Assembly, and Installation.
The maximum budget is $250,000.
This is a competitive solicitation. Bidders are encouraged to provide their best bid pricing and response narratives.
1. Overview The purpose of this Statement of Work (SOW) is to define the requirements for the procurement, delivery, storage, assembly, and installation of specified cafeteria furniture for the Colorado State Capitol.
2. Reference Specifications Bidders must provide the exact furniture items identified in Attachment 1 - Furniture Specifications which include:
· Manufacturer name
· Model/Manufacturer’s identification number
· Finish specifications
· Dimensions
· Upholstery or material requirements
· Accessories or options, where applicable An Item number for purposes of this solicitation is included in Attachment 1 – Furniture Specifications and in Exhibit A – Pricing sheet to ensure that Bidder pricing is aligned correctly to the specified furniture.
Bidders shall not propose substitutions, alternates, or “equivalent” products. Only the exact furniture specified on Attachment 1 – Furniture Specifications will be accepted.
The Furniture Specifications are incorporated into this solicitation as Attachment 1 – Furniture Specifications
3. Contractor Responsibilities
3.1 Procurement of Specified Furniture
· The Contractor shall purchase all furniture items exactly as listed in Attachment 1 - Furniture Specifications.
· The Contractor is responsible for verifying all manufacturer lead times, production schedules, and availability.
· The Contractor shall coordinate directly with the manufacturers to ensure accurate ordering and timely delivery.
· The State will have no involvement with the ordering, shipping, and delivery processes developed by the Contractor.
3.2 Storage Requirements
· The Contractor shall receive all furniture shipments at their own facility or their designated storage location.
· The Contractor shall store all items at no additional cost to the State until all pieces have been received and installation has been authorized by the State Project Manager.
· Storage conditions must protect furniture from damage, moisture, temperature extremes, and unauthorized access.
· Furniture in storage remains the property of the bidder and must secured and insured accordingly.
· The State will take ownership following completion of delivery and installation and written acceptance has been provided by the State Project Manager.
3.3 Verification of Delivered Goods
Upon receipt of each shipment, the Contractor shall:
· Inspect all items for damage, defects, or discrepancies.
· Confirm that each item matches the exact manufacturer and model number as specified in Attachment 1 – Furniture Specifications.
· Document any issues with delivered furniture and notify the State’s Project Manager within 48 hours.
· Replace any incorrect or damaged items at no cost to the State.
· Contractor shall provide written notification to the State Project Manager when all furniture has been received, verified to be correct per the specifications, and is available for installation.
3.4 Delivery to Project Site
When authorized by the State’s Project Manager, the Contractor shall:
· Deliver all furniture to the designated building loading dock or staging area.
· Coordinate delivery schedules with the State Project Manager.
· Provide all labor, equipment, and materials necessary for safe transport into the building.
· On same level as the entry door.
3.5 Unpacking and Waste Removal
The Contractor shall:
· Unpack all furniture items.
· Remove and properly dispose of all packaging materials, pallets, and debris off‑site.
· Ensure no packaging waste is left in the building or surrounding areas.
3.6 Assembly and Installation
The Contractor shall:
· Assemble all furniture according to manufacturer instructions.
· Install and place all items in the locations designated in the State’s furniture layout plans, incorporated in the solicitation as Attachment 2 – Furniture Layout, and in accordance with the directions of the State Project Manager.
· Ensure all items are level, stable, and fully functional.
· The Contractor shall complete the installation of electrical outlets or USB ports for furniture that is designated for this equipment so that it is ready for connection to electrical power. Brady shouldn’t this already be part of the furniture? Installed correctly by the manufacturer.
· A State electrician will perform the connection.
· Following connection to power, the Contractor shall test and verify that outlets or USB ports are functioning correctly.
· Coordinate with the State’s Project Manager for final placement adjustments.
3.7 Walkthrough and Acceptance
Upon completion of installation, the Contractor shall:
· Conduct a walkthrough with the State’s Project Manager and a punch list of any items that need to be corrected will be developed.
· Verify that all items have been delivered, assembled, and placed correctly.
· Address any deficiencies identified during the walkthrough.
· Provide a final inventory list confirming all items match the Furniture Specifications.
· The State Project Manager will provide written acceptance
4. Schedule Requirements
· All furniture must be received and installed while the State Legislature is in recess. The time frame for completion of the installation processes is from June 1, 2026 through December 1, 2026.
· The Contractor shall provide a proposed schedule estimating the complete receipt of all ordered furniture and an estimate of the time required for installation with the Bid Response.
· The State will promptly authorize installation after June 1, 2026 following receipt of notice from the Contractor that all furniture has been received and verified.
· Any changes to established schedules must be approved by the State’s Project Manager.
5. Warranty and Support
· The Contractor shall provide all manufacturer warranties to the State upon final acceptance.
· The Contractor shall ensure that any warranty claims during the warranty period are addressed with the manufacturer and that the solutions are implemented.
· To ensure that the Contractor is in conformance with above requirement, the State will require a retainage of 2.5% of the total cost of the furniture for the term of the warranty.
· Check with accounting Laurie, Maryam and Rich.
· The State will promptly make payment of the retainage amount following the expiration of the warranty period.
· Warranty periods and retainage are specific for each Item.
6. Contractor Qualifications Bidders must demonstrate:
· Experience with commercial furniture procurement and installation.
· Ability to store furniture in locations that conform to the requirements of Section 3.2 Storage Requirements
· Ability to manage deliveries and installations of similar scale buildings which are open to public access.
7. Evaluation Criteria
| Category |
| Description |
| A. Technical Approach |
| Quality and clarity of the bidder’s plan for procurement, storage, delivery, assembly, and installation. Includes understanding of the Statement of Work and Furniture Specifications. |
| B. Experience & Qualifications |
| Demonstrated experience with commercial furniture procurement and installation of similar size and complexity. ($150,000 to $250,000 in total value). Includes references, past performance, and staff qualifications with current contact information. |
| C. Project Management & Schedule |
| Realistic and detailed schedule; approach to coordination with the State regarding furniture delivery schedules; warehouse conformance to SOW requirements and logistics planning. |
| D. Cost Proposal |
| Total cost with itemized costs for furniture purchases, installation, and shipping. Provides clarity of pricing, and completeness of the cost breakdown. Must conform to the exact specified furniture. |