- ODOT District 12 Sanding Rock Production
- Solicitation number
- S-73000-00011701
- Issued by
- Gilliam County, Oregon
About this file
This document contains the Special Provisions for the District 12 Sanding Rock Production 2024 Project, a state-level highway construction project managed by the Oregon Department of Transportation. The work consists of providing 15,000 cubic yards of crushed sanding aggregate to be stockpiled at the Rose and Bone Quarry site located approximately 12.7 miles southeast of Spray, Oregon. The project has specific requirements for material source development, environmental protection, blasting methods, and stockpiled aggregate quality and delivery. A pre-work meeting with the ODOT Geologists is required prior to occupying the material source. No separate payment will be made for the work performed under this contract, as it will be included in the payment for the appropriate contract items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid.Cover.Sheet.docx | DOCX document | |
| Exhibit E Material Source Narrative~4.pdf | ||
| Invitation.To.Bid_Final~1.docx | DOCX document | |
| 00011701 Preliminary.Results.xlsx | XLSX spreadsheet | |
| Exhibit B Plans~6.pdf | ||
| Sample.Contract_Final.docx | DOCX document | |
| 00011701 Intent.To.Award.xlsx | XLSX spreadsheet | |
| Carter & Co First Tier Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
FOR HIGHWAY CONSTRUCTION
OREGON DEPARTMENT OF TRANSPORTATION
SALEM, OREGON
ROCK PRODUCTION
DISTRICT 12 SANDING ROCK PRODUCTION 2024 PROJECT
JOHN DAY
GRANT COUNTY
OCTOBER 2024
OREGON DEPARTMENT OF TRANSPORTATION
FOR
Rock Production District 12 Sanding Rock Production 2024 Project
John Day Highway Grant County
PROFESSIONAL OF RECORD CERTIFICATION:
Seal w/signature
I certify the Special Provision Section(s) listed below are applicable to the design for the subject project for material source rock production and stockpiling. Modified Special Provisions were prepared by me or under my supervision.
Sections 00235, 00335 and 00680
FINAL ELECTRONIC DOCUMENT AVAILABLE UPON REQUEST
Date: 2024.09.25 09:51:07 -07'00'
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
WORK TO BE DONE
SECTION 00165 - QUALITY OF MATERIALS
SECTION 00210 - MOBILIZATION
SECTION 00235 - AGENCY PROVIDED MATERIAL SOURCES
SECTION 00290 - ENVIRONMENTAL PROTECTION
SECTION 00335 - BLASTING METHODS AND PROTECTION OF EXCAVATION
BACKSLOPES
SECTION 00680 - STOCKPILED AGGREGATES
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 1
WORK TO BE DONE
The Work to be done under this Contract consists of the following:
1. Provide aggregate in stockpile, at the specific place of delivery.
2. Perform additional and Incidental Work as called for by the Specifications and Plans.
APPLICABLE SPECIFICATIONS
The Specifications that are applicable to the Work on this Project is the 2024 edition of the "Oregon Standard Specifications for Construction", as modified by these Special Provisions.
All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.
CLASS OF PROJECT
This is a State Project.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 2
SECTION 00165 - QUALITY OF MATERIALS
Comply with Section 00165 of the Standard Specifications modified as follows:
00165.35(e) Certificate of Origin of Construction Materials – Replace this subsection, except for the subsection number and title, with the following:
When a certificate of material origin for construction materials is specified, complete the form furnished by the Engineer as required by 00160.20(d) for Federal-aid projects.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 3
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00235 - AGENCY PROVIDED MATERIAL SOURCES
Section 00235, which is not a Standard Specification, is included in this Project by Special Provision.
Description
00235.00 Scope - This Work consists of utilizing Agency provided prospective or mandatory material source as the Contractor elects or as required for the construction of the Contract.
00235.01 Material Source Specific Requirements - The following prospective material source, for the production of crushed sanding aggregate, that may warrant investigation and consideration for use by the Contractor on this Project is as follows:
(a) Prospective Material Source, Rose and Bone Creek Quarry:
• Source Number - OR- 12-002-5
• DOGAMI Number - 12-0058
• Location - Approximately 12.7 miles southeast of Spray, OR on OR 19, John Day
Highway in the E ½ NE ¼ of Section 31 and SE ¼ SE ¼ Section 30, T. 9 S., R. 26 E., W.M.
• Access - Adjacent east of MP 106 of OR 19
• Available Area for Equipment Setup, Stockpiling, and Processing Aggregate:
• Existing - 3 acres
• Development - 0 acres
00235.03 Laws - Conduct operations within the material source according to all applicable State, county, and federal laws including mining and fire laws. Provide, operate, and maintain wildland firefighting equipment appropriate for the current fire levels on-site at all times during all material source operations.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 4
00235.04 Permits - Copies of the Plans, permits, agreements and the material source narrative for the material source are available for inspection at the Project Manager's office.
Operations within the material source shall conform to the stipulations and conditions of these documents and to all of the requirements of the Contract.
Subsection Source Name Documents 00235.01(a) Rose and
Bone Creek Quarry
Department of Geology and Mineral Industries (DOGAMI) Permit; County Land Use Permit
00235.05 Pre-Work Meeting - Before occupying the material source, attend the pre-work meeting at the material source with the Engineer and the following owners or representatives:
Subsection Source
Name Contact Names and phone numbers
00235.01(a) Rose and Bone Creeks Quarry
ODOT Geologist – Bobbi Jean Cummiskey;
Email: Bobbi.Jean.Cummiskey@ODOT .oregon.gov, Phone: (541) 316-9921 ODOT Geologist – Scott Billings;
Email: Scott.D.Billings@ODOT .oregon.gov, Phone: (541) 410-6693
00235.06 Source Occupancy - Coordinate material source occupancy with the Engineer.
The material source information listed in Table 00235-1 below shall be as shown. Do not operate beyond the material source Project boundary or in no Work area(s) as shown unless otherwise directed in writing.
Table 00235-1
Subsection Source Name Source items shown 00235.01(a) Rose and
Bone Creek Quarry work area boundary, property boundary, excavation area.
Existing stockpile, proposed stockpile, existing access road, existing safety berm, proposed safety berm, no work area, oversize stockpile, reject fines stockpile, scalpings stockpile, stockpile and processing area, bench access road
00235.07 Source Development - If proposing changes to the material source development plan, submit a source development plan as an unstamped Working Drawing according to
00150.35. Do not begin Work in a material source until the source development plan has been approved in writing by the Engineer.
Develop a site-specific Erosion and Sediment Control Plan for the material source according to 00280.04 and submit it to the Engineer at or before the pre-work meeting. Construct stormwater control berm(s) as needed to control runoff. Do not allow any materials, including sediments, Aggregate or crushing by-products to enter into waterways or Wetlands.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 5
Develop a site-specific Pollution Control Plan for each material source according to 00290.30(b), and submit it to the Engineer at or before the pre-work meeting. Include the following requirements in the Pollution Control Plan:
• Do not discharge waste or by-product if it contains any substance in concentrations that could contaminate Soils or result in harm to fish, wildlife, or water sources.
• Store all potentially hazardous materials and solid waste in a manner that prevents seepage into the ground or groundwater sources. Lined sumps or pits are allowable options for storage. If pits or sumps are used, construct adequate berms or provide other measures to prevent breaching of the pits or sumps.
• For materials capable of causing water pollution if discharged, locate storage facilities in an area that prevents spillage into waterways or Wetlands.
Construction
00235.40 General - All vehicles and Equipment, prior to entering the site for the first time, and each subsequent time if the vehicle has left the Roadway outside the construction Project limits, shall be steam cleaned of all debris (soil, dirt, plant parts, and vegetative matter) before being brought back to the site. Notify the Engineer before moving each vehicle onto the site.
Certify, in writing, that the Equipment has been steam cleaned.
00235.41 Restrictions and Protection of Resources - Comply with the following for all operations within the material source:
• Protect cultural resources according to 00290.50.
• Protect migratory birds according to 00290.36(a).
• Clear trees and shrubs and strip and stockpile soil overburden between September 1 and March 1. Requested modifications to this requirement must be submitted in writing, 14 calendar days prior to source occupancy, to the Engineer. Do not utilize, contaminate, or disperse material from existing stockpiles. If existing stockpiles interfere with the Contractor’s operations, move the stockpiles to other locations within the material source area as directed, at no additional cost to the Agency.
• Limit mineral and Aggregate extraction, crushing, processing, and Equipment operation activities including drilling activities to the hours of 7:00 a.m. to 6:00 p.m., Monday through Saturday unless modifications to these hours are requested in writing and approved by the Engineer. Do not conduct any operation on Sundays or legal holidays, as defined in ORS 279C.540.
00235.42 Source Setup - Before proceeding with Work in the material source, the following apply:
(a) Access:
• For material source Rose and Bone Creeks Quarry 00235.01(a) routine road maintenance activities such as grading and watering of the access road do not need review or approval. Maintain or develop drain dips, water bars, road crowning, in-slopes and out-slopes during road maintenance.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 6
• For material source Rose and Bone Creeks Quarry 00235.01(a) realign and regrade the bench access road as needed. Construct the road with a width of 12 feet and a reasonably uniform grade, no steeper than 50 percent (1V:2H), for access to the upper bench by tracked vehicles.
• For material source Rose and Bone Creeks Quarry 00235.01(a) use overburden or existing, loose and non-stockpiled material or imported or clean soil or a combination of clean soil and rock, to construct a safety berm along the top edge of the new excavation or existing slopes as shown. Maintain a 10-foot buffer between the top edge of the excavation or slope and the toe of the safety berm. Construct the berm 3 feet high, with side slopes of 1V:2H.
(c) Overburden - Before excavating, including drilling and blasting when required, strip all soil overburden from within the excavation area, and from areas to be developed as access road(s), and incorporate into the safety berm as shown. Incorporate grass and small shrubs into the safety berm. Do not remove grass or small shrubs from the overburden. Maintain a minimum 10-foot buffer strip between the toe of the overburden safety berm, and the excavation area or the toe of the Aggregate stockpiles. Smooth and contour overburden safety berms to form side Slopes no steeper than 1V:2H.
00235.43 Blasting - Perform blasting operations according to this Section and Section 00335, except that perimeter controlled blasting as described in 00335.40(a) is not required in the material source.
For material source Rose and Bone Creeks Quarry 00235.01(a) restrict blasting to the hours of 9:00 a.m. to 5:00 p.m. Monday through Friday. Do not blast on Saturdays, Sundays, or legal holidays as defined in ORS 279C.540.
00235.44 Source Operations - The following apply during material source operations:
• Construct slopes, benches, and floor of the excavation area as shown.
• To control dust, apply water to material source access, haul road(s), and crushing and processing operations.
• Stockpile scalpings and reject fines in separate and accessible stockpiles as shown.
• For material source Rose and Bone Creeks Quarry 00235.01(a) if the Contractor chooses to utilize this material source, maintain the condition of OR19 at the accesses at all times. Provide traffic control related to ingress and egress movements in a manner that allows a safe work zone and safe passage of vehicles.
00235.45 Source Clean-up - The following apply at the completion of operations:
• Leave no loose material on the site exceeding 1 foot diameter, except as noted below.
Process existing oversize material, and all material loosened in the source by the Contractor that meets quality requirements, with the following exception(s):
• For material source Rose and Bone Creeks Quarry 00235.01(a) a maximum of 100cubic yards of oversize material with a maximum dimension of 2.5 feet may be stockpiled in the material source. Consolidate oversize material as shown.
• Place all excess produced Aggregate remaining at the end of operations in separate and accessible stockpiles on Agency owned or controlled property in areas designated by the Engineer, at no additional cost to the Agency.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 7
• Leave the material source haul road and bench access road open. Do not rip or block the roads except a few boulders greater than approximately three feet in diameter may be used to block off access to the upper bench areas.
• Remove all loose, hanging or potentially dangerous Rock on or above the excavated surface.
• Pile and burn all construction slash and combustible debris resulting from use and development of the source, including the preexisting refuse identified at the pre-work meeting, even if it is from outside the material source project boundary except for grass and small shrubs that are incorporated into the overburden. Comply with all open burning regulations in effect at the time of source occupancy. If burning is not allowed, all construction slash and combustible debris become the property of the Contractor, to be treated as noncombustible and removed from material source.
00235.46 Seeding:
• No seeding is required.
00235.47 Source Vacating - Before vacating the material source the following apply:
• Remove all structures, noncombustible debris, and equipment from the material source, even if it was pre-existing, except for grass and small shrubs incorporated into the overburden.
• Remove solid waste and hazardous material from the site and dispose of properly.
These include, but are not limited to, bag-house sludge or fines, lime, excess liquid asphalt, rejected and excess asphalt mixture, plant cleanings, materials placed in sumps, tires, pipes, belts, screens and truck cleanings. Provide documentary evidence of proper disposal and verify the amount of material removed.
• If a spill or dumping has occurred or if a spill or dumping is suspected to have occurred, the Contractor shall clean up the contaminated materials according to Section 00290.
After clean up, the Engineer may, sample and test materials at the spill or dumping locations to verify the clean up has been completed. If the Engineer’s verification testing demonstrates remaining contamination, the Contractor shall perform additional clean up until the requirements of Section 00290 including 00290.20(g) are met
• Attend a post-work meeting at the material source to evaluate material source rehabilitation work with the Engineer and attendees listed under 00235.05.
Measurement
00235.80 Measurement - No measurement of quantities will be made for Work performed under this Section, Payment
00235.90 Payment - No separate or additional payment will be made for Work performed under this Section. Payment will be included in payment made for the appropriate items under which this Work is required.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 8
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.20(c)(2) Clean Fill - Add the following paragraph to the end of this subsection:
Manage all excavated soil that does not meet the definition of clean fill according to Section 00294.
00290.51 Protection of Sensitive Cultural Sites - Add the following to the end of this subsection:
There are sensitive cultural sites or areas of high probability for cultural resources on this Project. At the time of preparation of the Plans, 1 site was identified.
The Region Environmental Coordinator for this Project is Tayton Duby.
The Agency Archaeology Representative for this Project is Alex New.
All contact with the Agency Archaeology Representative and the Region Environmental Coordinator shall be through the Engineer.
Meet with the Engineer at least 10 Calendar Days prior to beginning ground disturbing activities to discuss sensitive cultural sites on the Project. Required attendees include:
• The Contractor’s supervisory personnel.
• Subcontractors, including contract archaeological monitors, and supervisory personnel who will be involved in ground disturbing activities.
• Agency archaeology representative or region environmental coordinator.
• When applicable, tribal representative(s) or monitor(s).
For cultural resources, prior to beginning On-Site Work, install work zone lath and flagging around no work zones, as shown or as directed.
00290.90 Payment - Add the following paragraph(s) to the end of this subsection:
No separate or additional payment will be made for work zone fencing.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 9
SECTION 00335 - BLASTING METHODS AND PROTECTION OF EXCAVATION
BACKSLOPES
Comply with Section 00335 of the Standard Specifications.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 10
SECTION 00680 - STOCKPILED AGGREGATES
Comply with Section 00680 of the Standard Specifications modified as follows:
Add the following subsection:
00680.11(c) Sanding Aggregates - Provide sanding Aggregates meeting the following requirements:
(1) Grading - Furnish clean, hard, and durable Aggregate in stockpiles meeting the following grading requirements:
Percent Passing Sieve Size (by Weight)
1/2" 100 3/8" 80 - 95 1/4" 10 - 40 No. 8 0 - 6 No. 40 0 - 2
Perform sieve analysis according to AASHTO T 27.
Scalp the Rock or Gravel material from which the Aggregates are produced on a screen, the entire surface of which has openings not less than 1/2 inch in size. After the material has passed over the scalping screen, it shall contain not more than 5% by weight of material passing the 1/2 inch sieve. If quarry Rock is furnished, apply this requirement to the material after it has passed through the primary crusher. In addition 95% of the quarry Rock shall pass a 8 inch sieve following primary crushing.
(2) Elongated Pieces - Elongated pieces in Aggregate larger than 1/4 inch shall be determined according to ODOT TM 229, with the proportional caliper device set at a ratio of 5:1, and shall not exceed 10 percent by weight of the material retained on the1/4 inch sieve.
(3) Fractured Faces - Provide Aggregates consisting of broken stone, crushed gravel, or a combination of both. Crush Aggregate such that at least 90% by weight of the total aggregate retained on the No. 8 and larger sieves is fractured on two faces, as determined according to AASHTO T 335.
00680.40(a) Source Sites - Replace this subsection, except for the subsection number and title, with the following:
Prepare and develop the source site according to Section 00235.
District 12 Sanding Rock Production 2024 Project, Contract, October 2024 11
00680.42 Places of Delivery - Add the following to the end of this subsection:
Deliver 15,000 cubic yards of crushed sanding Aggregate, and stockpile at the stockpile and processing area indicated on the Material Source Development Plan, located at Rose and Bone Quarry, OR19 MP 160 as shown.
00680.70 Cleaning Up Source Sites - Replace this subsection, except for the subsection number and title, with the following:
Clean up the source sites according to Section 00235.