This document is an Exhibit A Scope of Work (SOW) for Kohler Generator Preventive Maintenance issued by the South Dakota Army National Guard (SDARNG) for contract number 25RFP13711. The SOW details comprehensive monthly and bi-annual maintenance requirements for a 350kW Kohler standby generator and automatic transfer switch located at Camp Rapid Building 420 in Rapid City, South Dakota. The maintenance services must be performed by a factory-trained and certified technician with a minimum of 5 years of Kohler generator experience, working within the SDARNG's established work week of Tuesday through Friday from 6:30 AM to 5:00 PM.

The maintenance procedures include monthly tasks such as inspecting the generator per original equipment manufacturer (OEM) recommendations, checking fluid levels, testing battery systems, and examining various mechanical components. Specific bi-annual requirements include fluid sampling and analysis in April and October, with additional annual transfer switch maintenance in October. The contractor is responsible for providing all necessary supplies and materials, with no additional reimbursement allowed. The SOW mandates a 12-month unlimited warranty on all installed parts and materials, and requires the contractor to attend a pre-maintenance meeting and submit detailed documentation, including a Contractor Verification Form, before receiving payment for services.

View the file

Other files

File Type Posted
Exhibit B SOW CAT Gen -_.pdf PDF
RFP Document.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A Page 1 of 2 February 2025 Generator Specifications – Kohler

EXHIBIT A

SPECIFICATIONS FOR

KOHLER GENERATOR PREVENTIVE MAINTENANCE

SOUTH DAKOTA

25RFP13711

PART 1 - GENERAL

1.01 General Requirements

1. All personnel performing the services included in this specification shall meet the following applicable experience and certifications:

a. All services on standby generator and transfer switch equipment shall be performed or directly supervised by an original equipment manufacturer factory trained and certified technician with a minimum of 5 years of Kohler standby generator installation, start up, maintenance, and repair experience.

2. The South Dakota Army National Guard (SDARNG) work week is Tuesday through Friday from 6:30 AM to 5:00 PM. The Contractor will only be allowed access to each facility during these hours.

3. Prior to any work beginning, review the equipment and procedure schedules and submit to the SDARNG Construction and Facilities Management Office (CFMO) a work schedule that clearly defines the dates that each service shall be rendered at the facility.

a. The Contractor shall notify the CFMO 72 hours prior to any deviation from the submitted work schedule.

b. Any work performed prior to providing a work schedule or 72-hours notice will be at the Contractor’s expense.

4. Prior to any work beginning, designate a single point of contact who is authorized to sign the Contractor Verification Form (to be provided by the CFMO) and who will be the point of contact for any issues.

5. Prior to any work beginning, attend a Pre-Maintenance Meeting with the CFMO’s Preventive Maintenance Manager at Camp Rapid at a time to be agreed upon by the Contractor and the CFMO.

a. The Contractor shall submit their work schedule, single point of contact, Certificates of Insurance, and employer ID number (W-9) to the CFMO at or before this meeting.

b. Any work performed prior to the Pre-Maintenance Meeting will be at the Contractor’s expense.

6. Prior to authorization of payment, along with an itemized invoice and signed state voucher, submit to the CFMO a completed, typed, and signed Contractor Verification Form (a Microsoft Office Excel Worksheet .xlsx file provided by the

CFMO).

a. Any deficiencies found while rendering services shall be reported immediately, as well as noted on the Contractor

Verification Form.

b. The Contractor Verification Form shall include the services rendered, a list of the consumables, supplies, and materials used, any deficiencies that were found, and recommendations.

1.02 Locations:

The Contractor shall perform the Required Services at the following SDARNG facilities:

Camp Rapid Building 420, 2823 W. Main St., Rapid City, SD 57702

1.03 Required Services:

1. Render all services listed in Part 3 upon the equipment listed in Part 2 during the scheduled month as prescribed per item in Part 3.

2. Cleaning supplies and solvents shall be accompanied by corresponding Material Safety Data Sheets.

3. Installed parts shall be new and meet or exceed original equipment manufacturers specifications, subject to approval by the CFMO. The Contractor shall be responsible to obtain a purchase order from the CFMO prior to purchasing or installing any parts outside of the work described in this document.

4. The Contractor shall provide 12 month unlimited warranty from the date of service or installation on all installed parts and materials. The Contractor shall make repairs as needed at no additional cost if the repair is caused by poor workmanship or faulty parts and/or materials.

5. Procurement of consumables/supplies/materials per manufacturer requirements per operation and maintenance manuals for services to be performed on the equipment shall be sole responsibility of the Contractor.

a. Payment for consumables/supplies/materials shall be considered incidental with no additional payment or reimbursement allowed.

Exhibit A Page 2 of 2 February 2025 Generator Specifications – Kohler

PART 2 - MATERIALS

2.01 Equipment Schedule:

The Contractor shall perform services as defined in Parts 1 and 3 of this document on the following list of equipment.

1. Camp Rapid Building 420 Generator List includes, but is not limited to:

a. Standby Generator 350kW Kohler

b. Automatic Transfer Switch

PART 3 - EXECUTION

3.01 Procedure Schedule: Contact Mr. Bradley Stege, SDARNG Operations and Maintenance, Preventative Maintenance Manager

(605)737.6564 to coordinate facility access/scheduling adjustments.

All Facilities:

1. Generator Procedure list to be performed monthly:

a. Inspect set per OEM recommendations.

b. Check oil level.

c. Check coolant level.

d. Check coolant heater.

e. Check and clean air filter.

f. Check and test battery charging system.

g. Drain fuel filter report indications of moisture.

h. Check and test antifreeze and DCA concentration.

i. Check and adjust drive belt tension.

j. Check fuel level.

k. Drain exhaust condensate trap (if applicable).

l. Check and test starting batteries.

m. Check generator air outlet.

n. Clean and inspect crankcase breather.

o. Check radiator hoses for wear and cracks.

2. Generator Procedure list to be performed April and October:

a. Sample and analyze fluids, provide test results and recommendations.

3. Automatic Transfer Switch Procedure list to be performed in October:

a. Clean & inspect transfer switch.

b. Perform annual operation test per O&M manual.

c. Change the display battery.

PART 1 - GENERAL
1.01 General Requirements
PART 2 - MATERIALS
PART 3 - EXECUTION