Exhibit A - Schedule of Values is a bid document from the Housing Department of the Seminole Tribe of Florida for a generator installation project at the Big Cypress Reservation. The solicitation seeks qualified contractors to provide standby generator installation services, specifically involving the furnishing and installation of a generator, transfer switch, regulator, piping, and a pre-cast concrete pad. The project scope includes site preparation, equipment procurement, installation services, electrical connections, start-up testing, and project management. The document provides a detailed line-item breakdown of required services, with placeholders for bidders to input their specific pricing for each component.
The Schedule of Values outlines six primary project categories: General Requirements, New Materials/Equipment, Concrete Pad, Installation, Start Up & Test, and Project Management. Each category contains specific line items that bidders must price, including mobilization, site preparation, generator furnishing, concrete pad installation, electrical services, and testing. The document mandates that the Schedule of Values must be completed in full for bid eligibility, with no exceptions. Bidders are required to provide comprehensive contact information and are given the opportunity to list additional contacts. The form provides space for bidders to enter lump-sum costs and optional comments for each line item, with a total project cost calculation at the bottom of the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB-LD 115-2025.pdf | ||
| attachment-download.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions | |
| Thank you for your interest in responding to this solicitation. Below are the instructions for filling out this required document. | |
| "Contact Info" Tab | |
| 1 | Bidder will fill in their company's registered name in the yellow cell next to "Company Name:" |
| 2 | Bidder will fill in the remaining yellow cells with their name, business address, phone number, email address, and website address. |
| 3 | Should additional or secondary contacts be needed, Bidder may fill in the name, phone number, and email address of these additional contacts in the yellow cells provided. Listing additional contacts is not required. |
| "Schedule of Values" Tab | |
| 1 | Bidder will review each requirement and respond in the corresponding yellow cells under Column C with the lumpsum cost, unless otherwise instructed. Bidder may enter comments in Column G, if applicable. |
Contact Info
| Contact Info |
| Main Contact Information (required) |
| Company Name: |
| Number of Years in Business: |
| Business Contact Name: |
| Street Address: |
| City: |
| State: |
| Zip Code: |
| Business Contact Phone: |
| Business Contact Email: |
| Website Address: |
| Additional Contact Information (optional) |
| Business Contact Name: |
| Business Contact Phone: |
| Business Contact Email: |
Schedule of Values
| ITB-LD 115-2025 Generator Installation (Big Cypress) | ||||||
| EXHIBIT A - SCHEDULE OF VALUES* | ||||||
| Project Name: | ||||||
| LINE ITEM NO. | LINE ITEM DESCRIPTION | PRICE | UOM | QUANTITY | EXTENDED PRICE | COMMENTS (IF APPLICABLE) |
| 1.00 | General Requirements | |||||
| 1.01 | Start-up and mobilization/dumpster rental/trash removal | Lumpsum | 1 | $ - 0 | ||
| 1.02 | Site Preparation | Lumpsum | 1 | $ - 0 | ||
| 1.03 | Final clean | Lumpsum | 1 | $ - 0 | ||
| 1.04 | Project Lead Time | N/A | Calendar Days | N/A | Includes ordering and receipt of materials, building permit, installation, and final clean-up after receipt of order (ARO). | |
| 2.00 | New Materials/Equipment | |||||
| 2.01 | Furnish Generator as described in the SOW | Lumpsum | 1 | $ - 0 | ||
| 2.02 | Furnish or Connect to Transfer Switch(s) as described in the SOW | Lumpsum | 1 | $ - 0 | ||
| 2.03 | Furnish new regulator and pipping, anode bag. | Lumpsum | 1 | $ - 0 | ||
| 3.00 | Concrete Pad | |||||
| 3.01 | Furnish and install one (1) new 6-inch thick by 4'x9' Pre-Cast Monolithic Concrete pad rated for 3,000 lb. capacity per each generator with #5 rebar 12" on center. | Each | $ - 0 | |||
| 4.00 | Installation | |||||
| 4.01 | Generator installation services as described in the SOW (includes delivery and installation on concrete pad) and Electrical services (includes all wiring connections and wire sizes to specs, control wires from existing Transfer Switch to generator, etc.) | Lumpsum | $ - 0 | |||
| 5.00 | Start Up & Test Installed Generator | |||||
| 5.01 | Generator start-up service, generator test, and Transfer Switch test (includes 20 gallons of fuel for start-up, as described in SOW) | Lumpsum | $ - 0 | |||
| 6.00 | Project Management | |||||
| 6.01 | Project Management | Lumpsum | $ - 0 | |||
| TOTAL: | $ - 0 | |||||
| *NOTES: | ||||||
| - SOV MUST BE COMPLETED IN FULL TO BE ELIGIBLE FOR AWARD, NO EXCEPTIONS. | ||||||
| _______________________________________ | ||||||
| Corporate Officer or Owner (Signature) | Date | |||||