attachment-download.pdf

PDF 147 KB Posted

Attached to
Generator Installation (Big Cypress)
Solicitation number
ITB-LD 115-2025
Issued by
Highlands County, Clewiston City, Florida

About this file

This document is a Contractor Licensing Requirements notice from the Tribal Inspector's Department of the Seminole Tribe of Florida for the ITB-LD 115-2025 Generator Installation project located in Big Cypress. The document outlines specific licensing and permitting requirements for contractors interested in performing electrical generator installation work. Contractors must possess a State of Florida Certified Electrical Contractor license and will need to obtain specific permits including Electric Generator, LP/Gas, and Concrete Slab permits.

The licensing requirements mandate that the prime contractor and all subcontractors provide evidence of licensure to the Tribal Inspector's Department. Additional requirements include current liability insurance and workers' compensation coverage, or proof of exemption from workers' compensation. A licensed subcontractor will be required for LP gas installation and concrete slab work. The document emphasizes that the representations are based on preliminary information and may not represent a comprehensive list of all license categories, encouraging recipients to contact the division with any additional information that might affect licensure requirements.

View the file

Other files

File Type Posted
Exhibit A - Schedule of Values.xlsx XLSX spreadsheet
ITB-LD 115-2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tribal Inspector’s Department TP-01-19

SEMINOLE TRIBE OF FLORIDA

TRIBAL INSPECTOR’ DEPARTMENT

6363 TAFT ST. SUITE 308

HOLLYWOOD, FL. 33024

OFFICE: (954) 894-1080 FAX: (954) 898-1571

EMAIL: BUILDINGDEPT@SEMTRIBE.COM

CONTRACTOR LICENSING REQUIREMENTS

DATE: SEPTEMBER 5, 2025

TO: KAMILLE GOMEZ - PURCHASING DEPARTMENT

FROM: TRIBAL INSPECTOR’S DEPARTMENT

PROJECT NAME: ITB-LD 115-2025 – GENERATOR INSTALLATION (BIG CYPRESS)

BASED UPON A PRELIMINARY REVIEW, THE SCOPE OF SERVICES SET OUT IN THE CONTRACTOR DEFINITIONS FOR THE STATE OF FLORIDA CERTIFICATIONS AND/OR COUNTY LICENSES AND/OR STATE REGISTRATIONS LISTED BELOW SUBSTANTIALLY CORRESPOND TO THE CONTENTS OF THE SCOPE OF WORK PROVIDED FOR THE ABOVE- REFERENCED PROJECT. THE PRIME CONTRACTOR AND ALL SUBCONTRACTORS SHOULD PROVIDE EVIDENCE OF

LICENSURE TO THE TRIBAL INSPECTOR’S DEPARTMENT. ANY OF THE FOLLOWING:

STATE: CERTIFIED ELECTRICAL CONTRACTOR

OR,

COUNTY:

PLEASE NOTE THAT A LICENSED SUBCONTRACTOR SHOULD COMPLETE ALL WORK NOT WITHIN THE SCOPE OF THE ABOVE CONTRACTOR. ALL CONTRACTORS MUST HAVE CURRENT LIABILITY INSURANCE AND WORKER'S

COMPENSATION, OR PROOF OF EXEMPTION FROM WORKER'S COMPENSATION.

REQUIRED PERMITS: ELECTRIC GENERATOR, LP/GAS, CONCRETE SLAB (IF POURING CONCRETE SLAB). A

SUB CONTRACTOR WILL BE REQUIRED FOR THE LP GAS INSTALLATION AND CONCRETE SLAB.

THE REPRESENTATIONS CONTAINED HEREIN ARE BASED ON INFORMATION PROVIDED TO OUR DEPARTMENT REGARDING THE ABOVE-REFERENCED PROJECT AND MAY NOT REPRESENT A COMPREHENSIVE LIST OF ALL LICENSE CATEGORIES OR ELIGIBLE PROVIDERS. ADDITIONAL OR DIFFERING FACTS MAY AFFECT THE LICENSE CATEGORIES THAT MAY LEGALLY PERFORM THE WORK REQUIRED BY THE SAID PROJECT. RECIPIENTS ARE ENCOURAGED TO CONTACT THE DIVISION WITH ANY ADDITIONAL INFORMATION THAT MAY AFFECT LICENSURE

REQUIREMENTS.

SHOULD YOU HAVE FURTHER INQUIRIES PLEASE CONTACT US AT (954) 894-1080

mailto:BuildingDept@Semtribe.com

File details come from the government source that posted it. Updated .