Exhibit A - RRPR M28A2 Inert Warhead CDRL 12 April 2023.pdf
PDF 382 KB Posted
- Attached to
- Inert warhead for the Reduced Range Practice Rocket (RRPR) M28A2. Federal contract opportunity
- Solicitation number
- W31P4Q-23-R-0059
About this file
This document contains a collection of Contract Data Requirements Lists (CDRLs) for solicitation number W31P4Q-23-R-0059 seeking an inert warhead for the Reduced Range Practice Rocket (RRPR) M28A2. Key requirements include the submission of a quality program plan within 30 days of award, a manufacturing plan within 30 days of award, special packaging instructions 120 days prior to shipment, and various reports on hazardous materials management and quality assurance. Responses are due to the Army Materiel Command Contracting Command Redstone Arsenal on specified dates, with the Government providing approval or disapproval within outlined timeframes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W31P4Q23R0059-0005.pdf | ||
| W31P4Q23R0059-0004.pdf | ||
| Warhead Vendor Questions Responses.pdf | ||
| W31P4Q23R0059-0003.pdf | ||
| W31P4Q23R0059-0002.pdf | ||
| Solicitation W31P4Q23R0059-0001.pdf | ||
| Solicitation W31P4Q23R0059.pdf | ||
| Attachment 0002 - RRPR M28A2 Inert Warhead DSL 12 April 2023.pdf | ||
| Attachment 0001 -SOW RRPR M28A2 Inert Warhead.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A SESS
W31P4Q-23-R-0059
A001 Request for Variance (RFV)
DI-SESS-80640 E SOW Para 4.1 SFAE-MSL-STV
LT
A
D
ASREQ
N/A
ASREQ
SEE BLK 16
SFAE-MSL-STV 0 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Blocks 8, 10, 12 and 13: The contractor shall submit RFVs for temporary changes to Government controlled documents as required. Government will provide approval/disapproval of the first submission within 15 days. If disapproved, the contractor shall resubmit 15 days after receipt of Government comments.
Block 14: RFVs shall be delivered to the Government in searchable PDF format. Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil.
0 1 0
1 9
INERT WARHEAD FOR THE REDUCED RANGE PRACTICE
ROCKET: M28A2
26 Jul 202326 Jul 2023
A MGMT
A002 Data Accession List (DAL)
DI-MGMT-81453 B SOW Para 4.2.2 SFAE-MSL-STV
LT
N/A
D
SEMIA
N/A
180 DAC
SEMIA
SFAE-MSL-STV 0 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Block 14: Data Accession List shall be delivered to the Government in searchable PDF format.
Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil.
0 1 0
2 9
INERT WARHEAD FOR THE REDUCED RANGE PRACTICE
A MISC
A003 Technical Report - Study/Services Data Accessions List Supporting Documentation
DI-MISC-80508 B SOW Para 4.2.2 SFAE-MSL-STV
LT
N/A
D
SEE BLK 16
N/A
SEE BLK 16
SEE BLK 16
SFAE-MSL-STV 0 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Blocks 10, 12, and 13: The contractor shall submit documentation within 15 working days after notification from the Procuring Contracting Officer.
Block 14: Data Accession List supporting documentation shall be delivered to the Government in one or more of the MS Office document searchable PDF formats. Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil.
0 1 0
3 9
A QCIC
A004 Quality Program Plan (QPP)
DI-QCIC-81722 SOW Para 5.0 SFAE-MSL-STE
LT
A
D
SEE BLK 16
N/A
SEE BLK 16
SEE BLK 16
SFAE-MSL-STV 1 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Blocks 8, 10, 12, and 13: The contractor shall submit draft 30 days after contract award. The Government will provide comments within 30 days. The contractor shall submit final with incorporation of comments within 5 days after receiving comments. The Government will provide approval/disapproval of final within 5 days. Resubmit as required for program changes. Contractor format is acceptable.
Block 14: Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil. The data item shall be delivered in one or more of the MS Office documents or searchable PDF format.
1 1 0
4 9
A005 Technical Report-Study/Services First Article Inspection Report
DI-MISC-80508 B SOW Para 5.1 SFAE-MSL-STV
LT
A
D
SEE BLK 16
N/A
SEE BLK 16
ASREQ
SFAE-MSL-STV 0 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Blocks 8, 10, 12, and 13: The contractor shall submit 15 days after First Article Inspection completion. The Government will provide approval/disapproval NLT 15 working days after receipt.
The contractor shall resubmit within 15 days after disapproval. Subsequent submissions as required.
Block 14: Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil. This data item shall be delivered in one or more of the MS Office document or searchable PDF formats.
0 1 0
5 9
A006 Manufacturing Plan M28A2 RRPR Inert Warhead
DI-MGMT-81889 B SOW Para 6.0 SFAE-MSL-STV
LT
A
D See BLK 16
N/A
SEE BLK 16
SEE BLK 16
SFAE-MSL-STV 1 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Block 8, 10, 12, and 13: The contractor shall submit draft 30 days after contract award. The Government will provide comments within 30 days. The contractor shall submit final with incorporation of comments within 10 days after receiving comments. The Government will provide approval/disapproval of final within 5 days. Resubmit as required for program changes. Contractor format is acceptable.
Block 14: Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil. The data item shall be delivered in one or more of the MS Office documents or searchable PDF format.
1 1 0
6 9
A007 Hazardous Materials Management Program (HMMP) Plan
DI-MGMT-81398 D SOW Para 7.0 SFAE-MSL-STV
LT
A
D See BLK 16
N/A
120 DAC
ASGEN
SFAE-MSL-STV 0 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Blocks 8, 10, and 13: Government will provide approval/disapproval 30 days after receipt. If disapproved, the contractor shall resubmit 30 days after receipt of the government disapproval.
Contractor format is acceptable. Update with major changes to the program.
Block 14: Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil. The data item shall be delivered in one or more of the MS Office documents or searchable PDF format.
0 1 0
7 9
A008 Hazardous Materials Management Program (HMMP) Report
DI-MISC-81397 D SOW Para 7.0 SFAE-MSL-STV
LT
A
C
ANNLY
N/A
SEE BLK 16
SEE BLK 16
SFAE-MSL-STV 0 1 0
Block 9: (A) DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; Reason: Administrative or operational use and Export Controlled; Date of determination: 04 April 2023. Other requests for this document shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Blocks 8, 12, and 13: The contractor shall submit the first submission 30 days after end of contractor’s accounting year. Government will provide approval/disapproval 30 days after receipt.
If disapproved, the contractor shall resubmit 15 days after receipt of the government disapproval.
Block 14: Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil. The data item shall be delivered in one or more of the MS Office documents or searchable PDF format.
0 1 0
8 9
A PACK
A009 Special Packaging Instructions (SPI)
DI-PACK-80121 C SOW Para 8.0 SFAE-MSL-SFL
LT
A
D
SEE BLK 16
N/A
SEE BLK 16
SEE BLK 16
SFAE-MSL-STV 0 1 0
Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only; Reason: Administrative or Operational use and Export Controlled;
Date of determination: 04 April 2023. Other requests shall be referred to the STORM Project Office, ATTN: SFAE-MSL-STV, Huntsville, AL 35808.
(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 Ch. 3 dated 15 October 2018 for Technical Data delivered to the government with other than Unlimited Rights.
Blocks 8, 10, 12, and 13: The contractor shall deliver the Inert Warhead SPI NLT 120 days prior to shipment from the production facility. Government will provide approval/disapproval within 30 days after receipt. If disapproved, the contractor shall resubmit 14 days after receipt of Government disapproval. The same approval cycle applies.
Block 14: Electronic delivery of this data item shall be submitted to usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil. The data item shall be delivered in one or more of the MS Office documents or searchable PDF format.
0 1 0
9 9
CDRL CONTINUATION SHEET
1.0 Data Item Delivery Instructions
1.1 Data Item Delivery. Delivery of electronic documents shall be accomplished by uploading the required data items and Meta Data into STORM Net, https://mis.msl.army.mil/storm/. If STORM Net is unavailable the contractor shall submit required data items on a CD-ROM and notifying the STORM Data Manager via email (usarmy.redstone.peo-ms.mbx.pf-pdm@army.mil) that the document has been submitted per the contract requirements (CDRL). A data item shall be considered delivered as of the date that the document is received and/or the Transmittal of Delivery (TOD) is signed by the requiring office. Incomplete or incorrect data items shall be corrected by the contractor and resubmitted. The date received of the corrected data item will be recorded as the final date of delivery.
1.2 Alternative Data Item Delivery Methods. When a CDRL data item is due, the contractor shall notify the Government STORM Data Manager via email if there is a delivery problem. A mutually agreed to, or Government selected, alternative method of delivery to satisfy the delivery requirement will be established.
1.2.1 The use of alternative delivery methods IAW the above paragraphs shall not constitute a change to the contract and shall not be the basis of any equitable adjustment.
1.3 Meta Data Requirements. Meta data shall accompany all electronic documents delivered to the Government. The minimum required meta data include: Contract Name, Sequence Number, Contractor Name, Notice of Availability (NOA) Number, NOA Date, Return to Contractor Date, Approval Required, Draft, Document Title, Document Number, Document Revision, and Document Date.
2.0 STORM Net Access. The contractor shall request access to STORM Net through https://accountrequest.msl.army.mil/. The contractor shall have an Army Knowledge Online (AKO) email account, Public Key Infrastructure (PKI) Certificate and Visit Authorization Request on file with the STORM Security Office.
3.0 Classified Data. The contractor shall deliver classified data IAW DoD 5220.22-M on Compact Disk to:
OUTER PACKAGE:
Strategic and Operational Rockets and Missiles Attn: SFAE-MSL-STS 100 Secured Gateway Huntsville, AL 35808
INNER PACKAGE:
Strategic and Operational Rockets and Missiles Attn: SFAE-MSL-STS (POC'S NAME) 100 Secured Gateway Huntsville, AL 35808
The Transmittal of Data (TOD) shall be delivered electronically through STORM Net for all classified documentation.
https://accountrequest.msl.army.mil/
| CDRL Continuation Sheet 23 November 2021 STORM Net.pdf |
| CDRL CONTINUATION SHEET |
| 1.2.1 The use of alternative delivery methods IAW the above paragraphs shall not constitute a change to the contract and shall not be the basis of any equitable adjustment. |
| 2023-07-26T13:32:22-0500 | |
| LANIER-PARKER.ANDREA.DELENE.1230677570 |
| 2023-07-26T13:34:12-0500 | |
| SANDERS.HEATHER.MARIE.1272930933 |
File details come from the government source that posted it. Updated .