Attachment 0001 -SOW RRPR M28A2 Inert Warhead.pdf

PDF 151 KB Posted

Attached to
Inert warhead for the Reduced Range Practice Rocket (RRPR) M28A2. Federal contract opportunity
Solicitation number
W31P4Q-23-R-0059
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This statement of work outlines requirements for an inert warhead for the Reduced Range Practice Rocket M28A2. The U.S. Army identified a need for Multiple Launch Rocket System practice rockets, and this inert warhead mated to the M26 rocket motor will allow batteries to train with the same properties as tactical rockets at reduced ranges. Manufacturers must produce the inert warheads per the provided technical data package and quality standards, conduct first article inspections and production line validations, and implement hazardous materials and logistics plans. The Army Materiel Command Contracting Command at Redstone Arsenal is soliciting offers for this inert warhead under solicitation number W31P4Q-23-R-0059.

View the file

Other files for this federal contract opportunity

Other files attached to Inert warhead for the Reduced Range Practice Rocket (RRPR) M28A2., newest first.
File Type Posted
W31P4Q23R0059-0005.pdf PDF
W31P4Q23R0059-0004.pdf PDF
Warhead Vendor Questions Responses.pdf PDF
W31P4Q23R0059-0003.pdf PDF
W31P4Q23R0059-0002.pdf PDF
Attachment 0002 - RRPR M28A2 Inert Warhead DSL 12 April 2023.pdf PDF
Exhibit A - RRPR M28A2 Inert Warhead CDRL 12 April 2023.pdf PDF
Solicitation W31P4Q23R0059-0001.pdf PDF
Solicitation W31P4Q23R0059.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31P4Q-23-C-0015 14 Dec 2022

STATEMENT OF WORK (SOW)

INERT WARHEAD

FOR THE

REDUCED RANGE PRACTICE ROCKET: M28A2

Prepared by: Strategic and Operational Rockets and Missiles (STORM Project Office)

STATEMENT OF WORK (SOW)

INERT WARHEAD

FOR THE

REDUCED RANGE PRACTICE ROCKET: M28A2

1.0 SCOPE

This Statement of Work (SOW) defines the work to be performed by the contractor, as authorized by and subject to the terms and conditions of the contract, to manufacture the inert warhead for the Reduced Range Practice Rocket (RRPR) M28A2.

Background. The United States (US) Army Field Artillery community has identified a training need for the Multiple Launch Rocket System (MLRS) practice rockets. The RRPR M28A2 is a cost-effective solution to that need. An inert warhead is mated to the same rocket motor assembly used on the M26 Tactical Rocket to provide MLRS batteries an opportunity to train with a rocket pod that has the same properties as the tactical pod and to experience the same effects of firing a tactical rocket, but at reduced ranges.

2.0 APPLICABLE DOCUMENTS

The applicable top-level documents are contained in the Document Summary List (DSL), Attachment 0002 of the contract, by number, title, date, contract reference and category. The document versions specified on the DSL take precedence over the generic references (those without the revision letters) cited in the SOW.

3.0 REQUIREMENTS

The contractor shall provide the materials, labor, and management to manufacture inert warheads for the M28A2 in accordance with (IAW) Warhead Assembly RRPR Drawing 13540611, Attachment 0006.

4.0 CONFIGURATION AND DATA MANAGEMENT

4.1 The contractor shall prepare and deliver Engineering Change Proposals IAW

DI-SESS-80639 (A001) with Notices of Revision prepared and delivered IAW

DI-SESS-80642(A002).

4.2 When a variance from the design established by the Warhead Assembly RRPR Technical Data package (TDP) is required, the contractor shall prepare and deliver a Request for Variance (RFV) against the TDP IAW DI-

SESS-80640 (A003).

4.3 Data Management (DM) - The contractor shall implement a DM program to control and track the delivery of data items required by the Contract Data Requirements List (CDRL), DD Form 1423.

4.3.1 Data Submission - The contractor shall submit all data items electronically according to the instructions stated on the CDRL, DD Form 1423. Content of these electronic data items shall be IAW the Data Item Description (DID), as tailored by the DSL.

4.3.2 Data Accession List (DAL) - The contractor shall prepare and deliver a DAL IAW DI-MGMT-81453(A004). The contractor’s Configuration Management office shall provide individual documents listed on the DAL at the Government’s request. Upon notification from the Procuring Contracting Officer, the contractor shall furnish a copy of any requested documentation contained in the DAL IAW DI-MISC-80508(A005).

4.3.3 Distribution Statements and Export Control Warning - The contractor shall mark data items according to Government requirements, IAW DODI 5230.24. The contractor shall use the distribution statements identified in the CDRL, DD Form 1423.

5.0 QUALITY SYSTEM

The contractor shall establish a Quality System that meets the standards established by International Organization for Standardization (ISO) certification ISO 9001 or AS9100 and prepare and deliver a Quality Program Plan IAW DI- QCIC-81722(A009). The contractor shall provide controls of material, process, and product characteristics used to validate conformance to item requirements.

5.1 First Article The contractor shall conduct a First Article Inspection (FAI) IAW AS9102 to verify the manufacturing and inspection processes are adequate to produce products that are compliant with the drawing requirements. For new designs or redesigns, changes in vendors or production processes, or a break in production of greater than 12 months, the contractor shall perform a FAI. The contractor shall notify the Government 14 days prior to the FAI to allow coordination of travel, if travel is required in performance of this SOW. The contractor shall submit a first article inspection report using AS9102 as a guide.

The contractor shall prepare and deliver the first article inspection report IAW DI-

MISC-80508 (A008).

5.2 WELDING CERTIFICATION

The contractor shall demonstrate ability to meet American Welding Society (AWS) D17.1/D17.1M:2017 Class C Fusion Welding, to include personnel certification and training status.

6.0 PRODUCTION

The contractor shall utilize existing manufacturing processes or establish a production line or processes for the fabrication of the inert warhead. The contractor shall conduct a Production Line Validation (PLV) at the contractor's facility to verify and demonstrate manufacturing processes, tooling, work instructions, test procedures, and inspection processes to produce hardware that shall be compliant with the drawing requirements. The contractor shall correct any manufacturing issues identified during the PLV in order to reduce manufacturing risks during production. The contractor shall notify the Strategic and Operational Rockets and Missiles (STORM) Project Office 21 business days prior to the PLV to allow for coordination of travel for onsite Government participation and to witness the fabrication of the first article unit. Upon successful completion of the PLV, the Government will provide the contractor with a validated PLV certificate.

Manufacturing Plan. The contractor shall prepare and deliver a Manufacturing Plan which shall include the overall manufacturing strategy, facilities, manufacturing processes and methods, process flow, manpower plan, time-phased schedule for all production activities, and a capacity analysis that identify the capital equipment, tooling, and other requirements to meet a production capability for the contractor and major subcontractors. The Manufacturing Plan can be in a contractor’s format IAW CDRL A011 DI-MGMT-81889 The contractor shall notify the Government of any proposed changes or modifications to components, processes or the production line for evaluation, approval and to determine the need for a delta PLV. A break or lapse in production of more than 1 year or relocation of a validated production line shall require a PLV. Planning and commencement of the PLV shall be conducted prior to receipt and acceptance of hardware.

The contractor shall develop, implement, and maintain manufacturing planning documentation as baseline documentation for production. Documentation shall be made available for Government review onsite during the PLV upon request.

The manufacturing planning documentation shall include detailed assembly drawings, bill-of-materials, detailed parts list, tooling plans, operation process charts, production flow, work instructions, standard operating procedures, and operator instructions.

7.0 ENVIRONMENTAL

The contractor shall ensure that all contractors and subcontractor activities shall be in compliance with applicable federal, state and local environmental laws and regulations.

The contractor shall develop and deliver a Hazardous Materials Management Program (HMMP) Plan IAW DI-MGMT-81398(A007). In addition, the contractor shall prepare and deliver a HMMP Report IAW DI-MISC-81397(A006). The HMMP Reports shall identify via graphic or drawing the specific location of each hazardous material contained in the final end item(s).

The contractor shall report the data elements found in MIL-STD-882, Task 108, section 108.2.4 a, b, and d for Tracked hazardous materials (HAZMAT). The contractor shall report coatings (identified by MIL SPEC), functional fluids (e.g.

coolant, hydraulic fluid, lubricants, etc.), radionuclides (40 CFR 302.4, Appendix B) and energetics/solid rocket motor components (including Explosives Class Number) with the same 108.2.4 a, b, and d data elements. The contractor shall provide Material Safety Data Sheets or Safety Data Sheets for all reported materials.

The contractor shall report any HAZMAT, as defined in NAS 411-1, to be used for the maintenance, sustainment, and demilitarization of the end item under this contract. The HAZMAT shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number.

The contractor HAZMAT list shall be updated during performance of the contract whenever the contractor determines that any other material to be used in the maintenance, sustainment, and demilitarization of the end item under this contract is hazardous.

The contractor shall not use any Class I or Class II Ozone Depleting Chemical/Ozone Depleting Substance (ODC/ODS), identified by the lists at https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances, in the manufacture or support of items required by this SOW unless approved IAW Army ODS policy and/or Title 10 United States Code section 2302. All ODS alternatives must be in compliance with the U.S. Environmental Protection Agency Significant New Alternatives Policy program and identified as approved – per the specific application – in the lists at https://www.epa.gov/snap/snap-substitutes-sector. All ODS alternatives must also receive a Toxicity Clearance for the specific application from the US Army Public Health Center.

8.0 LOGISTICS

The contractor shall comply with the contract clause cited in Contract Section D – Packaging and Marking, for wood packaging material requirements.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances https://www.epa.gov/snap/snap-substitutes-sector https://www.epa.gov/snap/snap-substitutes-sector

The contractor shall prepare and deliver Special Packaging Instructions (SPI) IAW DI-PACK-80121(A010) for the Inert Warhead, and shall comply with the requirements of MIL-STD-2073-1. When commercial packaging is utilized, it shall reflect packaging performance criteria equal to, or better than, requirements specified in ASTM-D3951. All hardware shall be properly marked, packaged, and labeled IAW MIL-STD-129.

In order to protect hardware from damage as a result of weather conditions, the contractor shall furnish clean and sound closed-type equipment of sufficient size (but not in excess of capacity) to accommodate shipments.

File details come from the government source that posted it. Updated .