Exhibit_A_HVAC_and_Plumbing_Equipment_Lists.pdf

PDF 192 KB Posted

Attached to
HVAC and Plumbing Services for City of Urbana Facilities
Solicitation number
FY2027-ITB-215
Issued by
Champaign County, Illinois

About this file

Exhibit A is a facility and equipment listing document for the City of Urbana, Illinois HVAC and Plumbing Services contract opportunity. The document provides a comprehensive inventory of heating, ventilating, air conditioning, and plumbing equipment across multiple City of Urbana facilities, including Fire Stations #2 and #3, the Landfill Pump House, Landscape Recycling Center Shop, Urbana City Building, Urbana Civic Center, Urbana Parking Deck, Urbana Police Firing Range, Urbana Public Works, Urbana Fleet Facility, and Urbana Storage Facility. The listing includes equipment types such as furnaces, boilers, air handlers, ductless split units, unit heaters, convection heaters, circulation pumps, domestic hot water systems, exhaust fans, fan coil units, air-cooled condensing units, window air conditioning units, and related HVAC components. Equipment installation dates range from 1960 to 2025, with the majority of equipment installed between 1984 and 2022, indicating a diverse portfolio of systems at varying stages of lifecycle. The document explicitly states that this listing is intended for reference purposes only and may not be indicative of all items to be covered in the scope of work.

The document serves as a baseline inventory for the time and material general on-call and emergency service contract for repair, maintenance, and minor alterations to HVAC and plumbing systems at City of Urbana facilities. No pricing information, set-asides, contract terms, renewal options, funding sources, or award dates are specified in this exhibit document, as it functions solely as a reference guide to the equipment that may require service under the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A- FACILITY AND EQUIPMENT LISTING

The following facility and equipment listing is intended for reference purposes only and may not be indicative of all items to be covered in the scope of work.

Equipment Type Facility Installed Date

See Exhibit B Fire Station #2 1/1/2025

See Exhibit C Fire Station #3

Convection Heater Landfill Pump House 2/1/2008

Pump Landfill Pump House 1/1/2009

Domestic Hot Water Landscape Recycling Center Shop

Furnace 1 Landscape Recycling Center Shop 1/1/2005

Unit Heater 4 Landscape Recycling Center Shop 1/1/2005

Unit Heater 5 Landscape Recycling Center Shop

Window AC 5 Landscape Recycling Center Shop 4/7/2014

Window AC 6 Landscape Recycling Center Shop

In Wall Heat and AC Landscape Recycling Center Ticket Booth

Air Cooled Condensing Unit for AHU3 Urbana City Building

Air Handler 1 Urbana City Building

Air Handler 2 Urbana City Building 3/4/2014

Air Handler 3 Urbana City Building 1/31/2014

Boiler 1 Urbana City Building 1/1/1999

Boiler 2 Urbana City Building 1/1/1999

Boiler 3 Urbana City Building 1/1/2001

Building Automation System Urbana City Building 1/1/2022

Chilled Water Supply Urbana City Building 1/1/1999

Circ Pump Community Dev. Urbana City Building 1/1/2012

Circ Pump Police, Acct, Lobby Urbana City Building 1/1/1999

Circ Pump Station 1 Bay Urbana City Building 11/1/2016

Circ Pump Main Return Urbana City Building 1/1/2011

Foyer Convection Heat Urbana City Building 1/1/1999

Foyer Convection Heat Urbana City Building 1/1/2006

Foyer Convection Heat Urbana City Building 1/1/2010

Foyer Convection Heat Urbana City Building 1/1/1999

Domestic Hot Water Urbana City Building 1/1/1999

North Indoor Server Ductless Split Unit Urbana City Building 1/1/2020

North Outdoor Server Ductless Split Unit

Urbana City Building 1/1/2020

South Indoor Server Ductless Split Unit

Urbana City Building 1/1/2014

South Outdoor Server Ductless Split Unit

Urbana City Building 10/10/2014

Indoor UPTV Ductless Split Unit Urbana City Building 10/10/2014

Outdoor UPTV Ductless Split Unit Urbana City Building 10/10/2014

Exhaust Fan Urbana City Building 10/10/2014

Exhaust Fan Urbana City Building 3/11/2015

Exhaust Fan Urbana City Building 3/11/2015

Exhaust Fan Urbana City Building 1/1/1999

Exhaust Fan Urbana City Building 1/1/1999

Exhaust Fan Urbana City Building 1/1/1999

Fan Coil Stairwell Unit Urbana City Building 1/1/1999

Fan Coil Stairwell Unit Urbana City Building 1/1/1999

Station 1 Bay Fan Forced Heater Urbana City Building 1/1/1999

Station 1 Bay Fan Forced Heater Urbana City Building 1/1/1999

Station 1 Bay Fan Forced Heater Urbana City Building 1/1/1999

Station 1 Bay Fan Forced Heater Urbana City Building 1/1/1960

Station 1 Bay Fan Forced Heater Urbana City Building 1/1/1960

Supply Fan Control AHU1 Urbana City Building 1/1/1960

Return Fan Control AHU1 Urbana City Building 1/1/1960

Supply Fan Control AHU2 Urbana City Building 1/1/1960

Return Fan Control AHU2 Urbana City Building 1/1/2007

Supply Fan Control AHU3 Urbana City Building 1/1/2018

Chilled Water Pump Urbana City Building 1/1/2007

Return Fan Motor AHU1 Urbana City Building 1/1/2007

Return Fan Motor AHU2 Urbana City Building 1/1/2001

Sprinkler Total System Urbana City Building 1/1/2012

Supply Fan Motor AHU1 Urbana City Building

Supply Fan Motor AHU2 Urbana City Building 1/1/1999

Supply Fan Motor AHU3 Urbana City Building 1/1/1999

Domestic Hot Water Urbana Civic Center 1/1/2007

Exhaust Fan 1 Urbana Civic Center 1/1/1999

Baseboard Heat Urbana Parking Deck 1/1/2001

Domestic Hot Water Urbana Parking Deck

Electric Unit Heater Urbana Parking Deck

Window AC Urbana Parking Deck

In Wall Heat and AC Urbana Police Firing Range

Air Cooled Condensing Unit 4 Urbana Public Works

Air Cooled Condensing Unit 2 Urbana Public Works

Domestic Hot Water 1 Urbana Public Works 1/1/2002

Domestic Hot Water 5 Urbana Public Works 1/1/1993

Domestic Hot Water 11 Urbana Public Works 1/1/2014

Exhaust Fan 21 Urbana Public Works

Exhaust Fan 22 Urbana Public Works

Exhaust Fan 24 Urbana Public Works

Exhaust Fan 25 Urbana Public Works

Exhaust Fan 30 Urbana Public Works

Fan Forced Heater 17 Urbana Public Works

Fan Forced Heater 18 Urbana Public Works

Fan Forced Heater 19 Urbana Public Works

Fan Forced Heater 31 Urbana Public Works 1/1/1993

Furnace AC 2 Urbana Public Works

Furnace AC 4 Urbana Public Works 1/1/1993

Unit Heater 6 Urbana Public Works

Unit Heater 7 Urbana Public Works 1/1/2014

Unit Heater 8 Urbana Public Works 1/1/1993

Unit Heater 9 Urbana Public Works 1/1/2009

Unit Heater 10 Urbana Public Works 1/1/2009

Unit Heater 13 Urbana Public Works 1/1/2006

Unit Heater 14 Urbana Public Works 1/1/1984

Unit Heater 15 Urbana Public Works 1/1/2006

Unit Heater 16 Urbana Public Works 1/1/1984

Window AC 12 Urbana Public Works

Radiant Heating Urbana Public Works /Paint Shed

Air Cooled Condensing Unit 1 Urbana Fleet Facility

Air Cooled Condensing Unit 2 Urbana Fleet Facility

Domestic Hot Water Urbana Fleet Facility

Furnace AC 1 Urbana Fleet Facility 1/1/1998

Furnace AC 2 Urbana Fleet Facility 1/1/1998

Unit Heater 4 Urbana Fleet Facility

Unit Heater 5 Urbana Fleet Facility 1/1/1988

Unit Heater 6 Urbana Fleet Facility

Unit Heater 7 Urbana Fleet Facility

Unit Heater 8 Urbana Fleet Facility

Unit Heater 9 Urbana Fleet Facility

Unit Heater 3 Urbana Fleet Facility

Unit Heater 10 Urbana Fleet Facility

Unit Heater 1 Urbana Storage Facility Fire

Unit Heater 2 Urbana Storage Facility Fire

Unit Heater 3 Urbana Storage Facility Police 1/1/2007

Unit Heater 4 Urbana Storage Facility Police 10/1/2022

Unit Heater 5 Urbana Storage Facility PW

Unit Heater 6 Urbana Storage Facility PW

Tankless Water Heater Urbana Storage Facility Fire Dept 1/1/2022

File details come from the government source that posted it. Updated .