This is a Summary of Work exhibit for the Seminole County Board of County Commissioners in Florida, detailing project CC-7172-26/HSM for Rinehart Road Force Main Valve and Flow Meter Installation in Lake Mary. The project scope requires installation of five new 16-inch plug valves on an existing PVC force main located on the east side of Greenwood Boulevard and Rinehart Road, along with installation of a new 12-inch electromagnetic flow meter assembly and bypass line south of Greenwood Boulevard within a power easement north of Green Way Boulevard. The contractor must coordinate temporary shutdowns of the City of Lake Mary Primera Lift Stations (three stations) and the private Fountain Parke Lift Station to accommodate valve installations at stations 41+50 and 44+00 near the Fountain Parke Boulevard intersection. These shutdowns are restricted to weekend and nighttime hours from 9:00 PM to 5:00 AM, with the flow meter assembly requiring completion and operational status before the corresponding 16-inch plug valve installation. All other work may be sequenced at the contractor's discretion within the allowed timeframe while accommodating other on-site contractors.
The contractor bears full responsibility for securing vacuum trucks for pump-out operations at all designated lift stations, coordinating work schedules for employees and subcontractors, and managing utility locates, testing, and relocations. The County requires continuous 24/7 operation of existing facilities with contractor-provided bypass pumping as necessary to maintain sanitary sewer collection and transmission system operations during construction. The contractor must perform all required cutting and patching at no additional expense to the County, confine operations to permitted areas, and assume full responsibility for protection of stored materials and equipment on site. The Engineer's estimate for the project is $913,000. Bid documents are available through the Seminole County website at https://secure.procurenow.com/portal/seminolefl, and Minority/Women-Owned Business Enterprises are encouraged to participate. All responses constitute public records under Florida law.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rinehart Rd. FM Valves and Flow Meter Installation SUMMARY OF WORK September 29, 2025
01110-1
SECTION 01110
SUMMARY OF WORK
PART 1 GENERAL
1.01 Section Includes
Summary of work, other contracts, work sequence, operation of existing facilities, use of premises, County furnished products, coordination, cutting and patching
1.02 Summary of Work
The Project consists of the installation of five (5) new 16” valves on existing PVC force main located on the east side of Greenwood Blvd. and Rinehart Rd. in Lake Mary.
Construction also includes installation of a new 12” electromagnetic flow meter assembly and bypass line south of Greenwood Boulevard within the power easement (north of Green Way Boulevard).
1.03 Work Under Other Contracts – N/A
1.04 Work Sequence
A. The new 16” plug valves that are to be installed north and south of the Fountain Parke Blvd. Intersection (near stations 41+50 and 44+00) Will require temporary shutdown of the City of Lake Mary Primera Lift Stations and the private Fountain Parke Lift Station. The shutdowns of the existing lift stations are expected to require two line stops used for approximately three separate shutdown events.
The Contractor shall plan on the lift station shutdowns being allowed th take place on the weekends and at night only (from 9:00 PM to 5:00 AM)
B. The new flow meter assembly shall be installed and shall be operable before the new 16” plug valve is installed on the existing 16” force main located west of the new flow meter assembly.
C. All other Work may be sequenced at the Contractor’s choosing in order to complete the work in the allowed time frame while accommodating other contractors on site.
1.05 Operation of Existing Facilities
The County shall be able to operate existing facilities 24 hours per day, 7 days per week.
Provide bypass pumping as needed for operation of sanitary sewer collection and transmission system during construction.
1.06 Contractor Use of Premises
EXHIBIT A
Rinehart Rd. FM Valves and Flow Meter Installation SUMMARY OF WORK September 29, 2025
01110-2
Confine operations at the site to areas permitted by applicable laws, ordinances, permits, and by the Contract Documents. Do not unreasonably encumber the site with materials or equipment. Do not load structures with weight that will endanger the structure. The Contractor shall assume full responsibility for protection and safekeeping of products stored on the job site.
1.07 County Furnished Products – N/A
1.08 Coordination
A. The Contractor shall be fully responsible for the coordination of securing vacuum trucks as needed to pump out the City of Lake Mary Primera Lift Station No. 1, Primera Lift Station No. 2, Primera Lift Station No. 3, The new Century Development and the private Fountain Parke Lift Station.
B. The Contractor shall be fully responsible for the coordination of his work and the work of his employees, subcontractors, and suppliers and to assure compliance with schedules.
C. The coordination requirements of this Section are in addition to the requirements of the front end bidding documents issued by the County.
D. It is the Contractor’s responsibility to coordinate with all the utilities regarding locates, testing, or relocations.
1.09 Cutting and Patching
A. The Contractor shall, at no additional expense to the County, perform cutting and patching necessary to the completion of the Project. Perform cutting and patching in a manner to prevent damage to the structure or previously completed work.
B. Refinish surfaces as necessary to provide an even finish.
PART 2 PRODUCTS - Not Used
PART 3 EXECUTION - Not Used
END OF SECTION