Exhibit_A.pdf

PDF 108 KB Posted

Attached to
De-Ionization System Cylinder Maintenance
Solicitation number
IFB25-0170
Issued by
Orange County, Orlando City, Florida

About this file

This document is an Exhibit A Flow Diagram for De-ionization Systems from the Procurement and Contracts Division, detailing water filtration processes for three specific locations: Iron Bridge Laboratory, Iron Bridge Operations, and Water Conserv II. Each location has a unique water treatment workflow that transforms tap water through multiple filtration stages including filters (ranging from 1 to 0.2 microns), pumps, water softeners, carbon tanks, reverse osmosis (R.O.) membranes, storage tanks, de-ionization (D.I.) tanks, and ultraviolet (U.V.) light treatment before reaching the laboratory.

The flow diagrams demonstrate a sophisticated multi-stage water purification process, with each location having slight variations in equipment and number of filtration stages. Specific technical components include 20" and 10" filters, 1 and 0.2 micron specifications, water softeners, carbon tanks, R.O. membranes, storage tanks with vents, multiple D.I. tanks, recirculating pumps, and U.V. light treatment. The systems appear designed to progressively remove impurities and ions to produce highly purified water for laboratory use, with increasing complexity and filtration stages across the three different locations.

View the file

Other files

File Type Posted
De-Ionization_System_Cylinder_Maintenance.pdf PDF
De-Ionization_System_Cylinder_Maintenance.pdf PDF
Exhibit_A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

De-ionization System Cylinder Maintenance IFB25-0170

Procurement and Contracts Division Page: 1

EXHIBIT “A”

FLOW DIAGRAM FOR DE-IONIZATION SYSTEMS

1. IRON BRIDGE LABORATORY

Tap Water → 20” Filter, 1 micron → Pump → Water Softener → Carbon Tank →

10” Filter, 1 micron → R.O. Pre-Filter, 1 micron, 10”, → R.O. Membrane and 9-7/8” 1 micron filter → Storage Tank With Vent, 10” Filter, 0.2 micron, → Pump → D.I. Tanks (three) → Re-circulating Pump → D.I. Tank (1), polishing → U.V. Light → 20” Post Filter 0.2 micron →

LAB

2. IRON BRIDGE OPERATIONS

Tap Water → Pump → 20” Filter, 1 micron → Water Softener → Carbon Tank →

R.O, 10” Pre-Filter, 1 micron, → R.O. Membrane → Storage Tank → Pump →

10” Filter, 0.2 micron, → D.I. Tanks (two) → LAB

3. WATER CONSERV II

Tap Water → 20” Filter, 1 micron → Water Softener → Carbon Tank →

R.O. Pre-Filter, 1 micron, 10” → R.O. Membrane → Storage Tank With Vent, Filters (two), 0.2 micron, → Re-circulating Pump → D.I. Tank (4) → Big Blue 15-1

Filters (three), 0.2 micron, → U.V. Light → LAB

File details come from the government source that posted it. Updated .