Exhibit_A.pdf
PDF 2 MB Posted
- Solicitation number
- CC-6647-25/HSM
- Issued by
- Seminole County, Florida
About this file
This document is Exhibit A for a home reconstruction project issued by Seminole County Community Services Department in Sanford, Florida. The exhibit provides detailed technical specifications for rebuilding a single-family residence located at 1204 John Lord Street. The project requires a state-certified general contractor to demolish the existing structure and construct a new dwelling with approximately 1,100 square feet, featuring three bedrooms and two bathrooms. The total project timeline is 270 days from the permit notice to proceed, with specific time allocations for permits, variances, mobilization, construction, and project closeout.
The technical specifications outline comprehensive requirements for the reconstruction, including specific standards for site preparation, concrete work, masonry, framing, roofing, electrical, plumbing, HVAC, and finishing. The home must meet Seminole County's minimum reconstruction standards, with detailed guidelines for materials, installations, warranties, and quality expectations. Key specifications include using energy-efficient appliances, installing a hip roof, providing an attached one-car garage, meeting accessibility requirements, and using materials that comply with current building codes and American National Standards Institute (ANSI) guidelines. The project includes provisions for warranties ranging from one to ten years on various home components.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
0 0
25 Final Plumbing 1 -
- 0 0
0 0 0 0
26 Final Mechanical 1 - 0 0 27 Driveway/Walkway 1
- 0 0 24 Final Electrical 1 -
28 Final Insulation / Shelves 1 -
Draw 5 - Trim out - -
- 0 0
0 0
0 0
0 0 21 Int. Doors & Hardware 1 - 0 0 20 Trim Molding 1 19 Flooring 1 -
23 Septic Started 1 - 22 Cabinetry/Counter tops 1
18 Exterior Paint 1 - 0 0 17 Interior Paint 1 - 0
16 Lath/Stucco 1 - 0 0
- 0 0 14 Drywall & Texture 1 - 0 0 15 Tile Bathroom 1 - 0
Draw 4 - Rough In - -
13 Insulation Rough In 1 - 0 0 12 Rough Mechanical 1 - 0
0 0 11 Rough Electrical 1 - 0 0
- 0 0 9 Windows/Ext. Doors 1 - 0 0 10 Roofing 1 -
Draw 3 - Framing - - 8 Roofing Dry-In 1 - 0 7 Framing/Trusses Delivery 1 - 0
Block Walls/Lintels 1 -
- 0 0
0 0
Draw 2 - Slab Install - - 5 Slab Pour 1 - 0
4 Rough Plumbing Underground Slab 1 - 0 0
- 0 0 2 Footer, Rebar, Stem Wall 1 0 0 3 Rough Grade Lot/Slad Compaction 1 - 0
Draw 1 - Startup & Demo Cost - -
(I/E)
Balance To Finish (E-I)
Retainage
1 House Plans and Mobilization Cost 1 - - 0 0
Item # Description of Work Quanity Unit Price Scheduled Value
WORK
From Previous
Application
COMPLETE D
This Period
Materials Presently
Stored (Not in F or G)
Total Completed and Stored To Date
(F+G+H)
MASTER DRAW SCHEDULE
Project Address
COUNTY CONTRACT NO. PERIOD ENDING:
CONTRACTOR CIP#
A B C D E F G H I J K
AGREEMENT TITLE PAYMENT NO.
Draw 6 - Final & Driveway -
Totals - - -
- - 0 0
0 0
29 Appliances Installed Only 1 - 0 -30 Landscape/Sod 1
Draw 7 - Retainage - - - 0 0 31 1
| Draw schedule.pdf |
| Table 1 |
File details come from the government source that posted it. Updated .