This document is a Contract Data Requirements List (CDRL) that is part of Solicitation N3904024Q0133 for the procurement of a Nuclear Container. The CDRL lists four data deliverables required from the contractor: 1) Professional Engineer's Stamp for Calculations and Design, 2) Certification of Load Test, 3) Certification of Pre-Load Test, and 4) Certification of Post-Load Test. These deliverables are referenced in the Statement of Work paragraphs C.3.1 and C.3.3. The CDRL specifies that the data shall be submitted on a one-time basis, and distributed to the government via mail with no DD Form 250 required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 to Exhibit A(1).pdf | ||
| N3904024Q0133 RFQ V2.pdf | ||
| Attachment 2 PNSY OPSEC Contract Requirements 24-035(1)_Redacted.pdf | ||
| Attachment 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION-N3904024Q0133
PRINTED 8 OCTOBER 2021 PAGE 1 OF 4
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM: CONTAINER CATEGORY ____________
ITEM NO: 0001 CONTRACTOR
01 SEQ NO A001
02 DATA DESC PROFESSIONAL ENGINEER’S STAMP
03 SUBTITLE CALCULATIONS AND DESIGN
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.3.1
06 TECH OFFICE 2380.2
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS
SEQ. NO. A001
PREPARED BY ________________________________________________ DATE__________________ APPROVED BY ________________________________________________ DATE__________________
DD FORM 1423
PRINTED 8 OCTOBER 2021 PAGE 2 OF 4
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM: CONTAINER CATEGORY ____________
ITEM NO: 0001 CONTRACTOR
01 SEQ NO A002
02 DATA DESC CERTIFICATION OF LOAD TEST
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.3.2
06 TECH OFFICE 2380.2
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS
SEQ. NO. A002
PREPARED BY ________________________________________________ DATE__________________
PRINTED 8 OCTOBER 2021 PAGE 3 OF 4
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM: CONTAINER CATEGORY ____________
ITEM NO: 0001 CONTRACTOR
01 SEQ NO A003
02 DATA DESC CERTIFICATION OF PRE-LOAD TEST
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.3.3
06 TECH OFFICE 2380.2
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS
SEQ. NO. A003
PREPARED BY ________________________________________________ DATE__________________
PRINTED 8 OCTOBER 2021 PAGE 4 OF 4
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM: CONTAINER CATEGORY ____________
ITEM NO: 0001 CONTRACTOR
01 SEQ NO A004
02 DATA DESC CERTIFICATION OF POST-LOAD TEST
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.3.3.4
06 TECH OFFICE 2380.2
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS
SEQ. NO. A004
PREPARED BY ________________________________________________ DATE__________________
File details come from the government source that posted it. Updated .