Exhibit A.pdf
PDF 11 MB Posted
- Attached to
- 9MM Barrier Blind Cartridge Federal contract opportunity
- Solicitation number
- N6426723R0023a
About this file
This federal contract opportunity solicitation seeks proposals for a 9MM Barrier Blind Cartridge. The Department of the Navy Naval Sea Systems Command is soliciting proposals under solicitation number N6426723R0023a to procure 9MM Barrier Blind Cartridges. Offerors should submit proposals by the dates specified in the solicitation to be considered for award. The solicitation targets products or services related to 9MM ammunition and establishes pricing, delivery schedule, and other contractual terms for the procurement.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SEE SECTION B A MGMT
9mm Barrier Blind TBD TBD
A001 Integrated Production Schedule (IPS) Report
DI-MGMT-82075 SOW para 3.2.1 NSWC Corona RS42
LT
A D
ASREQ
N/A
SEE BLK 16
N/A
PPM 0 1
PM-AMMO PO 0 1
DCMA 0 1
0 3 0
BLK 4: Contractor's report format and content is acceptable subject to Government comments.
BLK 8: The Government requires thirty (30) calendar days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within seven (7) calendar days of receipt of comments. The Government requires fifteen (15) calendar days for approval disposition.
BLK 9: "DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only, Administrative and Operational Use, 01 August 2021. Other request for this document shall be referred to Naval Surface Warfare Center, Attn: RS40, 700 Ammunition Road, Fallbrook, California. 92028."
BLK 10,12: Contractor shall notify the TPOC via email within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during First Article Test (FAT)/Lot Acceptance Test (LAT) and any destructive / nondestructive test failures. The final report shall be submitted no later than thirty (30) calendar days after determining/conducting root cause/failure analysis. The Government will provide a response within fifteen (15) calendar days of initial submission. If further revisions are necessary, the Contractor shall have seven (7) calendar days to provide revisions.
BLK 14: Distribution shall be made electronically via email in accordance with BLK14a,14b and contract section C 3.2.1.
HILVA.MAILEI.ANN.1515818100
Digitally signed by
HILVA.MAILEI.ANN.1515818100
Date: 2023.02.02 11:25:36 -08'00'
WARD.KIMBERLY.JEANN
E.1290826108
Digitally signed by
WARD.KIMBERLY.JEANNE.1290826108
Date: 2023.01.31 21:22:42 -08'00'
01/31/2023
1 2 Adobe Professional 8.0
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SEE SECTION B A MGMT
9mm Barrier Blind TBD TBD
2 2
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SEE SECTION B A SESS
9mm Barrier Blind TBD TBD
A002 FAILURE SUMMARY AND ANALYSIS REPORT
DI-SESS-80255B SOW para 3.4.2 NSWC Corona RS42
LT
A D
ASREQ
N/A
SEE BLK 16
N/A
PPM 0 1
PM-AMMO PO 0 1
DCMA 0 1
0 3 0
BLK 4: Contractor's report format and content is acceptable subject to Government comments.
BLK 8: The Government requires thirty (30) calendar days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within seven (7) calendar days of receipt of comments. The Government requires fifteen (15) calendar days for approval disposition.
BLK 9: "DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only, Administrative and Operational Use, 01 August 2021. Other request for this document shall be referred to Naval Surface Warfare Center, Attn: RS40, 700 Ammunition Road, Fallbrook, California. 92028."
BLK 10,12: Contractor shall notify the TPCO via email within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during First Article Test (FAT)/Lot Acceptance Test (LAT) and any destructive / nondestructive test failures. The final report shall be submitted no later than thirty (30) calendar days after determining/conducting root cause/failure analysis. The Government will provide a response within fifteen (15) calendar days of initial submission. If further revisions are necessary, the Contractor shall have seven (7) calendar days to provide revisions.
BLK 14: Distribution shall be made electronically via email in accordance with BLK14a,14b and contract section C 3.4.2.
HILVA.MAILEI.ANN.1515818100
Digitally signed by
HILVA.MAILEI.ANN.1515818100
Date: 2023.02.02 11:29:10 -08'00'
WARD.KIMBERLY.JEANN
E.1290826108
Digitally signed by
WARD.KIMBERLY.JEANNE.1290826108
Date: 2023.01.31 21:25:32 -08'00'
01/31/2023
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SEE SECTION B A SESS
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SEE SECTION B A MGMT
9mm Barrier Blind TBD TBD
A003 CRITICAL CHARACTERISTICS CONTROL PLAN (CCCP)
DI-MGMT-81986 SOW para 3.5.1 NSWC Corona RS42
LT
A D
ONE/R
N/A
SEE BLK 16
SEE BLK 16
PPM 0 1
PM-AMMO PO 0 1
DCMA 0 1
0 3 0
BLK 8:The Government requires thirty (30) calendar days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within seven (7) calendar days of receipt of comments. The Government requires fifteen (15) calendar days for approval disposition. Approval is required prior to FAT or prior to initiation of production.
BLK 9: "DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only, Administrative and Operational Use, 01 August 2021. Other request for this document shall be referred to Naval Surface Warfare Center, Attn: RS40, 700 Ammunition Road, Fallbrook, California. 92028."
BLK 10, 12, 13: The Critical Characteristics Control Plan (CCCP) shall be submitted prior to First Article Testing (FAT) or initiation of production if FAT is not required.
Subsequent submissions of the CCCP are required within thirty (30) calendar days of the recommended change. The Government requires seven (7) calendar days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within seven (7) calendar days of receipt of comments.
BLK 14: Distribution shall be made electronically via email in accordance with BLK14a,14b and contract section C 3.5.1
HILVA.MAILEI.ANN.1515818100
Digitally signed by
HILVA.MAILEI.ANN.1515818100
Date: 2023.02.16 09:00:10 -08'00'
WARD.KIMBERLY.JEANN
E.1290826108
Digitally signed by
WARD.KIMBERLY.JEANNE.1290826108
Date: 2023.01.31 21:11:34 -08'00'
01/31/2023
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SEE SECTION B A MGMT
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SEE SECTION B A SAFT
9MM BARRIER BLIND TBD TBD
A004 Critical I(tem Characteristic List (CICL)
DI-SAFT-81988 SOW para 3.5.2.
LT
A D
120 DAYS A.W.
N/A
SEE BLK 16
N/A
PPM 0 1
PM-AMMO PO 0 1
DCMA 0 1
0 3 0
BLK 4: DID Section 4 sub-bullets e & g and Section 5 Media requirements are not applicable.
BLK 8: The Government requires forty-five (45) days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within fifteen (15) days of receipt of comments. The Government requires fifteen (15) days for approval disposition. The Critical Safety Item, Characteristic and Critical Defect Report shall be approved prior to FAT, if FAT is required, or prior to initiation of production.
BLK 9: "DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only, Administrative and Operational Use, 01 August 2021. Other request for this document shall be referred to Naval Surface Warfare Center, Attn: RS40, 700 Ammunition Road, Fallbrook, California. 92028."
BLK 10, 12, 13: The Critical Safety Item, Characteristic and Critical Defect Report shall be submitted no later than sixty (60) days prior to First Article Test (FAT) or initiation of production if FAT is not required. The Contractor shall incorporate any Government comments and redistribute the final document within fifteen (15) days of receipt of comments.
Critical Defect - Notification of critical defect shall be made to PCO within 24 hours of the event. Root cause investigation and corrective action and segregated suspect material use, shall be submitted to the Government for approval. Government will respond within 15 calendar days of receipt of original and any required revisions. Disposition will be provided by the TPOC.
Restart Request - Contractor shall submit request to restart to the Government for approval.
Government will respond within 3 business days of receipt. Disposition will be provided by the PCO.
Block 14: Distribution shall be made electronically via email in accordance with BLK14a,14b and contract section C 3.4.1.
HILVA.MAILEI.ANN.1515818100
Digitally signed by
HILVA.MAILEI.ANN.1515818100
Date: 2023.03.02 09:28:57 -08'00'
WARD.KIMBERLY.JEANN
E.1290826108
Digitally signed by
WARD.KIMBERLY.JEANNE.1290826108
Date: 2023.01.31 21:12:59 -08'00'
01/31/2023
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SEE SECTION B A SAFT
9MM BARRIER BLIND TBD TBD
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
CONTRACT DAT A REQUIREMENTS LIST Form Approved
(1 Data Item) 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT--- --
A. CONTRACT LINE ITEM NO.
See Section B
D. SYSTEM/ITEM I
E. CONTRACT/PR NO. F.CONTRACTOR
9mm Barrier Blind TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 Critical Safety Item, Characteristic and Critical Defect Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SAFT-80970A SOW para 3.5.3 NSWC Corona RS42
7. DD 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
ASREQ SEE BLK 16 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final D SUBMISSION Draft
A NIA NIA Reg Repro
16. REMARKS PPM 0 1
BLK 4: Contractor's report format and content is acceptable subject to Government PM-AMMO PO 0 1 comments. DCMA 0 1
BLK 8: The Government requires thirty (30) days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within seven (7) days of receipt of comments. The
Government requires fifteen (15) days for approval disposition.
BLK 9: "DISTRIBUTION STATEMENT D: Distribution authorized to Department of
Defense and U.S. DoD contractors only, Administrative and Operational Use, 01 August
2021. Other request for this document shall be referred to Naval Surface Warfare Center, Attn: RS40, 700 Ammunition Road, Fallbrook, California. 92028."
BLK I 0, 12: Contractor shall notify the TPCO via email within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during First Article Test (FAT)/Lot Acceptance Test (LAT) and any destructive / nondestructive test failures. The final report shall be submitted no later than thirty (30) calendar days after determining/conducting root cause/failure analysis. The Government will provide a response within fifteen ( 15) calendar days of initial submission. If further revisions are necessary, the Contractor shall have seven (7) calendar days to provide revisions.
Restart of production shall not occur until authorized by the PPM, unless previously addressed in the approved CCC Plan. The Government will respond to a restart request within 3 working days. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect material shall not be used without PPM approval.
like 1
BLK 14: Distribution shall be made electronically via email in accordance with
BLK14a,14b and contract section C 3.4.1.
15.TOTAL 0 3 0
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
HILVA.MAILEI.AN Digitally signed by
HILVA.MAILEI.ANN.1515818100
WARD.KIMBERL Y.JEANN DigitaJly signed by 01/31/2023
N.1515818100 Date: 2023.03.01 08:12:21 -08'00' WARD.KIMBERL Y.JEANNE.1290826108 E 1290826108 "'"" ' '
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
Adobe Professional 8. 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DAT A REQUIREMENTS LIST
A. CONTRACT LINE ITEM NO.
I
B. EXHIBIT
A I
C. CATEGORY:
SAFT
See Section B TDP __ TM __ OTHER
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO.
I
F.CONTRACTOR
9mm Barrier Blind TBD TBD
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SEE SECTION B A MGMT
9MM BARRIER BLIND TBD TBD
A006 CRITICAL PLAN OF ACTION (CPOA)
DI-MGMT-81996 SOW para 3.5.4 NSWC CORONA RS42
LT
A D
ASREQ
N/A
SEE BLK 16
SEE BLK 16
PPM 0 1
PM-AMMO PO 0 1
DCMA 0 1
0 3 0
BLK 8: The Government requires thirty (45) calendar days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within seven (7) calendar days of receipt of comments. The Government requires fifteen (15) calendar days for approval disposition.
BLK 9: "DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only, Administrative and Operational Use, 01 August 2021. Other request for this document shall be referred to Naval Surface Warfare Center, Attn: RS40, 700 Ammunition Road, Fallbrook, California. 92028."
BLK 10, 12, 13: The Contractor may voluntarily submit a CPOA for all critical characteristics as specified in the critical characteristic requirement. If contractor chooses to utilize the CPOA, it shall be updated and resubmitted on an annual basis from the date that the CPOA is approved.
BLK 14: Distribution shall be made electronically via email in accordance with BLK14a,14b and contract section C 3.5.4
HILVA.MAILEI.ANN.1515818100
Digitally signed by
HILVA.MAILEI.ANN.1515818100
Date: 2023.02.02 11:41:36 -08'00'
WARD.KIMBERLY.JEANN
E.1290826108
Digitally signed by
WARD.KIMBERLY.JEANNE.1290826108
Date: 2023.01.31 21:14:29 -08'00'
01/31/2023
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SEE SECTION B A MGMT
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SEE SECTION B A MGMT
9mm Barrier Blind TBD TBD
A007 Process Control Plan
DI-MGMT-82131 SOW para 3.6.1 NSWC Corona RS42
LT
A D
ASREQ
N/A
SEE BLK 16
N/A
PPM 0 1
PM-AMMO PO 0 1
DCMA 0 1
0 3 0
BLK 4: Contractor's report format and content is acceptable subject to Government comments.
BLK 8: The Government requires thirty (30) calendar days to review and provide approval disposition. If applicable, the Contractor shall incorporate any Government comments and redistribute the final document within seven (7) calendar days of receipt of comments. The Government requires fifteen (15) calendar days for approval disposition.
BLK 9: "DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only, Administrative and Operational Use, 01 August 2021. Other request for this document shall be referred to Naval Surface Warfare Center, Attn: RS40, 700 Ammunition Road, Fallbrook, California. 92028."
BLK 10,12: Contractor shall notify the TPCO via email within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during First Article Test (FAT)/Lot Acceptance Test (LAT) and any destructive / nondestructive…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .