Exhibit A. CDRLS_MK 39 EMATT.pdf
PDF 1 MB Posted
- Attached to
- MK 39 Mod 3 EMATT Production
- Solicitation number
- N6660422R0002
About this file
This is a Contract Data Requirements List (CDRL) for the MK 39 EMATT production contract opportunity. The CDRL outlines seventeen (17) required data items to be delivered over the course of the ten-year production contract, including quality assurance plans, test reports, software documentation, engineering change proposals, and monthly status reports. Key deliverables include a Quality Assurance Program Plan due sixty days after award, test reports due thirty days after completion of validation tests, annual software bug lists, and engineering services reports tailored in technical instructions. Submission and approval processes, distribution statements, and addresses for delivery are provided for each required data item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1. DD Form 254.pdf | ||
| Attachment 2. EMATT TDP Option Worksheet.pdf | ||
| N6660422R0002.pdf | ||
| Attachment 3. PRST_Table.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in BLOCK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0006 A TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MK 39 EMATT
N66604-22-D-XXXX
PR # 1300947374
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Presentation Material
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81373 SOW Para. 4.1.1 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
A. ADDRESSEE
B. COPIES
8. APP CODE D
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
N/A SEE BLK 16 N/A SEE BLK 16 Reg Repro
16. REMARKS EMATT TPM 0 1 0
BLOCK 10, 12, 13: Contractor shall submit Presentation Materials no later than 7 days prior to each PMR and 1 hour prior to each TIM.
BLOCK 9: See Block 16 Addendum
BLOCK 14: Letter of Transmittal to COR
COR 0 1 0
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Joshua Stone, Code 8544
08/10/2021
DD Form 1423-1, FEB 2001 Previous editions may be used Page 1 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
0006 A TDP TM OTHER QCIC
A002 Quality Assurance Program Plan (QAPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81794A SOW Para. 4.1.2 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED
ONE/R - SEE
BLK 16
SEE BLK 16
A –SEE BLK 16 SEE BLK 16 N/A SEE BLK 16 Reg Repro
16. REMARKS EMATT TPM 1 1 0
BLOCK 8, 10, 12, 13: Approval shall be for technical content and contractual acceptance. Contractor shall submit draft 60 days after Contract Award. The
Government will review and comment within 14 days. Final shall incorporate all review comments and corrections. Contractor shall submit Fina1 14 days after Government review is completed.
COR 1 1 0
15. TOTAL 2 2 0
DD Form 1423-1, FEB 2001 Previous editions may be used Page 2 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
0006 A TDP TM OTHER NDTI
A003 Test Reports SEE BLK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B SEE BLK 16 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
BLOCK 3, 5:
SOW Para.4.1.3 Pre-Production Validation Test Report
SOW Para.4.1.3 First Lot Validation Test Report
SOW Para.4.1.3 Electronics Assembly Pre-Production Test Report
SOW Para.4.1.4 Factory Acceptance Functional Test Report
SOW Para.4.1.4 Environmental Test Report
SOW Para.4.1.4 In-Water Test Report
SOW Para.4.3 Engineering Services Test Report
BLOCK 10, 12, 13
The contractor shall deliver Pre-Production Validation Test Report, First Lot Validation
Test Report, and Electronics Assembly Pre-Production Test Report within 30 days of test completion.
The contractor shall deliver Factory Acceptance Functional Test Report, Environmental
Test Report, and In-Water Test Report with each lot delivery.
The contractor shall deliver Engineering Services Test Report as specified by Technical
Instruction
BLOCK 16: The Government will provide raw data and initial Government analysis for the In-water Test Report
DD Form 1423-1, FEB 2001 Previous editions may be used Page 3 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
0006 A TDP TM OTHER MISC
A004 Technical Report - Study/Services Serial Number Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B – SEE BLK 16 SOW Para. 4.1.4 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
BLOCK 4: Serial Number Report shall be an Excel file with the following data listed per serial number: Destination, Date of Manufacture, Maintenance Due Date (Date of
Manufacture plus 7 years)
BLOCK 10, 12, 13: Contractor shall submit Serial Number Report with each lot delivery.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 4 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A005 Certificate of Compliance
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-81356A SOW Para. 4.1.4.1 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
BLOCK 10, 12, 13: If Early Sampling is used; the Contractor shall submit Certificate of Compliance, in accordance with SOW Para. 4.1.4.1, prior to procuring activity's source inspector selecting samples.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 5 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
0006 A TDP TM OTHER SESS
A006 Reliability and Maintainability Test Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81585C SOW Para. 4.1.4.4 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
acceptance. If the cumulative reliability falls below 80%, measured at the end of each contract option, the contractor shall develop a Reliability Test Plan (RTP) to address the non-conforming running reliability requirement. The Government will review and comment within 30 days after receipt.
The contractor shall submit a final version to document results of the testing, The
Government will review and comment within 30 days after receipt.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 6 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A007 Technical Report - Study/Services Corrective Action Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 4.1.4.5 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
acceptance. If the reliability inspection sample does not meet the requirements of
Applicable Document 3.1, the contractor shall conduct a Failure Review Board. Upon completion of Failure Review Board, the contractor shall submit a Corrective Action plan at least two weeks prior to reliability inspection sample retest.
Final shall incorporate all review comments and corrections. Contractor shall submit
Fina1 7 days after Government review is completed.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 7 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A008 Technical Report - Study/Services Failure Review Board Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 4.1.4.5 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
acceptance. If the reliability inspection sample does not meet the requirements of
Applicable Document 3.1, the contractor shall conduct a Failure Review Board. Upon completion of Failure Review Board, the contractor shall submit a Failure Review
Board within 30 days of completion of the reliability inspection sample retest. The
Government shall have 30 days to review.
Final shall incorporate all review comments and corrections. Contractor shall submit
Fina1 15 days after Government review is completed.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 8 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A009 Technical Report - Study/Services Air Launch certification package
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 4.1.5 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
acceptance. The contractor shall submit an Air Launch certification package with any
RFVs, or ECPs to NAVSEA Drawing #8721731.
The Government will review and comment within 120 days. Final shall incorporate all review comments and corrections. Contractor shall submit Fina1 30 days after
Government review is completed.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 9 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A00A Technical Report - Study/Services Battery Design Package
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B – SEE BLK 16 SOW Para. 4.1.6 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
BLOCK 4: Documentation shall include all information required by S9310-AQ-SAF-
010 Navy Lithium Safety Program Responsibilities and Procedures, and SG270-BV-
SAF-010 (If Applicable) acceptance. The contractor shall submit an Battery certification package with any
RFVs, or ECPs to NAVSEA Drawing #312454 or lower level battery drawings
The Government will review and comment within 120 days. Final shall incorporate all review comments and corrections. Contractor shall submit Fina1 30 days after
Government review is completed.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 10 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A00B Supplier’s Configuration Management Plan Configuration Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80858D SOW Para. 4.2 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED
ONE/R –SEE
BLK 16
SEE BLK 16
acceptance. First submission shall be 6 months after award of the delivery order. The
Government will review and comment within 30 days after receipt. Resubmittal shall address all Government feedback and shall be submitted within 15 days after receipt of comments.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 11 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
0006 A TDP TM OTHER MGMT
A00C Diminishing Manufacturing Sources and Material Shortages
(DMSMS) Health Assessment Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-82273 SOW Para. 4.2.3 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED
ANNLY – SEE
BLK 16
SEE BLK 16
BLOCK 10, 12, 13: First submission shall be 12 months after production baseline is set.
Subsequent assessments to be submitted annually or as required due to major design changes.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 12 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
0006 A TDP TM OTHER IPSC
A00D Software Product Specification (SPS) Software Product Specification/ Source
Code
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-IPSC-81441A SOW Para. 4.2.4, 4.3 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED
ONE/R
SEE BLK 16
SEE BLK 16
8. APP CODE D 11. AS OF DATE
A - SEE BLK 16 SEE BLK 16 N/A SEE BLK 16 Reg Repro acceptance. Contractor shall submit Software Product Specification/ Source Code 1 month after the successful completion of First Lot Validation. The contractor shall resubmit for every software release. The Government will review and comment within
45 days. SPS delivery shall include source code. Final shall incorporate all review comments and corrections. Contractor shall submit Fina1 45 days after Government review is completed.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 13 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A00E Technical Report - Study/Services Software Bug list
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B SOW Para. 4.2.4 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED ANNLY 365DAC
N/A SEE BLK 16 N/A ANNLY Reg Repro
DD Form 1423-1, FEB 2001 Previous editions may be used Page 14 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
0006 A TDP TM OTHER MGMT
A00F Contractor’s Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81991 SOW Para. 5.0 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED MTHLY 30 DAC
N/A SEE BLK 16 N/A MTHLY THEREAFTER Reg Repro
DD Form 1423-1, FEB 2001 Previous editions may be used Page 15 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A00G Technical Report - Study/Services Engineering Services
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80508B – SEE BLK 16 SOW Para. 4.3 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
BLOCK 4: Specific tailoring to be provided with Technical Instruction.
BLOCK 8, 10, 12, 13: as specified in Technical Instruction.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 16 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A00H Engineering Change Proposal (ECP) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639E – SEE BLOCK 16 SOW Para. 4.2.1, 4.3 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
BLOCK 4: ECPs shall be submitted in CMPro.
BLOCK 8, 10, 12, 13: ECPs shall be submitted as required, or as specified in the
Technical Instruction. Class 1 ECPs shall be submitted and approved prior to incorporation. Class II ECPs shall be submitted quarterly and do not require approval.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 17 of 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the TIME/R for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
A00J Request For Variance (RFV) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80640E– SEE BLK 16 SOW Para. 4.2.1 NUWCDIVNPT
18 ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT REQUIRED SEE BLK 16 SEE BLK 16
BLOCK 4: RFVs shall be submitted in CMPro.
BLOCK 8, 10, 12, 13: RFVs shall be submitted as required. RFVs shall be reviewed by the Government within 30 days.
DD Form 1423-1, FEB 2001 Previous editions may be used Page 18 of 18
Block 16 Addendum
Action # 208320
This note applies to all Exhibit Line Items listed on all CDRLs.
BLOCK 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only
(Critical Technology) (4/08/20). Other requests shall be referred to NUWCDIVNPT code 853 or higher DOD authority.”
EXPORT WARNING NOTICE -This document contains technical data whose export is restricted by the Arms Export
Control Act (Title 22, U.S.C. Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE: For unclassified, limited documents, destroy by any means that will prevent disclosure of contents or reconstruction of the document.
| 2021-08-10T15:16:45-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:23:37-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:24:06-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:25:23-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:26:53-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:28:29-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:30:25-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:31:20-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:33:40-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:34:52-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:37:42-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:40:11-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:41:04-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:45:21-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:46:14-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:47:49-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:50:27-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
| 2021-08-10T15:52:39-0400 | |
| VANDENBERG.KRISTEN.MARIE.1549167426 |
File details come from the government source that posted it. Updated .